This Government Contract opportunity from Department Of Veterans Affairs was posted on March 1, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C1DA--EHRM Infra Upgrades Design - Jackson, MS

Awarded
36C77621R0152Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 3 hours ago

DEADLINE

in 26 days
NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals under solicitation number 26/27-15 for a qualified structural engineering firm to provide on-call services on an as-needed basis. The scope of work involves the review, analysis, inspection, and design of municipal infrastructure. To be eligible, the consultant must be a professional engineer licensed in the State of Connecticut. Proposals are due by October 29, 2026, and must be submitted electronically via the Town's procurement portal. The selection process is based on a points-based scoring method evaluating qualifications, relevant experience, key personnel, and hourly pricing, though the award is not based solely on cost. The Town reserves the right to shortlist candidates for interviews and negotiate with the selected vendor prior to the final award. Contractors must adhere to strict insurance requirements, including General Liability, Professional Liability, Cyber Risk, and Environmental Liability, each with minimums of 1,000,000 dollars. Additionally, the contract is subject to the Town of Manchester Living Wage Ordinance for values exceeding 25,000 dollars per fiscal year, requiring specific hourly wage rates for eligible employees and the submission of a Living Wage Certification. Required submission documents include a PDF proposal, a current IRS Form W-9, a SAM number, and a disclosure of any municipal litigation or arbitration from the past ten years. All services must comply with the laws of the Federal Government and the State of Connecticut.
Engineering

POSTED

about 4 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Department of Veterans Affairs Program Contracting Activity Central awarded a firm-fixed price design contract to Planate Management Group LLC for Architect-Engineer services at the G.V. Sonny Montgomery VA Medical Center in Jackson, Mississippi. The total award amount is 2,263,812.00 dollars. This project, a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 541330, focuses on infrastructure upgrades to support the new Electronic Health Record Modernization system. The scope of work includes comprehensive design phase services such as feasibility studies, schematic drawings, and construction documents, as well as construction period services including RFI responses, site visits, and final inspections. The technical requirements encompass a wide range of disciplines, including electrical panel and power upgrades, bonding, UPS, building management system interfaces, HVAC assessments, communication infrastructure upgrades to Cat 6A, fiber backbone improvements, and physical security upgrades across Main Building 1 and Clinical Addition 2. The design process required a full team of licensed professionals, including architects, various engineers, and security specialists. The anticipated period of performance for the design phase was 144 calendar days from the notice of award, with construction period services exercised as options to match the duration of the subsequent construction project, which has an estimated magnitude between 20,000,000 and 50,000,000 dollars.

General Info

Contract Value

$2,754,031.54

NAICS

541330 - Engineering Services

Place of Performance

OH, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award 36C77623C0013 - EHRM Infra Upgrades Design - Jackson, MS

DOCX, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts1 person available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Susie SissonContract Specialist

Full Description

Show more
THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330 ARCHITECT-ENGINEER QUALIFICATIONS PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY FOR, NOR REIMBURSE, ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION The Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect-Engineering (A-E) services for Design Project 586-21-102 - EHRM Infrastructure Upgrades Jackson for the G.V. (Sonny) Montgomery VA Medical Center at 1500 E. Woodrow Wilson Avenue, Jackson, MS 39216. The A-E shall provide investigative and feasibility design services, schematic design drawings, design development drawings, construction documents, final bid documents, specifications, calculations, cost estimates, narratives, solicitation support services, and construction period services for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities infrastructure to allow for the new Electronic Health Record Modernization (EHRM) system. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 Architectural and Engineering Services, VA Acquisition Regulation 836.6, and VA Acquisition Manual M836.6 Architect-Engineer Services. In accordance with FAR 36.209, Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The NAICS Code for this procurement is 541330 Engineering Services and the annual small business size standard is $16.5M. A full design team is required to complete this project. The projected award date for the anticipated A-E contract is on or before February 25, 2022. The anticipated period of performance for completion of design is 144 calendar days after Notice of Award (NOA). The VAAR Magnitude of Construction for this project is between $20,000,000 and $50,000,000. 3. SCOPE OF DESIGN The scope of this project is to provide the following infrastructure improvements to the G.V. Sonny Montgomery VA Medical Center: A-E Part One Services (also known as Design Phase Services) for this design project includes site visits, field investigation, studies, and user interviews to prepare drawings, investigative and feasibility design services, schematic design drawings, design development drawings, construction documents, final bid documents, specifications, calculations, cost estimates, and narratives for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities infrastructure to allow for the new Electronic Health Record Modernization (EHRM) system. The scope of this project includes, but is not limited to, the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)); Bonding; UPS; Building Management System interfaces; assessment for new and upgrades to existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, life safety); communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; assessment and upgrade of fiber infrastructure backbone campus-wide, within buildings and between buildings; and hazardous material abatement. Project Building locations include: Main Buildings 1, and Clinical Addition 2, A-E Part Two Services (also known as Construction Period Services) for this design project includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project; attendance at pre-bid, post-award, and commissioning kick off construction project conferences; review of construction material submittals and shop drawings; approximately 2 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications; preparation of site visit reports; coordination with project commissioning requirements; review of any construction project modifications for cost and technical acceptability; attendance and participation during the final acceptance inspection; preparation of the punch list; and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log, and provide meeting minutes for weekly construction meetings throughout the duration of construction. The A-E shall review the Contractor s requests for information and cost proposals for construction change orders when requested by the COR. The A-E s reply regarding the review of cost proposals and recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A-E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes. The A-E shall be professionally licensed in any state in the United States. The A-E is responsible for all services to complete the deliverables listed in the Statement of Work (SOW) (See AE Design SOW EHRM Infrastructure Upgrades Jackson Final). The deliverables outlined in the SOW are inclusive of the following: Quality Assurance/Quality Control Plan, Basis of Design (10%), Schematic Design (35%), Design Development (65%), Construction Documents (95%), Final Bid Documents (100%), Solicitation Support Services, and Construction Period Services. The deliverables schedule can be found in the SOW. Please note that the 144 calendar-day period of performance for the design completion begins with the issuance of the Notice of Award (NOA) and that a Notice to Proceed (NTP) will not be issued for the completion of a design project. The construction period services will be option items that will be exercised after the award of the construction project. The period of performance for construction period services will match the period of performance for the construction project. 4. A-E SELECTION PROCESS Firms submitting SF 330s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for initial selection evaluation. The selection process will be made using a two-phase process. Phase I consists of the initial evaluation of the provided SF 330s and determination of the highest rated firms. A minimum of three of the highest rated firms will then be shortlisted and invited to continue with Phase II of the process. All firms not shortlisted will be notified at this time. Phase II consists of written responses for the shortlisted firms and selection of the top ranked firm to receive the solicitation and conduct negotiations. The firms selected for the written responses will be notified by email of selection and provided further instructions as well as all evaluation criteria requirements. After the written responses are received, the firms will be evaluated and the highest rated firm will be selected and sent the solicitation, and negotiations will follow. A site visit will be authorized for the highest rated firm during the negotiation process. Award selection will be made based on the results of the written responses and successful negotiation of rates and fees for the project, and not the SF 330 qualifications from Phase I. If negotiations are not successful with the highest rated firm, they will continue with the next highest rated firm, and so on until award can be made. Please note that during the evaluation of the written responses, the prior evaluation of the SF 330s will not be taken into consideration as they shall be considered separate evaluations. 5. PHASE I SF 330 SELECTION CRITERIA The following are listed in descending order of importance: Primary Selection Criteria: Professional Qualifications: Professional Qualifications necessary for satisfactory performance of required service. The design firm and A-E on staff representing the project or signing drawings in each discipline must be licensed to practice in any one of the United States of America. Provide Professional License numbers and/or proof of Licensure. The evaluation shall consider the specific experience and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full-time employees) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located. Key positions and disciplines required for this project include, but are not limited to: Architect (LEED certified), CADD Technician, Registered Communications Distribution Designer (RCDD), Estimator, Civil Engineer, Electrical Engineer, Environmental Engineer, Fire Protection Engineer, Industrial Hygienist, Mechanical Engineer, Plumbing, Project Manager, Quality Assurance, Structural Engineer, and Physical Security Specialists. The lead key personnel in each discipline must be registered professionals but do not have to be registered in the particular state where the project is located. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ___________________, [company] __________________, certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance with 48 CFR 852.219-10. The information provided in sections C through E of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Specialized Experience: Specialized experience and technical competence in the design and construction period services provided for network infrastructure installation, renovations, or upgrades. Include no more than six Government and private experience projects similar in size, scope, and complexity. Projects should include fiber optics, data cable, electrical upgrades, uninterruptable power systems (UPS), bonding, building management systems/building automation systems (BMS/BAS), HVAC, IT room renovation or relocation, Data Centers/Server Rooms, and physical security upgrades. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control protocols, energy conservation, sustainable design practices, and specialized building types requiring physical security measures. The evaluation will consider the management approach, coordination of disciplines and subcontractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects, and familiarity with VA Design Guides/Manuals, Master Specifications, and other applicable standards. The information provided in sections F and G of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Capacity: Capacity to accomplish work in the required time. The evaluation will consider the firm s ability to meet the compressed schedule of the overall project, as well as the available capacity of key disciplines to perform the work in the required time. Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months, and the full potential value of any current indefinite delivery contracts. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies toward the team/personnel provided in the SF 330. Past Performance: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. The past performance will be evaluated for all projects provided in section F, to include a review of Contractor Performance Assessment Rating System (CPARS). The following information is required for all projects noted in section F: contract/task order number, project title, prime firm, start date, and completion date. Evaluations may also include additional performance-related information from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Evaluations will consider superior performance ratings on recently completed VA projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Also, consider, as appropriate, the record of significant claims against the firm because of improper or incomplete architectural and engineering services. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member performing the work under this contract. The information for this factor shall be provided in Section H of the SF 330. If there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. *PPQs should not be submitted by the evaluator to VHA PCAC directly. Completed PPQs must be incorporated into the SF 330 submission. PPQs will be counted toward the page limitation for this submission. Locality: Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, local construction methods, or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330. Note that the intent of this factor is to showcase a firm s understanding of the site and locality, and not where the firm is located and how they would travel to the site. Information related to the firm s location shall be provided in section H, under Secondary Selection Criteria Factor 1 - Geographic Location. Construction Period Services: Experience in construction period services to include professional field inspections during the construction period; review of construction submittals; support in answering requests for information (RFIs) during the construction period; support of construction contract changes to include drafting statements of work and cost estimates; attendance at weekly conference calls; providing minutes of meetings between the A-E, VA, and contractors; pre-final inspection site visits; generation of punch-list reports; and production of as-built documentation. The information for this factor shall be provided in Section H of the SF 330. Secondary Selection Criteria: Geographic Location: Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location and the G.V. (Sonny) Montgomery VA Medical Center. Determination of the mileage will be based on Google Maps (www.google.com/maps/dir/). *The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of the SF 330 evaluations. The secondary selection criterion will not be applied when determining a firm s SF 330 submission Excellent, Acceptable, Good, Marginal, or Unacceptable. The information for this factor shall be provided in Section H of the SF 330. 6. PHASE II WRITTEN RESPONSES SELECTION CRITERIA In accordance with FAR 36.602-3(c), discussions will be conducted in the form of written responses. The selected firms will be invited to present their written responses to predetermined questions via email to the A-E Technical Evaluation Board. The instructions for the written responses will be provided to the selected firms only. Each selected firm will be evaluated based on their responses to the evaluation criteria. The highest-ranked firm will be selected based on their ratings from the written responses. The previous ratings from the SF 330 evaluations are not applicable during Phase II. Below are the evaluation factors for the written responses. All factors listed are of equal importance. Proposed Management and Coordination Plan: Discuss confidence and approach to completing a project of this scale with an expedited period of performance. Explain quality control methods that will be used throughout each design phase and prior to each submission. Describe strategy for control of estimated cost and solutions for anticipated problems. Discuss proposed design team and their specific strengths and experience that make them the best fit for this project. Discuss how the design teams will work together, and with the VA, to keep this design on schedule, within budget, and compliant with VA design requirements. Approach to Project Challenges: Discuss approach to overcome geographical obstacles considering the number of site visits needed for this specific project (address both design phase site visits as well as CPS visits). Discuss ability, familiarization, or experience with VA design guides and directives and their interpretations and application to this design. Describe plans with this project to ensure VA requirements are kept current, and specified equipment will be TRM approved. Proposed Approach to Design Development: Discuss plan to ensure specifications and drawings are well edited, accurate, all inclusive, and in coordination with each other. Discuss approach to evaluate existing site conditions and ensure new work will not conflict with existing work. Expectations for VA A-E Collaboration: Discuss what expectations the A-E firm would have from the VA for this project. Describe strategy for collaboration meetings throughout each phase and their significance to the overall end-product. 7. SUBMISSION CRITERIA/REQUIREMENTS The below information contains the instructions and format that shall be followed for the submission of the SF 330 Statement of Qualifications: Submit ONE (1) SF 330 Statement of Qualifications via email to Contract Specialist Zachary Penhollow at Kara A. Evert at contact@example.gov. This shall include Parts I and II and any applicable attachments. The SF 330 submission is due by 2:00 PM ET ON FRIDAY, NOVEMBER 18, 2021. The SF 330 shall be submitted in one email and have a file size no larger than 5 MB. No hard copies will be accepted. The subject line of the email shall read: SF 330 Submission - 36C77621R0152 EHRM Infrastructure Upgrades - Jackson. The submission must include the SF 330, Architect-Engineer Qualifications (form is available online at http://www.cfm.va.gov/contract/ae.asp). The SF 330 submission shall not exceed a total of FIFTY (50) pages. This includes CPARS and/or PPQs and any other relevant information. Any pages submitted by an offeror that exceed the limit will not be considered during the evaluation. Each page shall be in Arial or Times New Roman, size 12 font, single spaced. The title page, table of contents, and Part II of the SF 330 Form will NOT count toward the page limitation. A PPQ from previous projects may be submitted for this project. If significant portions of a project have been completed since the previous PPQ was filled out, a new PPQ should be submitted to accurately assess the project. *Important Note: For this procurement, all PPQs should be completed by the evaluator and returned to the A-E firm. The submitting A-E firm must incorporate completed PPQs into the SF 330 document. PPQs should not be submitted by the evaluator directly to VHA PCAC. In addition to the SF 330 submissions, firms must provide a second accompanying document that includes the following information (the accompanying document will not count toward the page limitation of the SF 330): Cage Code Dun & Bradstreet Number Tax ID Number The email address and phone number of the Primary Point of Contact A copy of the firm s Vet Biz Registry All questions shall be submitted to contact@example.gov with the subject line Jackson EHRM Question - 36C77621R0152. The cutoff for question submission is 2:00 PM ET ON TUESDAY, NOVEMBER 2, 2021. Questions will be answered through modification to the Pre-Sol Notice posted to Contract Opportunities at https://beta.sam.gov/. NOTE: This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSBs will not be considered. All SDVOSBs must be listed as verified by the VA s Center for Verification and Evaluation (CVE). Offerors must be verified by CVE and visible in the Vendor Information Pages (VIP) database (http://www.vetbiz.va.gov/vip/) at the time of SF 330 Submission, Written Response Submission, and Award. Failure to be BOTH visible and verified at these times will result in the offeror being deemed unacceptable and ineligible for award. All prime firms are required to meet the NAICS code requirement specified for this project. The Contracting Officer shall verify the NAICS code in VIP and/or the System for Award Management (SAM). Failure to meet the NAICS code requirement may result in the rejection of the SF 330 submission. All Joint Ventures must be CVE verified at the time of SF 330 Submission, Written Response Submission, and Award and must submit agreements that comply with 13CFR 125.15 prior to contract award. SF 330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror s responsibility to check the Contract Opportunities website at https://beta.sam.gov/ for any revisions to this announcement prior to submission of SF 330s.

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 238210
New
Federal
Y1DZ--Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
Solicitation # 36C77626B0020
Solicitation 36C77626B0020 is a competitive small business set-aside for the FY27 NRM Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction project at the Brooklyn VA Medical Center in New York. The scope of work involves installing a dedicated life safety branch with automatic transfer switches and electrical distribution equipment in Building 1, upgrading equipment to exceed three-phase asymmetrical fault current expectations, and remediating code violations identified in a previous electrical study. The project must be completed within 540 calendar days after the notice to proceed and must comply with NFPA 70, NFPA 110, and VA electrical design requirements for healthcare facilities. The contract is awarded based on the lowest price from a responsible bidder, with a construction magnitude estimated between 10 million and 20 million dollars. Key requirements include adherence to the Davis-Bacon Act for wages, Buy American requirements for construction materials, and the submission of an electronic bid bond on Standard Form 24. Following several amendments, the final bid opening deadline is November 24, 2026, at 3:00 PM EST. Bids must be submitted via email and include a signed SF 1442, a firm fixed price schedule in whole dollar values, and verification of current representations and certifications in SAM.gov.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 236220
New
Federal
605-341 - Relocate Dialysis Minor Construct - Loma Linda, CA
Solicitation # 36C77627Q0025
The Department of Veterans Affairs, through the Program Contracting Activity Central, is conducting market research via a Sources Sought Notice for the relocation and expansion of dialysis operations at the Jerry L. Pettis Memorial Veterans Hospital in Loma Linda, California. The project aims to improve Veteran access and replace deteriorated plumbing by moving operations from the fourth floor to the ground level. The scope of work includes the construction of a new 12,500 square foot two-story dialysis center, the remodeling of 3,400 square feet of existing space on the first and second floors, and the alteration and rerouting of the emergency access road, which will require earthwork and retaining work for an adjacent water pond. Key technical requirements include the installation of dialysis reverse osmosis plumbing components and waste lines. The estimated magnitude of construction is between $10 million and $20 million, with a projected performance period of 730 calendar days from the Notice to Proceed. The government intends to utilize a design-bid-build approach through a competitive, firm-fixed-price contract, with the final procurement method determined by market research results. Depending on the path chosen, the award will be based on either price and technical factors under FAR Part 15 or price only under FAR Part 14. The formal solicitation is planned for advertisement in late December 2026 or early January 2027. Interested parties under NAICS code 236220 were required to submit capability statements by November 3, 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WV
Solicitation # 36C77627Q0036
The Department of Veterans Affairs, through the Program Contracting Activity Central, is conducting market research via a Sources Sought Notice for the EHRM Infrastructure Upgrades Construction project at the Martinsburg VA Medical Center in West Virginia. The project involves comprehensive construction and modifications to existing campus buildings to support the new Electronic Health Records Modernization system. A general contractor will be required to provide all labor, materials, and supervision for site preparation, demolition, and the installation of heavy-gauge metal stud partitions, MEP rough-ins, and specialized room finishes, including fire-rated drywall and static-dissipative tile flooring. The work must adhere to strict VA design and construction criteria, including PG-18 standards and NFPA 101 fire stopping requirements, while maintaining operational continuity for critical telecommunication services. The project is estimated to take approximately 700 days, divided into two primary phases starting in December 2027 and concluding in September 2029. Final acceptance of the Telecom Rooms will be managed by the VA OIT department following rigorous commissioning and testing. While no formal solicitation currently exists, the government is evaluating whether to issue a Request for Proposal under FAR Part 15 or an Invitation for Bid under FAR Part 14. Interested respondents under NAICS code 236220 must submit a capabilities statement, a completed Project Labor Agreement questionnaire, and a letter of intent regarding bonding capacity by the specified deadline. The final determination regarding socio-economic set-asides will be based on the results of this market research.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS