Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on May 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cafeteria Expansion at Jamestown High School

Closed
20240714State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves constructing a approximately 6,500 square foot, one-story addition to the side of the existing Jamestown High School Cafeteria, situated within an outdoor courtyard. The scope includes site preparation activities such as clearing, demolition, grading, drainage, utility installation, and site restoration. The new structure will feature a steel frame with brick and EIFS exterior finishes, along with windows, doors, HVAC, and electrical systems. Additionally, the project encompasses limited interior and exterior modifications to the existing building. Two additive options are included: the first involves constructing two new bathrooms within the existing building, incorporating plumbing, fixtures, partitions, finishes, and mechanical systems; the second provides an operable partition system to divide the new addition internally, including structural supports and enclosure walls. The contractor is responsible for providing all labor, materials, equipment, supervision, and miscellaneous work necessary to complete the project according to the detailed drawings and specifications prepared by Hudson + Associates Architects and civil drawings by Timmons Group. The project is set within the jurisdiction of James City County, Virginia, with a contract value estimated between 1.5 million and 2.5 million dollars. The solicitation was posted on May 9, 2024, with a response deadline of June 6, 2024. The work aims to enhance the cafeteria facilities and accommodate future needs, ensuring compliance with all specified requirements and standards.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → James City County
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → James City County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Work under this Project consists of the following:This project consists of constructing a one-story building addition totaling approximately 6,500 S.F., at side of the existing Jamestown High School Cafeteria, within an existing outdoor courtyard.  Limited exterior and interior alterations of the existing building are also included.   Work includes clearing and demolition at the existing courtyard, preparation of building pad, grading and drainage, utility work, and restoration of the site.  New construction includes a steel-framed, brick and EIFS-clad structure with windows and doors, HVAC and electrical work.   The project includes two (2) additives, one for new bathrooms within the existing building, and a second option for an operable partition to subdivide the Addition internally.  The Specifications and Drawings prepared by Hudson + Associates Architects, PLLC are dated December 20, 2023. The civil drawings prepared by the Timmons Group are dated March 14, 2024.There are two additive items included in the scope of work: Additive Item #1 - New Bathrooms:Construct two (2) new bathrooms within the existing school.  It includes floor demolition, subgrade and above-grade plumbing, plumbing fixtures and piping, interior masonry partitions, floor patching, floor and wall finishes, toilet partitions and specialties, suspended ceiling, electrical power and lighting, and new mechanical exhaust.Additive Item #2 – Operable PartitionIncludes provision of an interior, manually operable partition that divides the new Addition into two spaces, including structural supports, upper wall and soffit construction, and enclosure walls where the partition system stacks. Services provided by the contractor shall include, but not be limited to the furnishing of all labor, materials, equipment, supervision, tools, traffic control, testing, transportation, and all other miscellaneous appurtenances and work necessary to complete the project in accordance with the Contract Documents, Drawings and Specifications. (See also Section 6: Scope of Work/Statement of Needs)

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS