Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Cadiz Valley Water Conservation, Recovery, and Storage Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cadiz Valley Water Conservation, Recovery, and Storage Project is a long-term groundwater management program centered on the closed groundwater basin of Cadiz Real Estate LLC property. The project is divided into two primary phases: Phase 1 involves pumping an average of 50,000 acre-feet per year of water over a 50-year period via a wellfield of up to 34 wells and a 43-mile Southern Pipeline to the Colorado River Aqueduct for delivery to various water providers. Phase 2 focuses on the construction of spreading basins to recharge surface water into the groundwater basin. The project is managed by the Fenner Valley Water Authority (FVWA), a joint powers authority comprising San Bernardino County, the Fenner Gap Mutual Water Company, and the Santa Margarita Water District. Recent developments include the approval of Addendum No. 2 to the Final Environmental Impact Report on September 25, 2025. This addendum authorizes the Northern Pipeline Project Modification, which involves converting an existing underground natural gas pipeline between Cadiz and Mojave, California, into a water conveyance facility. This modification requires the construction of seven new pump stations and various appurtenant facilities, such as air release/vacuum valves and blow-off facilities. The project spans 155 miles across San Bernardino, Riverside, Orange, Los Angeles, Kern, and Ventura counties. To ensure regulatory oversight, FVWA will lease the project facilities to monitor compliance with all environmental and permitting requirements.

General Info

Cadiz project pumps groundwater, uses Southern and Northern pipelines for conveyance, approved under CEQA with no new significant impacts.

Agency

California → Fenner Valley Water Authority

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

Cadiz Valley Water Conservation Project EIR Addendum No. 2 Notice of Determination

PDFnotice-of-determination

Cadiz Valley Water Conservation Project Notice of Determination 2012

PDFnotice-of-determination

Fenner Gap Mutual Water Company Northern Pipeline Conversion

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fenner Valley Water Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fenner Valley Water Authority
Office AddressN/A
Contacts
Robert GranthamExecutive Director
Stan SpeerChief Financial Officer

Full Description

Show more
This Notice of Determination relates to the approval of Addendum No. 2 to the Final Environmental Impact Report (Final EIR) for the Cadiz Valley Water Conservation, Recovery and Storage Project (Cadiz Project) as certified on July 31, 2012 (SCH No. 2011031002) pursuant to the California Environmental Quality Act (CEQA). The Cadiz Project, as described in the Final EIR, involves a long-term groundwater management program for the closed groundwater basin underlying Cadiz Real Estate LLC (Cadiz Real Estate) property that would allow for both the beneficial use of some of the groundwater (Phase 1) and storage of imported surface water in the groundwater basin (Phase 2). The Cadiz Project, including Phase 1 and a programmatic overview of Phase 2, was approved by the Santa Margarita Water District (SMWD) acting as lead agency on July 31, 2012. The first Addendum to the Final EIR (Addendum No. 1), adopted by Fenner Valley Water Authority (FVWA) acting as lead agency in 2019, assessed the construction of a water treatment system on Cadiz property and minor modifications to the Southern Pipeline route. FVWA—a joint powers authority (JPA) comprised of San Bernardino County, the Fenner Gap Mutual Water Company (FGMWC), and SMWD (managing member of FVWA)—prepared Addendum No. 2. Since the certification of the Final EIR in 2012 and the adoption of Addendum No. 1 in 2019, FVWA has proposed to convert a portion of an existing natural gas pipeline referred to as the “Northern Pipeline”, between Cadiz, California and Mojave, California, for use as a water conveyance facility that would require construction of seven new pump stations, appurtenant facilities, and rehabilitation and possible replacement of certain portions of the Northern Pipeline (collectively, the Northern Pipeline Project Modification). FVWA has prepared this Addendum No. 2 to evaluate the construction of facilities necessary to convert the Northern Pipeline, an existing underground natural gas pipeline, into a water conveyance pipeline and whether the Project Modification would result in any new significant impacts or substantial increases in the severity of previously identified significant impacts. As described in the Final EIR, the Project approved in 2012 includes construction of a wellfield and manifold system and a 43-mile water conveyance pipeline along the “Southern Pipeline” route between private property in Cadiz, California and the Colorado River Aqueduct, within an existing railroad right-of-way. In 2019, FVWA adopted Addendum No. 1 that slightly modified the Southern Pipeline water conveyance alignment by adding approximately 2 miles of pipeline in Cadiz to the 43-mile original alignment evaluated in the Final EIR. Additional water treatment facilities were also evaluated and approved. Addendum No. 2 evaluates the conversion of an existing buried steel pipeline (the Northern Pipeline) from oil/natural gas use to use as a water conveyance facility to convey and store water more flexibly throughout the region. The Northern Pipeline would provide an additional route for water conveyance between the Cadiz Valley and the Antelope Valley, separate and apart from the approved Southern Pipeline which will convey water from Cadiz to the Colorado River Aqueduct. Addendum No. 2 analyzes the environmental impacts associated with construction of facilities needed to convey water through the Northern Pipeline in combination with the Project components evaluated in the Final EIR and Addendum No. 1. The pipeline appurtenance facilities that would be constructed and visible on the surface include air release and air vacuum valves (AR/AV), blow-off (BO) facilities, and access man-holes. The AR/AVs would be installed to allow for air release and to manage vacuum conditions in the pipeline and the BOs would allow for filling and draining the pipeline as needed for maintenance. FVWA, the Fenner Gap Mutual Water Company, and Cadiz, Inc. entered into a Memorandum of Understanding (MOU) to document how the Northern Pipeline fits into the scope of the Project and the respective obligations of the Fenner Gap Mutual Water Company, Cadiz, Inc., and FVWA with respect to the development, financing, construction and operation of the facilities and associated appurtenances necessary for the conveyance and delivery of Project water through the Northern Pipeline. FVWA will lease the Project Facilities to enable it to monitor compliance of the Project with all environmental, regulatory and permitting requirements. On September 25th, the Board of Directors of FVWA approved the Cadiz Valley Water Conservation, Recovery, and Storage Project EIR Addendum No. 2. This is to advise that FVWA as Lead Agency approved Addendum No. 2 based on the substantial evidence in the Final EIR, Addendum No. 1 and Addendum No. 2. FVWA found that an addendum is the appropriate document under CEQA for assessing the Project Modification within the context of these earlier approved CEQA documents, and that the Project Modification does not require preparation of a supplemental or subsequent EIR or negative declaration under Public Resources Code section 21166 and State CEQA Guidelines section 15162.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS