C1NZ--659-24-903 | Steam Line Replacement Project |

Active
36C24623Q0367Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Veterans Affairs (VA) at the W.G. (Bill) Hefner VA Medical Center in Salisbury, North Carolina, is seeking Architect/Engineering (A/E) qualification packages for a Steam Line Replacement Project. This firm fixed-price contract involves comprehensive design and construction period services, including schematic design, development of construction documents, technical specifications, site visits, cost estimating, and as-built documentation for the replacement of underground steam lines connecting Building 18 to Building 10. The project addresses urgent issues with leaking steam lines identified via thermal imaging and aims to reduce make-up water consumption that causes corrosion. Given the medical center’s operational status, careful phasing plans and provisions to maintain service during outages are critical. The A/E firm will be responsible for a full range of engineering services—from field investigations and user interviews to preparation of construction-ready documents—ensuring compliance with VA design manuals, industry standards, and life safety codes. The scope includes detailed engineering for excavation, insulation, pipe fitting, emergency connections, vaults, temporary boiler systems, and site restoration. Coordination with contractors and VA personnel is essential throughout the design and construction phases, with multiple design submittals and reviews scheduled over a 365-day timeline. The A/E must adhere to VA master specifications, environmental and physical security requirements, and federal regulatory standards. Design deliverables include 3D BIM/Revit models, CAD drawings, and various electronic and printed formats. The contract also allows for optional solicitation support and construction period services, including responding to RFIs, reviewing submittals, conducting site visits, and assisting with final project acceptance. The project emphasizes quality assurance, cost control, and compliance with VA’s infrastructure standards, making the selected A/E firm integral to the successful modernization of the VA’s steam distribution system.

General Info

Design and construction services for underground steam line replacement at VA Medical Center, ensuring compliance.

NAICS

541330 - Engineering Services

Place of Performance

VA

Set-Aside

NONE

Documents

1

36C24623Q0367 - Steam Line Replacement Project

DOCX, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)
Contacts1 person available
OfficeHAMPTON, VA, 23667, USA
Office AddressHAMPTON, VA, 23667, USA
Contacts
Angela WilsonContracting Specialist

Full Description

Show more
THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR SF 330'S ARCHITECT/ENGINEER QUALIFICATION PACKAGES ONLY. GENERAL INFORMATION: The W.G. (Bill) Hefner, VAMC, Salisbury, North Carolina seeking sources and intends to award a firm fixed-price contract for Architect/Engineering (A/E) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project # 659-24-903, Steam Line Replacement Project located at 1601 Brenner Avenue, Salisbury, NC 27705. The Salisbury VA Medical Center is a working facility and phasing plans for minimizing downtime, and provisions for continuation of service during outages is critical to this project. Point of Contact: Angela Wilson, Contracting Specialist Email: contact@example.gov The NAICS Code for this procurement is 541330 Architectural Services, and the applicable Small Business Size Standard is $16.5 million annual revenue. The NAICS code for the anticipated Construction project is projected to be 236220 and magnitude of construction is predicted to be between $10,000,000 and $20,000,000. The anticipated award date of the construction phase of the project is to be determined (TBD). An Architect & Engineer (A/E) contract will be negotiated for the development of complete construction documents which include working drawings, specifications, reports, and construction period services. The A/E will be given written information; participate in project planning meetings, pre-proposal meeting, and pre-construction meeting as required; communicate with VA personnel via telephone or e-mail; and is expected to coordinate so that the final documents include all requirements in accordance with industry standard practices, VA standards, VA design manuals, and review comments. SCOPE OF WORK: Steam Line Replacement Project Number: 659-24-903 SCOPE OF WORK 1. Project Requirements Department of Veterans Affairs, Salisbury NC requires a main steam line replacement from building 18 to building 10. Currently, the underground lines have leaks as shown by thermal imaging taken by a drone. The VAMC is using an enormous amount of make-up water causing corrosion issues in the system. A-E Part One Services (also known as Design Phase Services) for this design project include site visits, field investigation, studies, and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to replace underground steam lines from building 18 to building 10. The initial phase is to produce an acceptable design for bid. This design will allow the Design-Bid-Build (DBB) Contractor to provide the following services: a. Provide engineering services to accompany the following installation services: i. Installation Contractor is to perform all work to furnish and install a complete and operational steam distribution system for the VA campus. Work includes general construction of underground main lines, including all insulation, supports, ground work, earth work, welding, and pipefitting. Work shall be designed in strict accordance with specifications and drawings. b. Proposed steam lines will be as follows. (Pipe sizes to be determined by engineer considering existing and future building loads.) All sizes and flow rates will be verified by A/E firm. A/E will confirm existing connections and fully investigate to ensure the existing utilities can support the existing load during the design phase. i. Earth work ii. Emergency connection for Temp Boilers iii. Insulation iv. Pipe Support v. Locating vi. New vaults vii. Steam driven sump pumps for vaults viii. Removal of existing lines ix. Phasing of project x. Temporary boilers to feed critical buildings xi. Generators to run Temp Boilers xii. Excavation equipment xiii. Valves and associated fittings xiv. Locating all utilities and unknowns of work xv. Landscape after work is complete xvi. Concrete removal and install in construction area xvii. Testing c. The scope of engineering services shall include: i. Attend an on-site kick-off meeting with the VA Contracting Officer s Representative (COR) to define project details, including work schedule. ii. Evaluate station steam flow rates and perform steam line sizing calculation to confirm proper size of steam mains. iii. Develop a performance-based specification for the installation contractor to provide updated steam main for campus. iv. Develop drawings and write specifications for the work described above. v. Deliver three submittals for VA review and comment: at the 10%, 65%, 95% and 100% design stages, then followed by a Final Issued for Construction (IFC) submittal. The 10%, 65%, 95% and 100% review submittals will be provided electronically only. The IFC submittal will be provided in PDF (.pdf) format and printed form, including 5 bound copy sets, sized as per COR. vi. Produce As-Built record drawings based on Contractor supplied red-line as-built markup drawings. The complete and accurate As-Built drawings will be provided in AutoCAD (.dwg), Revit (.rvt) and PDF (.pdf) formats and in printed form, including 3 bound copy sets, sized as per COR. Thermal Images of Steam Lines 2. A&E Standards A/E firm shall be responsible for complying with all applicable Department of Veterans Affairs Master Specifications. An entire listing of the Department of Veterans Affairs Master Construction Specifications can be found at http://www.cfm.va.gov/til/spec.asp. A/E firm shall refer to PG 18-10 (see attached page) for design manual index. https://www.cfm.va.gov/til/dManual.asp Salisbury VAMC Design and Construction Manual (Attachment 1) A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. 3. DESIGN WITHIN FUNDING LIMITATIONS: The design shall be prepared by the A-E to permit the award of a construction contract, using Federal Acquisition Regulation procedures for the construction of the facilities. The design project must comply with VAAR 836.606-71, Application of 6 percent architect-engineer fee limitation. 4. DESIGN INDEPENDENCE, FURNITURE, AND EQUIPMENT: Designs for construction must produce a complete and usable facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A-E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A-E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design includes those items to meet code requirements for building occupancy; items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26, or 28 through 48; non-IT equipment items covered by Division 27; and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00, and 12 36 00. The A-E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design s independence. 5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction & Facilities Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning, and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs References: PG-18-1 Master Construction Specifications SOW Attachment 01 VHA Required Division 01 Specification Sections List PG-18-3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders] PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Requirements PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis] PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier-Free Design Standard PG-18-14 Room Finishes, Door, and Hardware Schedule PG-18-15 A-E Submission Requirements, Volume C PG-18-17 NEPA Interim Guidance for Projects H-7545 VA Cultural Resource Management Procedures See SOW Section 17 OIT Infrastructure Standard for Telecommunications Spaces v3.1 (1 July 2021) The following references should also be used to complete the design documents: § VA Standards Alert 017 Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf) § 00 VA OEHRM Site Infrastructure Requirements v1.8 § SOCAMES 6 Design Alert 1 § American National Standards Institute (ANSI) § American Society for Testing Materials (ASTM) § Building Industry Consulting Service International (BICSI) § Federal Communications Commission (FCC), all Regulations, Procedures and Standards for Two-Way Radio Equipment, Systems and Operation § Illuminating Engineering Society of North America (IESNA) § Institute of Electrical and Electronic Engineers (IEEE) § International Organization for Standardization (ISO), Standards for Protocols and Interfaces that include Open System Interconnections (OSI) § Joint Commission on Accreditation of Healthcare Organizations (JACHO), Environment of Care Guidelines and Standards § Facilities Guidelines Institute (FGI): 2010 , or most current issue, Guidelines for the Design and Construction of Health Care Facilities § U.S. Green Building Council (USGBC) LEED Program & Sustainable Building Design Council § The Green Building Initiative (GBI), Green Globes Environmental Assessment and rating System § The American Institute of Architects (AIA) and National Society of Professional Engineers(NSPE) recent additions to their professional codes of ethics encouraging environmentally responsible design § National Fire Protection Association (NFPA): A/E shall pay particular attention to the following publications: § NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection § NFPA 70 National Electrical Code § NFPA 70 E Standard for Electrical Safety Requirements for Employee Workplaces § NFPA 72 National Fire Alarm Code § NFPA 75 Standard for the Protection of Electronic Computer/Data Processing Equipment § NFPA 77 Recommended Practice on Static Electricity § NFPA 80 Standard for Fire Doors and Fire Windows § NFPA92A Recommended Practice for Smoke-Control Systems Page 2 -11 Architectural Design Manual August 1, 2014 CHAPTER 2: GENERAL REQUIREMENTS § NFPA92B Guide for Smoke Management Systems in Malls, Atria, and Large Areas § NFPA 99 Standard for Healthcare Facilities § NFPA 101 Life Safety Code § NFPA 110 Standard for Emergency and Standby Power Systems o NFPA 780 Standard for the Installation of Lightning Protection Systems § National Electrical Manufacturers Association (NEMA) § Underwriters' Laboratories, Inc. (UL) Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A-E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department-wide. 6. DESIGN COLLABORATION: The A-E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review. 7. LIFE SAFETY REVIEW: The A-E shall incorporate any comments from the VA life safety review into specifications and drawings where applicable. 8. ENVIRONMENTAL PROTECTION: The A-E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the VAMC. If the NEPA assessment results in potential environmental impacts, the A-E shall be responsible for completing any auxiliary documentation required per PG-18-17, NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal. 9. PHYSICAL SECURITY: The A-E must include a certified physical security specialist. The specialists must be involved with the design, beginning with the concept phase, and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the VA Physical Security and Resiliency Design Manual (PSRDM) revised April 1, 2021, located on the TIL (https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf). The A-E shall ensure that all applicable aspects of the VA PSRDM are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A-E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase and assist the VA with waiver requests as necessary. 10. Building Automated System (BAS) DESIGN: Design to cover control system to monitor and trend data for emergency power. Control points to be accessed at locations: AOD building 2, Electrical shop in building 4, Building 21B, Police Building. 11. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C, A-E Submission Instructions for Minor and NRM Construction Program dated November 2008. Submittal documents shall be prominently marked For Official Use Only (FOUO) if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification - For Official Use Only (FOUO). The A-E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15. It is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A-E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Statement of Work. Each new submittal will incorporate all VA comments from the previous submittal. The Asbestos Abatement requirements in PG-18-15 are applicable at Salisbury VAMC due to the age of the campus (construction began in the 1950s). The following submittals will be required for this project: § Quality Assurance/Quality Control (QA/QC) Plan § Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required. Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included. § Schematic Design (SD)- 35% § Design Development One (DD) 65% § Construction Documents (CD)- 95% § Final Bid Documents (Bid) 100% 12. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for [Building Information Modeling (BIM) OR Computer Aided Design (CAD)] available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit/CAD 2019 or the latest version available to W.G. (Bill) Hefner VAMC, Salisbury. The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination. The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the W.G. (Bill) Hefner VAMC, Salisbury Master Record Drawing pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase. § Architectural/Interior Design § Square Footage/Volume § Building Names and Numbers § Architectural Schedules § Architectural Specialties and Woodwork § Doors § Windows § Louvers § Roof § Floors § Ceilings § Vertical Circulation § Walls/Curtain Wall Sizes, Shapes, & Material Data § General Signage § Schedules § Equipment § Structural § Foundations § Shafts and Pits § Mechanical § HVAC § Plumbing § Electrical/Telecommunications § Power and Lighting § Steam Distribution § Other Engineering Data as Required § Exterior Building Information § Asbestos/Hazardous Material Info § Security System Information (Access Control, Security Cameras, Panic Alarms, Overhead Paging) § Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms) § Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition) 13. SUBMITTAL FORMATS: Submittals shall be provided in electronic and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp), and Autodesk Revit Project (.rvt) files are acceptable. The A-E must establish a submittal exchange service or SharePoint site to provide all electronic copies of required submittals. The A-E must ensure the submittal exchange service is accessible by VA personnel and provide station personnel and contracting office with the information necessary to access the service. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at https://section508.gov/. The A-E shall be responsible for providing: Meeting/Conference Agendas and Minutes Agendas and other required documents for all status update meetings will be provided to the Post-Award CO/CS and COR a minimum of 24 hours in advance of the meeting. At the initial status update meeting, the frequency of subsequent status update meetings will be established and mutually agreed to by the contractor, VA station personnel, and the Post-Award CO/CS. Meeting minutes for all formal meetings and conferences held with the VA, including weekly construction meetings, shall be submitted within seven calendar days of the meeting or conference. All documents in any of the electronic formats listed above. Minimum meeting minutes requirements § Project name, project number, meeting host, meeting name § Date, time, meeting ID, call-in number, duration, and consecutive number of total related meetings § Participant list (name, title, phone number (office and mobile), email, attended meeting (yes/no)) § Meeting purpose, roll call, and additional items § Agenda items (decisions, action items, and fixes or next steps) § Next meeting date and time § Detailed attachment list Construction Cost Estimates Construction cost estimates shall comply with the VA Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated February 1, 2019, located on the TIL (http://www.cfm.va.gov/cost/index.asp). All estimates in any of the electronic formats listed above. Quality Assurance/Quality Control (QA/QC) Plan § All documents in any of the electronic formats listed above. Basis of Design (BD) § All documents in any of the electronic formats listed above. § Two half-size paper bond sets of drawings to VA Schematic Design (SD) § All documents in any of the electronic formats listed above. § Two paper bond sets of specifications to VA § Two paper bond sets of investigation reports, design calculations, space planning data, and cost estimate to VA Design Development (DD), and Construction Documents (CD) § All documents in any of the electronic formats listed above. § Memo annotating what was not upgraded and corresponding justifications. § One full-size paper bond set of drawings to VA § Two half-size paper bond sets of drawings to VA § Two paper bond sets of specifications to VA § Two paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW), and cost estimate to VA Final Bid Documents (Bid) § PDF files of drawings, specifications, and any miscellaneous design analysis documents, such as submittal log and physical security compliance report § Certified memo annotating what areas/times were not upgraded and the corresponding justifications § Certified memo that the A-E design is independent of future projects and includes all equipment required for the project to be activated/fully functional § Word files of specifications § Revit and AutoCAD files of drawings § One full-size paper bond set of drawings to VA § Two half-size paper bond sets of drawings to VA § Two paper bond sets of specifications to VA § One paper bond set of investigation reports, design calculations, space planning data, construction schedule, construction SOW, and cost estimate to VA 14. OPTION ITEM REQUIREMENTS: Solicitation Support Services Pre-bid site visit to include meeting and project walk around. This is the meeting where contractors are invited to the job site to visually inspect the construction site to accurately develop a construction bid package. Answer any technical questions/requests for information (RFIs) received from contractors over the duration of the solicitation, including questions asked during the site visit. Questions from contractors may come at multiple times and cover several questions over the course of the solicitation period. Technical question responses will be provided to the Contracting Officer who will distribute the information via amendment to the solicitation. Answers to RFIs will be required from the A-E within five calendar days of the date the questions are sent to the A-E from either the project COR or CO. An alternate response period may be submitted for review, however, unless approved by the CO and COR, the A-E is required to comply with the five-calendar-day requirement. Throughout the solicitation period, the A-E shall provide addenda as necessary if required to revise specs and drawings. In response to any technical questions and/or addenda issued during the solicitation period, the A-E shall provide any final revisions to the 100% FC CD as part of the construction contract. These documents shall be labeled Final Construction. Construction Period Services (CPS) Requests for Information (RFI) Requests for Information shall be submitted within three calendar days of submittal to the A-E. Submittal Reviews Submittal reviews shall be submitted within seven calendar days of submittal to the A-E. Site Visit Reports Site visit reports shall be submitted within seven calendar days of the visit. All documents in any of the electronic formats listed above. Modification/Change Order Requests Modification requests shall be submitted within seven calendar days (check all against Dale s email) of submittal to the A-E. This includes the review of the contractor s change order/modification proposal for construction change orders, as well as the formulation of an IGCE for the modification, as requested. The A-E's reply regarding their review of cost proposals and their recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A-E shall also supply cost estimates as requested by the COR for Requests for Proposals for anticipated changes. All documents in any of the electronic formats listed above. Note: If major modification, VA will provide additional time and document format guidance. Punch List Punch list shall be submitted within seven calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above. Record Drawings Record drawings shall be delivered to the VA within 30 calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format. 15. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A-E shall perform Part One Services/Design Phase work according to the schedule shown below. The A-E is also responsible for following Specification Section 01 32 16.01, Architectural and Engineering CPM Schedules, located in SOW Attachment 02. If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day. The remaining timeline will not be shifted to accommodate Holidays or Weekends. Administrative Time 14 calendar days after receipt of Issuance of Award Initial Project Design Meeting (PDT) [Kickoff 01 calendar days after receipt of Issuance of Award QA/QC Submittal & Basis of Design (BD) 10% Submittal 30 calendar days after end of Administrative Time QA/QC and BD 10% Submittal Review Meeting 25 calendar days after VA receipt of QA/QC & BD 10% Submittals 35% SD Submittal (include specifications in word and pdf format & Drawings in pdf and CAD format) 45 calendar days after acceptance of QA/QC & BD 10% Submittals 35% SD Review Meeting 20 calendar days after VA receipt of 35% SD Submittal 65% DD Submittal (include specifications in word and pdf format & Drawings in pdf and CAD format) 60 calendar days after VA acceptance of 35% SD Submittal 65% DD Review Meeting 20 calendar days after VA receipt of 65% DD Submittal 95% CD Submittal (include specifications in word and pdf format & Drawings in pdf and CAD format) 60 calendar days after VA acceptance of 65% DD Submittal 95% CD Review Meeting 20 calendar days after VA receipt of 95% CD Submittal Final Bid Documents Submittal (include specifications in word and pdf format & Drawings in pdf and CAD format) 50 calendar days after VA acceptance of 95% CD Submittal Final Bid Documents Acceptance Meeting 20 calendar days after VA receipt of Final Bid Documents Submittal Total Part One Services/Design Phase Schedule 365 calendar days *Note: This needs to meet timeline provided by HEFP SEP. Edit accordingly. The 365 days listed in part one project schedule may fluctuate based on when 95% CD submittal meets all VA guidelines and acceptance is issued. If 95% CD submittal is not accepted due to insufficient design Solicitation Support Services (Optional Line Item) shall be performed for the length of time between the time the option is exercised and award of the construction project. Construction Period Services (Option Line Items) and Third-Party Commissioning (Option Line Item) shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Solicitation Support Services, Construction Period Services, and Third-Party Commissioning. 16. CONTRACT OVERSIGHT: All contracts for this project shall be awarded by the VISN 6 Contracting Office; only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders, and changes to the statement of work. VISN 6 Contracting Officer shall designate a Contracting Officer s Representative (COR) to monitor and manage the A-E s performance under the design project contract. The COR shall be a representative of the VAMC Engineering team and have the technical knowledge required to monitor and oversee the project. A COR from the VAMC Engineering team shall also be designated for the construction project contract to monitor and manage the construction contractor s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of Owner s Representative and does not supersede or eliminate the A-E s responsibility for Part Two Services/Construction Period Services. The A-E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase. 17. OI&T INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES: The current version for this standard is located on the TIL (https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf). The design for this project at the Salisbury VAMC in Salisbury, NC must meet the Campus Support Center (CSC) requirements of the Infrastructure Standard for Telecommunications Spaces (The Standard). The Standard serves as the master reference document of criteria for Department of Veterans Affairs (VA) facility Information Technology (IT) support infrastructure. It defines the technical requirements necessary to maintain optimum reliability and efficiency within VA facilities and computing centers. IT Support Infrastructure is defined as all passive telecommunications and information technology equipment and supporting physical space and equipment. This Standard is maintained by the Enterprise Data Center Infrastructure Collaboration Team (EDICT). Questions or concerns should be directed to Enterprise Data Center and Infrastructure Engineering (DCIE) at contact@example.gov. Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with t...

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle's Finance and Administrative Services (FAS) Capital Development division is seeking to establish on-call contracts with two qualified professional firms to provide structural and seismic/disaster engineering services. These consultants will provide technical expertise on an as-needed basis for small to medium projects across planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes performing structural engineering studies, seismic evaluations, confidence testing, and fall protection design, as well as preparing stamped construction documents, managing permitting, and providing construction administration and inspection for new and existing City facilities. The contract features an initial one-year term with options for four annual renewals, not to exceed a total duration of five years. To be eligible, firms must be licensed to practice in Washington State and the City of Seattle and demonstrate a track record of at least three relevant projects within the last seven years. Selection is based on a weighted evaluation of relevant technical experience (40%), approach and methodology (30%), an inclusion plan for women and minority firms (15%), and past performance (15%). All deliverables must adhere to specific FAS CAD standards and CSI MasterFormat specifications. Payment is processed within 30 calendar days of invoice receipt, with costs based on personnel salary rates and reimbursed direct non-salary expenses.
Finance and Administrative Services

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS