Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C4. Efficiency and Safety Improvements with Fendering and Wharf Repairs on Wharf 1 (South Terminal Dredging Preparation)

Closed
C4. Efficiency and Safety Improvements with Fendering and Wharf Repairs on Wharf 1 (South Terminal Dredging Preparation)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 8 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract pertains to construction management services for the implementation of efficiency and safety enhancements, including fendering and wharf repairs, at Wharf 1 (South Terminal) at the Port of Hueneme. The project aims to prepare the wharf for Phase 2 dredging, which involves extending the channel depth by an additional five feet, from -35 feet to -40 feet MLLW, to accommodate heavier container vessels carrying more cargo. While the main shipping channel was deepened to -40 feet in 2020, a section of Wharf 1, specifically Berth 3 (now called Berth 2), remains at only 35 feet deep, limiting its cargo capacity. The scope includes not only dredging preparation but also upgrading safety features and infrastructure to support larger vessels and increased cargo loads. The solicitation was issued on March 12, 2025, with a response deadline of April 12, 2025. The project is valued between 5 million and 15 million dollars and is managed under the NAICS code 237990, which covers other heavy and civil engineering construction. The Port of Hueneme, operated by the Oxnard Harbor District in California, is overseeing the project, with Rodrigo Zaragoza serving as the primary contact. The project emphasizes improving port infrastructure to enhance operational efficiency and safety, facilitating the loading of heavier vessels and increasing cargo throughput at the port. Interested vendors can find additional details and submit proposals through the provided online portal.

General Info

Agency

California → Oxnard Harbor District - Port of Hueneme

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Oxnard Harbor District - Port of Hueneme
Contacts1 person available
OfficeN/A
Organization / Agency
California → Oxnard Harbor District - Port of Hueneme
Office AddressN/A
Contacts

Full Description

Show more
This request for proposal is specific to construction management for proposed Efficiency and Safety Improvements with Fendering and Wharf Repairs on Wharf 1 (South Terminal Dredging Preparation) at the Port of Hueneme. Phase 2 will dredge an additional five feet (from -35 feet to -40 feet, mean low lower water (MLLW)) to enable fresh produce container vessels to load heavier with additional cargo each visit. The Port of Hueneme’s main shipping channel, which was deepened to -40 feet MLLW in 2020, already allows heavier vessels to enter the harbor. However, a portion of Wharf 1, Berth 3 (now called Berth 2) is still only 35 feet deep.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS