Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of The Interior was posted on December 13, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Indefinite Delivery/Indefinite Quantity Fire Protection Engineering Services

Closed
N3000080007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 16 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The National Park Service is seeking a qualified engineering firm to provide Fire Protection Engineering Services under an Indefinite Delivery Indefinite Quantity contract. The scope of work covers the National Capital Region, including Washington DC, Virginia, Maryland, and West Virginia. Services are divided into three tiers: Title I focuses on feasibility, scoping, and preliminary design; Title II covers detailed construction drawings and specifications for bidding; and Title III involves construction management and post-construction evaluation. The contract requires expertise in fire detection, suppression, and life safety design, with a strong emphasis on compliance with historic preservation standards and international building codes. The contract consists of a one-year base period with four optional one-year extensions, featuring a maximum ordering limit of 2,500,000 dollars and a guaranteed minimum of 10,000 dollars. Eligible firms must be registered in the District of Columbia, Virginia, Maryland, and West Virginia, and the prime contractor must employ a licensed fire protection engineer on permanent staff. Evaluation is based on technical competence, professional qualifications, a five-year record of past performance with government or private agencies, and geographic proximity to Washington DC. Large businesses awarded the contract must provide a comprehensive subcontracting plan to ensure opportunities for small and disadvantaged businesses.

General Info

NPS seeks fire protection engineering services in National Capital Region up to 2.5 million.

NAICS

541330 - Engineering Services

Place of Performance

The primary area of coverage is Washington, D.C., Maryland, Virginia, and West Virginia. See description for detailed requirem, CO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
The National Park Service (NPS), National Capital Region (NCR), 1100 Ohio Drive, SW, Washington, DC, 20242, is seeking (a) qualified engineering firm(s) or organization to provide Fire Protection Engineering Services under an Indefinite Delivery Indefinite Quantity (IDIQ) Contract. Professional registration or certification in the District of Columbia, Virginia, Maryland and West Virginia is required, based on project location. The North American Industry Classification System (NAICS) code for this procurement is 541330, Engineering Services, with a small business size of $4,500,000. This solicitation is open to small and large businesses. REQUIRED PROFESSIONAL DISCIPLINES: Fire Protection Systems (Detection, Suppression & Annunciation) and Life Safety design. Related services may include, but not be limited to: Civil, Mechanical, Structural, Electrical Engineering Design, Architectural Design and CADD drafting (use of AutoCAD and Microstation), and Cost Estimating and Project Scheduling. Use of Microsoft (MS) Word (word processing), MS PowerPoint (presentation), MS Project (scheduling), and construction cost estimating software, etc. may be required in the performance of task order requirements. PRIMARY SERVICES: Shall consist of, but not be limited to: feasibility study, condition assessment, on-site system testing, pre-design, design, supplemental and construction management services. A) Title I Services may include project scoping and programming, preparation of conceptual, schematic, and preliminary design documents including: outline specifications, preliminary and line-item construction cost estimates, submittal schedules and projected construction schedules. Projects may require investigation of existing conditions, knowledge and research of applicable industry regulations and codes; preparation of condition assessments and code compliance assessments, site and building surveys, hydrant flow, hydraulic, hydrostatic and functionality testing, preparation of schematic rehabilitation and treatment recommendations, preliminary fire protection system(s) design, (smoke, heat and fire detection, annunciation, fire suppression), emergency communications system design and design for specific code-compliant repairs or system upgrades, and related site planning and pre-design. Supplemental services may include feasibility and value analysis and value engineering studies, assessment of structural life safety systems, energy and life cycle cost analysis, hazardous material studies, architectural or historical architectural conditions assessment and associated professional or regulated services to accomplish specific project requirements. B) Title II Services may include design development of approved Title I Service work including, but not limited to: preparation of detailed construction drawings, specifications, bid schedules, submittal schedules and projected construction schedules. Deliverables of Title II services shall be prepared for bidding purposes. C) Title III Services may include providing construction management services such as submittal review, site inspection, periodic reporting of field observations, warranty assessment, and post-construction evaluation of system performance. Task Order performance periods may frequently be of short duration, i.e., 30-60 days for Title I work and 90-120 days for Title II up to and including submission of draft and final deliverables. Title III performance periods may vary based on construction project duration and system warranty period. AWARD CONSIDERATIONS: The Government intends to award a single contract from this announcement. An IDIQ contract is contemplated covering a base period of one (1) calendar year from contract award date, with four additional one-year option periods. Work will be ordered by issuance of firm-fixed price or not-to-exceed type task orders. The maximum ordering limitation per contract awarded will be $2,500,000.00 for the life of the contract. The guaranteed minimum per contract award for the life of the contract, which includes the base period and all options exercised, is $10,000.00. LOCATION AND TYPES OF PROJECTS: Projects will be located in the National Capital Region (NPS-NCR) encompassing portions of Washington DC, Virginia, Maryland, and West Virginia. However, other NPS Contracting offices may also be permitted to issue task orders against this contract. CODES, REGULATIONS AND STANDARDS: Projects require direct knowledge of, and experience complying with, National Park Service Director's Order-10A Design and Construction Drawings, Director's Order and Reference Manual-58 Structural Fire Management, as amended and in Director's Order 50B, Reference Manual 50B, Section 12, National Fire Protection Association (NFPA) Codes and Standards, 36 CFR Part 68: Secretary of the Interior's Standards for the Treatment of Historic Properties, Secretary of the Interior's Standards for Rehabilitation; and comprehensive knowledge of and direct experience with historic preservation philosophy in the United States, as expressed in the above documents. Projects require direct knowledge of, and experience in complying with the International Building Code (IBC) family of codes including, but not limited to: International Building Code, International Existing Building Code, International Mechanical Code, ICC Electrical Code, International Fire Code, and International Plumbing Code. Firms shall expect to have direct contact with federal, state or local regulatory agencies to assure compliance with regulations, codes and policies. The Government will not indemnify the firm(s) selected against liability involving asbestos or other hazardous materials; that is, a clause holding the firm harmless will not be included in the contract. Selection of firm(s) for negotiation shall be through an order of preference based on demonstrated competence and qualifications necessary for the satisfactory performance of the type of professional services required. TECHNICAL EVALUATION CRITERIA: Statements of Qualification will be evaluated by a selection board of the National Park Service personnel based upon the following specific evaluation criteria, listed in descending order of importance: 1. Specialized and extensive experience and technical competence of the prime contractor and any consultants in type of work required under this contract. The proposed work may be of short duration or may extend over several fiscal years, involving projects at various stages, which will require that the selected firm(s) must be capable of providing and managing a multi-disciplinary team from within the firm or in conjunction with sub-consultants. 2. Professional qualifications of individuals listed to perform under the contract, including individual licenses and experience in the work proposed; the prime contractor will be required to have a licensed fire protection engineer assigned to this contract on permanent staff. The prime contractor will also be required to have a registered professional engineer on permanent staff or under subcontract. The professional disciplines that are required include: engineering (civil, environmental, electrical, fire protection, mechanical, and structural), architecture and cost estimating. 3. Specific past performance records of a minimum of five (5) years on previous Fire Protection Engineering work performed for federal, state and local government agencies, and private industry documenting the firm's quality of work, history of meeting performance schedules, ability to control both design staff and project proposed and final design costs, and the ability to develop creative and sensitive solutions to unique historic building problems. References provided may be contacted as part of the evaluation process. 4. Capacity to Execute Task Order Requirements within Stated Performance Period: Demonstrate a proven track record for a minimum of five (5) to successfully satisfy client project requirements within specified project timeframes. Documentation shall reflect a history of meeting performance schedules. Identify design team members, performance period(s), scope of projects, and start/end performance dates. 5. Geographic proximity to the National Capital Regional Office in Washington, D.C. of fully-staffed professional offices and familiarity with local history, construction methods, environmental and historical regulations, and local and state permitting and review processes. SUBCONTRACTING PLAN REQUIREMENT: If the apparent successful respondent is a large business, the respondent will be required to submit a subcontracting plan. The subcontracting plan, which in accordance with Public law 97-507, requires the A/E firm to provide the maximum practicable opportunities for small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran-owned small businesses. The selected firm, if a large business must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan on that part of the work it intends to subcontract. The subcontracting goals for this contract are that a minimum of 19% of the contractor's intended subcontract amount be places with small businesses, 3% shall be placed with small disadvantaged businesses, 5% shall be placed with women-owned businesses, 3% shall be placed with veteran-owned small businesses, 3% shall be placed with service-disabled veteran-owned small businesses; and 5% shall be placed with HUBZone certified firms. The subcontracting plan is not required with this submittal; however, contract award is contingent upon negotiation of an acceptable subcontracting plan. SUBMISSION REQUIREMENTS: Firms that fully meet the requirements described in this announcement are invited to submit a Letter of Interest and a completed SF330 for each firm, a Team Standard Form 330, and an organization chart of the team. The organization chart shall include the names of the key personnel, firms, disciplines, roles and responsibilities and/or technical expertise. Submission of any additional supporting material is encouraged, but only to the extent that it graphically (via drawings and photographs) and substantiates the relevant project work specifically described on SF330. Additional information should not exceed 20 double-side pages. It is recommended that submissions be spiral bound and developed and assembled in a manner that chronologically corresponds and addresses the Technical Evaluation Criteria. Submissions received via e-mail or facsimile will NOT be accepted. In support of the sustainable practices of resource conservation and material recycling, submissions should be concise, make wise use of recycled/recyclable paper and other materials, and be organized in such a manner that the recyclable materials can be easily removed after evaluation. To the extent possible, printed/copied double-sided paper documents should be submitted. Registration in Online Representations and Certifications Application (ORCA) is encouraged in responding to this solicitation (http://www.bpn.gov). In addition, active registration in CCR is required in order to conduct business with the Federal Government. Responses must be received by 2:00 p.m. Eastern Standard Time, January 15, 2008 at the following address: National Park Service; Attn: Rocky Newton, 1100 Ohio Dr., SW Washington, DC 20242. Note: This is not a Request for Proposals. The Federal Acquisition Regulation website is www.arnet.gov. The website to obtain Standard Form 330 is: http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?formType=SF#1-1000. All responsible sources may submit an offer, which will be considered by the Government.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

about 23 hours ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

about 23 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS