The Cadiz Valley Water Conservation, Recovery, and Storage Project is a long-term groundwater management initiative focused on extracting and conveying water from a closed basin beneath Cadiz Real Estate LLC’s property in San Bernardino County, California. Originally approved in 2012 through a Final Environmental Impact Report certified by the Santa Margarita Water District, the project includes Phase 1 operations to pump up to 50,000 acre-feet of groundwater annually via a 43-mile pipeline along the Southern Pipeline route to the Colorado River Aqueduct, and Phase 2 provisions for storing imported surface water in the basin. In 2019, Addendum No. 1 to the Final EIR was adopted to accommodate minor realignments of the Southern Pipeline and the addition of water treatment facilities on Cadiz property. Addendum No. 2, approved by the Fenner Valley Water Authority on September 25, 2025, evaluates the conversion of an existing natural gas pipeline—the Northern Pipeline—between Cadiz and Mojave into a water conveyance facility, requiring the construction of seven new pump stations, air release and vacuum valves, blow-off facilities, and access manholes, alongside pipeline rehabilitation. This modification provides an alternative conveyance route to enhance regional water flexibility, separate from the Southern Pipeline. The Fenner Valley Water Authority, a joint powers authority comprising San Bernardino County, Fenner Gap Mutual Water Company, and Santa Margarita Water District, prepared the addendum under the California Environmental Quality Act and determined that no supplemental or subsequent EIR is required, as the proposed changes do not introduce new significant environmental impacts or substantially increase the severity of previously identified impacts. A Memorandum of Understanding between FVWA, Fenner Gap Mutual Water Company, and Cadiz, Inc. outlines roles in development, financing, construction, and operation of the Northern Pipeline facilities, with FVWA leasing the infrastructure to ensure compliance with environmental and regulatory obligations. The project spans multiple counties in California and operates under a 50-year framework for pumping, with environmental documentation filed and publicly accessible through the State Clearinghouse Number SCH No. 2011031002. No federal procurement clauses, contract values, or payment terms are included, as the documents are strictly environmental review records under CEQA, with no federal acquisition or contracting mechanisms applicable.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code