Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on August 30, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--PROJECT # 630A4-14-434 UPGRADE STEAM DISTRIBUTION SYSTEM ST. ALBANS VA MEDICAL CENTER

Closed
36C24218U0024Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 5 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The Department of Veterans Affairs is seeking a qualified Architect-Engineering firm to design the Upgrade Steam Distribution System at the St. Albans Campus in New York. The scope of work includes providing schematics, design development, technical specifications, and construction period services. Key technical requirements involve a thorough study of the existing system to recommend replacements for steam supply and return lines serving Buildings 88, 89, and 173, as well as replacing pumps, valves, and insulation in basement machine room pits. The firm must also employ a certified industrial hygienist for asbestos surveys and air monitoring. This procurement is restricted exclusively to Service-Disabled-Veteran-Owned-Small-Business firms, and subcontracting is not permitted. The estimated magnitude of construction is between 2 million and 5 million dollars, with the design phase expected to take 323 calendar days. All designs must comply with VA standards, NFPA codes, and ASHRAE 90.1. Interested firms must be registered in SAM and submit their qualifications via SF 330 by October 2, 2018.

General Info

SDVOSB firm to design steam system upgrades at St. Albans Campus, New York.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS;NEW YORK HARBOR HEALTHCARE SYSTEM ST. ALBANS;179-00 LINDEN BLVD.;ENGINEERING SERVI

Set-Aside

SDVOSBC

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project No. 630A4-14-434, UPGRADE STEAM DISTRIBUTION located in St. Albans NY VAMC, St. Albans Campus. This procurement is restricted to Service-Disabled-Veteran-Owned-Small-Business (SDVOSB) firms ONLY. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $7 Million. Magnitude of Construction is between $2,000,000.00 and $5,000,000.00. The anticipated award date of the proposed A-E Contract is on or before 12/01/2018. Potential contractors must be registered in SAM (www.sam.gov) at time of submission of their qualifications in order to be considered for an award. In order to assure compliance with this clause, all firms submitting an SF 330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) - subcontracting will not be permitted under this contract. I. The scope of Work: Provide all necessary labor and material for A/E services to design the Upgrade Steam Distribution System project at the New York Harbor Healthcare System-St Albans Campus. Develop construction documents, construction period services, and site trips. II. Specific Requirements: 1. Provide all necessary Architect/Engineer services to complete construction documents and specifications for the Upgrade Steam Distribution System project at the New York Harbor Healthcare System- St Albans Campus. 2. The A/E shall perform a thorough study of the existing steam distribution system and all associated piping, equipment, valves, pumps, traps, controls related to the steam distribution system and provide a recommendation for replacement. The project design shall include all items recommended for replacement. 3. The A/E shall provide construction documents and specifications to replace the steam supply and return main distribution piping from the Boiler Plant to the Laundry Building 173, and from the Boiler Plant to Building 88 and Building 89. 4. The project design involves removing the abandoned steam supply line that feeds Building 88 and Building 89 and replacing this line with a new steam supply line. The project design involves installing a new steam return line that serves Building 88 and building 89 and removing the existing steam return line serving Building 88 and Building 89. The project design includes repairing the existing steam supply that serves Building 88 and Building 89. The project design includes installing pipe hangers and supports, new valves, steam traps, strainers, check valves and expansion joints as required for the installation of the new steam supply and return lines. The project design includes replacing any missing or damaged pipe insulation on the steam lines serving Building 88 and Building 89. The A/E shall be responsible for developing a phasing plan for the steam line replacement. 5. The project design involves removing the existing steam supply line that is currently turned off that feeds Building 173 and replacing this line with a new steam supply line. The project design involves installing a new steam return line that serves Building 173 and removing the existing steam return line serving Building 173. The project design includes repairing the existing steam supply that serves Building 173. The project design includes installing pipe hangers and supports, new valves, steam traps, strainers, check valves and expansion joints as required for the installation of the new steam supply and return lines. The project design includes replacing any missing or damaged pipe insulation on the steam lines serving Building 173. The A/E shall be responsible for developing a phasing plan for the steam line replacement. 6. The project design includes removing and replacing the existing steam condensate pumps, vacuum pumps, steam valves, steam control valves, steam traps, expansion tanks and piping in the basement machine room pits in Buildings 88, 89, and 91. The project design includes installing new pipe insulation in the basement machine room pits in Buildings 88, 89 and 91. 7. The Architect/Engineer shall retain the services of a certified industrial hygienist to survey the existing steam distribution system to determine the quantities of asbestos-containing material required to be removed. The A/E shall be responsible for developing construction documents and specifications detailing the asbestos abatement required for the project. 8. The architect/engineer shall provide all necessary labor and material to conduct asbestos air monitoring during the asbestos abatement phase of the project. The architect/engineer shall provide a certified industrial hygienist to perform asbestos air monitoring during the asbestos abatement phase of the project. 9. All work shall conform to VA criteria and regulation. The project design shall comply with VA HVAC Design Standards & Criteria, VA Sustainability Design Guide, ASHRAE 90.1 and all applicable NFPA codes. 10. The A/E shall provide all A/E services necessary for preparation of complete construction documents and construction period services. Work includes verification of existing As-Built drawings, preparation of contract drawings & specifications, and detailed cost estimate. 11. The A/E shall provide complete contract drawings & specifications including demolition, architectural, plumbing, fire protection, structural and mechanical & electrical drawings for construction. 12. The A/E shall provide construction period services to include submittal review; shall also provide a response to RFI, site/visits/inspections and prepare As-Built drawings from contractor mark-up. 13. The A/E shall provide all A/E services necessary for preparation of complete construction documents and construction period services. Work includes verification of existing As-Built drawings, preparation of contract drawings & specifications, and detailed cost estimate. 14. The A/E shall be responsible for the development of the construction phasing plan, infection control risk assessment plan, and the interim life safety measures plan. 15. The A/E shall be required to provide 30%, 60%, 90% and 100% design drawings and specifications for review. The A/E shall follow the submission instructions outlined in the VA Program Guide PG 18-15 Volume C. 16. The A/E shall provide a share point or FTP site that the VA does not have restricted access to for drawing transfer, submittal submission and review during the project. III. Industrial Hygienist 1. The Architect/Engineer shall retain the services of a certified industrial hygienist to survey the existing steam distribution system to determine the quantities of asbestos-containing material required to be removed. The A/E shall be responsible for developing construction documents and specifications detailing the asbestos abatement required for the project. The architect/engineer shall provide all necessary labor and material to conduct asbestos air monitoring during the asbestos abatement phase of the project. The architect/engineer shall provide a certified industrial hygienist to perform asbestos air monitoring during the asbestos abatement phase of the project. IV. All designs shall conform to NFPA 101 Life Safety Code, NFPA 99 Healthcare Facilities, NEC, ASHRAE 90.1 and VA Standards & Criteria. V. The following must be incorporated into the A/E design: 1. Meet with the VA Engineering Staff to determine the exact functional requirements to be used for the design. 2. Recommend various options for the hospital engineers to evaluate. Options should include completion time, phasing, noise, dust, infection control, construction cost, impact, feasibility and compliance with overall hospital objectives. 3. Provide all necessary site survey work to verify As-Built drawings and field conditions. 4. Provide construction period services and site visits. VI. The A/E shall have all available As-Built drawings (it is the A/E s responsibility to verify the accuracy of said drawings): 1. Mechanical 2. Electrical 3. Architectural 4. Structural 5. Plumbing VII. Document reviews The A/E shall furnish and provide three (3) sets of drawings and specifications and detailed cost estimates at completion stages of 30%, 60%, 90% and 100%. Provide three (3) sets of completed contract drawing and specifications for bidding purpose and three (3) copies of 100% detailed cost estimate. Contract Originals and As-Built drawings: Contract originals shall be prepared on standard VA drawing sheets using AutoCAD (version 14 and 2016). The A/E shall provide one (1) set of drawings to the VA for record plans at the completion of the design. The A/E shall incorporate all of the construction changes to the As-Built drawings at the completion of the construction, and the A/E shall turn over the changes in the As-Built drawings to the VA. AE shall incorporate the service of Multivista Photograph or equivalent to take construction documentation photos for photographic documentation of the project at 8 Interior Progressions, a Detailed MEP Exact Build, and Finished Exact Build. All contractor employees under this contract are required to complete the VA's online security awareness training course and the privacy awareness training course annually. The privacy awareness training requirement may be fulfilled under additional privacy awareness training options. Contractors must provide signed certifications of completion to the COR during each year of the contract. This requirement is in addition to any other training that may be required of the Contractor and subcontractor(s). The C&A requirements do not apply, and a Security Accreditation Package is not required. All work shall be done at the VA Medical Center, 179-00 Linden Blvd., St. Albans, NY 11425 in accordance with the work described above and/or tasks described in this contract. COST RANGE Estimated Construction Cost Range: $2,000,000.00 and $5,000,000.00 TYPE OF CONTRACT CONTEMPLATED The Department of Veterans Affairs is contemplating awarding a firm fixed price contract. ESTIMATED START AND COMPLETION DATES The Department of Veterans Affairs requires design and contract support services. The estimated start and end dates for the design and start and end dates for the construction are as follows: Design: Start Preliminary and Schematic Design Phase - 14 days Submit 30% Preliminary and Schematic Design Phase for VA review - 90 days Review 30% Preliminary and Schematic Design Phase (VA comments to A/E) - 105 days Submit 30% Preliminary and Schematic Design Phase - 112 days Review 60% Design Documents for VA review - 157 days Submit 60% Design Documents (VA comments to A/E) 171 days Review 60% Design Documents - 178 days Submit 90% Design Documents for VA review - 223 days Review 90% Design Documents (VA comments to A/E) - 237 days Submit 90% Design Documents - 244 days Review 100% Design Documents for VA review - 274 days Submit 100% Design Documents (VA comments to A/E) - 288 days Review 100% Design Documents - 295 days Contracting Review 316 days Deliver Final 100% Design Documents for Bidding Purposes - 323 days A total number of days for entire design is 323 calendar days from notice to proceed. Construction: Number of calendar days to complete construction and IGCE to be proposed by the AE firm upon completion of the design. SELECTION CRITERIA The Department of Veterans Affairs shall evaluate each potential contractor in terms of its: (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; experience presented in SF330 must indicate/reflect same or greater magnitude projects with similar or greater complexity and must be designed and constructed within last 5-7 years within design and construction funding limitations. (6) Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. (7) Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (8) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. LIMITATIONS This procurement is restricted to Service-Disabled-Veteran-Owned-Small-Business (SDVOSB) firms ONLY. SUBMISSION REQUIREMENTS Qualified Service-Disabled-Veteran-Owned-Small-Business (SDVOSB) firms are required to submit three (3) hard copies of the SF 330 (which can be downloaded from www.gsa.gov/forms). All packages shall be submitted no later than 4:00 PM, EST on 10/02/2018. All submittals must be sent by EMAIL to contact@example.gov . The submission must include an insert detailing the following information: 1. Dun & Bradstreet Number; 2. Tax ID Number; 3. The e-mail address and phone number of the Primary Point of Contact and; The Contracting Officer is not responsible for not receiving submissions due to the offeror misaddressing the package or illegibility of the information. NOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only (contact@example.gov ); telephone and mail inquiries will not be honored. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS