Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

C--ONSITE ENGINEERING DESIGN SERVICES AT MSFC

Active
NASA-SNOTE-040818-001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract entails providing comprehensive architectural and engineering design services at the George C. Marshall Space Flight Center (MSFC) in Alabama, supporting over 200 facilities primarily dedicated to space systems research and development. The selected firm will deliver onsite services including planning, field investigations, and preparations of drawings and analyses needed for facility modifications, repairs, construction, and maintenance. Key responsibilities cover space utilization and real property support, master planning, cost estimating for the annual Construction of Facilities (CoF) program valued at about $40 million, and multi-discipline design services for local projects with construction costs generally under $500,000. Additionally, the contractor will manage historical drawing files, update utility maps, provide construction support, special studies, land surveys, geotechnical analyses, and configuration management, ensuring compliance with sustainability requirements including LEED certification for new constructions. The contract, with an anticipated start date of April 1, 2005, is valued at approximately $22.5 million over one year with four one-year options and is intended for firms registered within SBA’s Southern Region IV, specifically 8(a) small businesses. Applicants must have licensed professionals in architecture, civil, electrical, and mechanical engineering, and submit a management plan detailing organizational structure and staffing capacity corresponding to historical averages of about 45 personnel. Evaluation factors include organizational adequacy, sustainable design experience, technical capabilities in repair and construction of complex industrial and testing facilities, and relevant past performance with NASA or similar entities. The contract is expected to be a cost-plus-fixed-fee arrangement, with no bonding requirements, and submissions are to include Standard Form 330, while partnerships must clearly delineate division of labor.

General Info

Architectural and engineering design services for NASA MSFC facilities, $22.5M, 8(a) small businesses.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Synopsis of - Engineering Design Services Contract The Architect-Engineering Services to be provided under this procurement consists of planning and architectural-engineering design services for facility modifications, repairs, construction, and maintenance at the George C. Marshall Space Flight Center (MSFC), Alabama. There are over 200 facilities located at the MSFC campus. The majority of the facilities are in direct support of MSFC's complex space systems research and development programs and includes ultra-clean laboratories, engine test facilities, structural test facilities, vacuum chambers, wind tunnels, and office buildings. The selected firm will provide these services onsite at MSFC. The planning services include field investigation, and the preparation of sketches, drawings, analysis, and narratives for facility requirements definition to support space utilization/real property, master planning, and Construction of Facilities (CoF) activities. Space Utilization/real property support includes: (1) maintaining and updating the utilization floor plans, (2) providing office layout design support, (3) personnel relocation planning, and (4) updating and maintaining Facilities Functional Review website and related building photographs. Master planning support includes: (1) conduct miscellaneous studies of facilities, land use roadways, and other infrastructure in support of planning or CoF efforts, (2) updating and maintaining master planning documents such as maps, plans, analysis, graphics, etc., (3) updating and maintaining geographic information system data, (4) updating and maintaining the facilities data book, (5) providing historical survey and documentation support, and (6) providing support to update and maintain the Master Planning website. MSFC's annual CoF program includes approximately $40M of building, structure, and utility system repairs, alterations, modifications, and construction. The annual CoF program historically consists of between four and eight projects each having a construction cost greater than $500K. Support to the CoF program includes: (1) developing project programming data and cost estimates for the annual CoF budget process and out-year program plans, and (2) developing and maintaining strategic plans and integrating all planned and ongoing facility project activities. The engineering design services include; but are not limited to, preparing architectural, civil, structural, environmental, electrical, mechanical, fire protection, utility control system, and multi-discipline project designs in support of local projects (construction less than $500K) at MSFC. Project designs include criteria development, construction drawings, calculations, specifications, and cost estimates. MSFC has a Building Automation System, commonly referred to as the Utility Control System, that monitors and controls equipment and systems in the majority of buildings. Design services for the addition/modification of UCS hardware due to addition or modification of HVAC or process equipment will be required Historically, there are approximately 200 local projects having construction costs between $2K and $50K and 15 projects having construction costs between $50K and $500K. In addition to project designs, the selected firm will manage the historical drawing files, assess and update above and below ground utility maps, make recommendations for digging permits and perform construction support, special studies and tasks, land surveys, geotechnical analysis, and as-built preparation (CoF and local projects) and configuration management. The Facilities Engineering Department incorporates facility sustainability in planning, design, construction and maintenance. New construction will be Leadership in Energy and Environmental Design (LEED) certified. The value of the Engineering Design Services contract has historically been funded at approximately $4.5M annually and has had an average staff of 45 employees. The approximate organizational breakdown has historically included a Site Manager, 3-Architects, 2-Civil Engineers, 2-Structural Engineers, 5-Mechanical Engineers, 5-Electrical Engineers, 10-Drafting/Designers, 2-Contol System Designers, 6-Estimators, 5-Planners, and 4-Administrative Supports Assistants. Only those firms having registered professionals in the disciplines of architectural, civil, electrical, and mechanical engineering need apply. Only proposals that include a management plan, including an organizational break down showing the capacity to perform the work as listed above will be considered. Proposals that include a - Partnering approach with multiple branch offices, firms, consultants, etc. must show the division of labor between the partners. Factors for selection will include: 1.) The organizational structure proposed to perform the work which should specifically address the organizational breakdown as noted above and the firms flexible staffing plan, 2.) The capacity to perform the work, 3.) The firms experience in sustainable design, and 4.) The firms specialized experience and demonstrated capabilities in the planning, design and cost estimating for repairs, alterations, modifications, and new construction for buildings, structures, and utility systems associated with industrial buildings and complex test facilities. This solicitation is limited to 8a firms located in the Small Buisness Administration (SBA), Southern Region IV. All firms that respond must submit a Standard Form 330, Architectural-Engineering Qualifications. Preliminary Screening Criteria for Selection of EDS Contractor at MSFC The following preliminary screening criteria will be used to select the firms that will be presented to the A-E Selections Board for consideration. In order for A-E firms to be considered, they must: 1. Be located in SBA, Southern Region IV. 2. Provide Standard Form 330. 3. Have registered licensed professionals in the disciplines of Civil, Mechanical, and Electrical Engineering as well as Architecture. 4. Include in the proposal a management plan and organizational break down that clearly shows the capacity to perform the work and any division of labor for proposals that include partnering agreements. The period of performance for this contract is one year with four one-year options. The anticipated start date is April 1, 2005. The anticipated dollar value for this contract is $22,500,000. A cost-plus fixed fee contract is anticipated for this procurement. There are no bonding requirements. Evaluation criteria and all other provisions of Numbered Note 24 shall apply to this notice except that (a)in the sentence beginning "Selection of firms for negotiations," the fourth additional consideration listed is changed to read:"(4)past experience, if any, of the firm with respect to performance on contracts with NASA, other Government agencies, and private industry;" and (b) in the last sentence "National Aeronautics and Space Administration is substitued for "Department of Defense". Also, Note 24 refers to Standard Forms 254's and 255's. For this response to this synopsis only Standard Forms 330's will be accepted. The mailing address for all overnight packages is: NASA, Marshall Space Flight Center, attention: PS32C/Sandra Johnson, Rideout Road, Building 4471, Marshall Space Flight Center, AL, 35812 (located near Huntsville, AL). Hand delivered package may be presented to Ms Johnson in Building 4250, Room 36. THIS IS NOT A REQUEST FOR PROPOSAL--SEE NOTE 24.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle's Finance and Administrative Services (FAS) Capital Development division is seeking to establish on-call contracts with two qualified professional firms to provide structural and seismic/disaster engineering services. These consultants will provide technical expertise on an as-needed basis for small to medium projects across planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes performing structural engineering studies, seismic evaluations, confidence testing, and fall protection design, as well as preparing stamped construction documents, managing permitting, and providing construction administration and inspection for new and existing City facilities. The contract features an initial one-year term with options for four annual renewals, not to exceed a total duration of five years. To be eligible, firms must be licensed to practice in Washington State and the City of Seattle and demonstrate a track record of at least three relevant projects within the last seven years. Selection is based on a weighted evaluation of relevant technical experience (40%), approach and methodology (30%), an inclusion plan for women and minority firms (15%), and past performance (15%). All deliverables must adhere to specific FAS CAD standards and CSI MasterFormat specifications. Payment is processed within 30 calendar days of invoice receipt, with costs based on personnel salary rates and reimbursed direct non-salary expenses.
Finance and Administrative Services

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS