Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CABLE ASSEMBLY, SPEC

Awarded
SPE4A6-26-T-09GHFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the procurement of a cable assembly, specifically identified as a special cable assembly with NSN 6150016917914 and part number A-57480-56-2, under solicitation SPE4A6-26-T-09GH. The requirement is for a single unit to be delivered within 20 days after order, with a required delivery date of July 16, 2026, to the USS MICHAEL MONSOOR DDG 1001 at APO AP 96694, with FOB destination terms placing full responsibility for transportation and risk on the contractor until receipt at the final destination. The item is non-hazardous per HMIC review, eliminating the need for Safety Data Sheets, and all packaging must adhere to MIL-STD-2073-1E with clean/dry preservation methods, unit pack code U, and E5 containers. Marking must comply with MIL-STD-129, including NSN, contract number, and mandatory GS1-128 barcodes, with no special marking required. The contract explicitly prohibits parcel post shipping and mandates the use of the fastest traceable means. Sampling inspections are governed by MIL-STD-1916 or an equivalent zero-based plan, with non-conformances not permitted in the sample lot unless specified otherwise; attributes are assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 for critical, major, and minor defects respectively. Technical and quality requirements are defined by the DLA Master List of Technical and Quality Requirements, referenced by R and I numbers. All items must be accepted at the destination by the government after inspection. Pricing is specified for multiple line items totaling approximately $8,524.45, with the unit of issue being each. The contract incorporates a full suite of FAR and DFARS clauses including 52.246-2 for inspection, 52.249-8 for fixed-price default, 52.227-1 for authorization and consent, and multiple cybersecurity and information safeguarding clauses including 252.204-7012 and 252.240-7997 requiring NIST SP 800-171 compliance for covered defense information. Subcontract

General Info

One cable assembly NSN 6150016917914 delivered FOB destination to USS MICHAEL MONSOOR within 20 days under strict MILSTD compliance.

Contract Value

$2,353.12

NAICS

334417 - Electronic Connector Manufacturing

Place of Performance

AP, USA

Set-Aside

NONE

Award Issued Date

Documents

2

Contract SPE4A626V288K for Cable Assembly

PDF, High priority: read this firstcontract-document
High

RFQ SPE4A6-26-T-09GH DLA Aviation Jul 2026

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
DLA award SPE4A626V288K posted on DIBBS. Awardee: BOGUE SYSTEMS INC (CAGE 0BXF1) Total Contract Price: $2,353.12 Award Date: 08-03-2026 Solicitation: SPE4A6-26-T-09GH Line items: - CABLE ASSEMBLY, SPEC (NSN/Part 6150016917914, PR 7017554701)

Similar Contracts

Same NAICS industry code

NAICS: 334417
New
DIBBS
CONNECTOR, PLUG, ELECTRI
Solicitation # SPE7M2-27-T-0439
Solicitation SPE7M2-27-T-0439 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 52 electrical plug connectors, identified by NSN 5935010966194. This is a qualified item requiring adherence to the Qualified Products List (QPL) for Federal Stock Class 5935 and must comply with technical specifications MIL-DTL-55302/63H(2) and MIL-DTL-55302G(4). The contract mandates strict adherence to preservation and packaging standards per MIL-DTL-55330 and MIL-STD-2073-1E, with marking requirements following MIL-STD-129. Additionally, the contractor must ensure that mercury is not intentionally added to the hardware, except where functionally required and permitted by NAVSEA. Delivery is required within 167 days after order, with a need ship date of April 26, 2027, and a final required delivery date of June 25, 2027. The items are to be delivered to DLA Distribution Warner Robins in Georgia, with inspection and acceptance occurring at the destination. Payment and invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. The procurement is subject to various federal regulations, including the Buy American Act, Berry Amendment, and NIST SP 800-171 cybersecurity assessment requirements, as well as specific prohibitions on covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 334417
New
DIBBS
MOLD, POTTING, ELECTRICA
Solicitation # SPE7M5-27-Q-0120
Solicitation SPE7M5-27-Q-0120 is a small business set-aside request for quotations issued by the DLA Weapons Support Active Devices Division for the procurement of 29 electrical connector potting molds (NSN 5935-01-488-7418). The items must be manufactured in accordance with basic specification MIL-DTL-24231/29A, reference specification MIL-DTL-24231E, and quality assurance provision QAP 16236 SQAP014887418. The contract is a firm fixed price award based on best value, evaluating past performance, offered delivery, and price. A critical requirement is the prohibition of Class I ozone-depleting substances in the manufacturing and testing processes unless written approval is granted by the contracting officer. The delivery process involves a mandatory First Article Testing (FAT) phase, requiring the contractor to test one unit and submit a report to DLA Maritime FMSE within 120 calendar days of the contract date. Final production delivery is required 438 days after the approval of the FAT report, resulting in a total delivery timeline of 678 days. Inspection for FAT is conducted at the source, while final acceptance and FOB point are at the destination, specifically DLA Distribution San Joaquin in Tracy, California. Quality control must adhere to MIL-STD-1916 or ASQ H1331 zero-based sampling plans, and all packaging and marking must comply with MIL-STD-129 and RP001 requirements. Invoicing and payment are to be processed electronically through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS