Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cadiz Valley Water Conservation, Recovery, and Storage Project is a long-term groundwater management program centered on the closed groundwater basin of Cadiz Real Estate LLC property. The project is divided into two primary phases: Phase 1 involves pumping an average of 50,000 acre-feet per year of water over a 50-year period via a wellfield of up to 34 wells and a 43-mile Southern Pipeline to the Colorado River Aqueduct for delivery to various water providers. Phase 2 focuses on the construction of spreading basins to recharge surface water into the groundwater basin. The project is managed by the Fenner Valley Water Authority (FVWA), a joint powers authority comprising San Bernardino County, the Fenner Gap Mutual Water Company, and the Santa Margarita Water District. Recent developments include the approval of Addendum No. 2 to the Final Environmental Impact Report on September 25, 2025. This addendum authorizes the Northern Pipeline Project Modification, which involves converting an existing underground natural gas pipeline between Cadiz and Mojave, California, into a water conveyance facility. This modification requires the construction of seven new pump stations and various appurtenant facilities, such as air release/vacuum valves and blow-off facilities. The project spans 155 miles across San Bernardino, Riverside, Orange, Los Angeles, Kern, and Ventura counties. To ensure regulatory oversight, FVWA will lease the project facilities to monitor compliance with all environmental and permitting requirements.

General Info

Cadiz project pumps groundwater, uses Southern and Northern pipelines for conveyance, approved under CEQA with no new significant impacts.

Agency

California → Fenner Valley Water Authority

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fenner Valley Water Authority
Contacts2 people available
OfficeN/A

Full Description

Show more
This Notice of Determination relates to the approval of Addendum No. 2 to the Final Environmental Impact Report (Final EIR) for the Cadiz Valley Water Conservation, Recovery and Storage Project (Cadiz Project) as certified on July 31, 2012 (SCH No. 2011031002) pursuant to the California Environmental Quality Act (CEQA). The Cadiz Project, as described in the Final EIR, involves a long-term groundwater management program for the closed groundwater basin underlying Cadiz Real Estate LLC (Cadiz Real Estate) property that would allow for both the beneficial use of some of the groundwater (Phase 1) and storage of imported surface water in the groundwater basin (Phase 2). The Cadiz Project, including Phase 1 and a programmatic overview of Phase 2, was approved by the Santa Margarita Water District (SMWD) acting as lead agency on July 31, 2012. The first Addendum to the Final EIR (Addendum No. 1), adopted by Fenner Valley Water Authority (FVWA) acting as lead agency in 2019, assessed the construction of a water treatment system on Cadiz property and minor modifications to the Southern Pipeline route. FVWA—a joint powers authority (JPA) comprised of San Bernardino County, the Fenner Gap Mutual Water Company (FGMWC), and SMWD (managing member of FVWA)—prepared Addendum No. 2. Since the certification of the Final EIR in 2012 and the adoption of Addendum No. 1 in 2019, FVWA has proposed to convert a portion of an existing natural gas pipeline referred to as the “Northern Pipeline”, between Cadiz, California and Mojave, California, for use as a water conveyance facility that would require construction of seven new pump stations, appurtenant facilities, and rehabilitation and possible replacement of certain portions of the Northern Pipeline (collectively, the Northern Pipeline Project Modification). FVWA has prepared this Addendum No. 2 to evaluate the construction of facilities necessary to convert the Northern Pipeline, an existing underground natural gas pipeline, into a water conveyance pipeline and whether the Project Modification would result in any new significant impacts or substantial increases in the severity of previously identified significant impacts. As described in the Final EIR, the Project approved in 2012 includes construction of a wellfield and manifold system and a 43-mile water conveyance pipeline along the “Southern Pipeline” route between private property in Cadiz, California and the Colorado River Aqueduct, within an existing railroad right-of-way. In 2019, FVWA adopted Addendum No. 1 that slightly modified the Southern Pipeline water conveyance alignment by adding approximately 2 miles of pipeline in Cadiz to the 43-mile original alignment evaluated in the Final EIR. Additional water treatment facilities were also evaluated and approved. Addendum No. 2 evaluates the conversion of an existing buried steel pipeline (the Northern Pipeline) from oil/natural gas use to use as a water conveyance facility to convey and store water more flexibly throughout the region. The Northern Pipeline would provide an additional route for water conveyance between the Cadiz Valley and the Antelope Valley, separate and apart from the approved Southern Pipeline which will convey water from Cadiz to the Colorado River Aqueduct. Addendum No. 2 analyzes the environmental impacts associated with construction of facilities needed to convey water through the Northern Pipeline in combination with the Project components evaluated in the Final EIR and Addendum No. 1. The pipeline appurtenance facilities that would be constructed and visible on the surface include air release and air vacuum valves (AR/AV), blow-off (BO) facilities, and access man-holes. The AR/AVs would be installed to allow for air release and to manage vacuum conditions in the pipeline and the BOs would allow for filling and draining the pipeline as needed for maintenance. FVWA, the Fenner Gap Mutual Water Company, and Cadiz, Inc. entered into a Memorandum of Understanding (MOU) to document how the Northern Pipeline fits into the scope of the Project and the respective obligations of the Fenner Gap Mutual Water Company, Cadiz, Inc., and FVWA with respect to the development, financing, construction and operation of the facilities and associated appurtenances necessary for the conveyance and delivery of Project water through the Northern Pipeline. FVWA will lease the Project Facilities to enable it to monitor compliance of the Project with all environmental, regulatory and permitting requirements. On September 25th, the Board of Directors of FVWA approved the Cadiz Valley Water Conservation, Recovery, and Storage Project EIR Addendum No. 2. This is to advise that FVWA as Lead Agency approved Addendum No. 2 based on the substantial evidence in the Final EIR, Addendum No. 1 and Addendum No. 2. FVWA found that an addendum is the appropriate document under CEQA for assessing the Project Modification within the context of these earlier approved CEQA documents, and that the Project Modification does not require preparation of a supplemental or subsequent EIR or negative declaration under Public Resources Code section 21166 and State CEQA Guidelines section 15162.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS