Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on March 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cafeteria HVAC System Replacement

Closed
PE-61700-NONST-2024-000000027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541611
New
Business Impact Analysis, Disaster Recovery, and Business Continuity Plan Services (RFP-VC-26-006), Inland Empire Utilities Agency (California)
Solicitation # RFP-VC-26-006
Hagerty Consulting, Inc. is seeking a Disadvantaged Business Enterprise (DBE) subcontractor to support an engagement with the Inland Empire Utilities Agency (IEUA) in California. The project focuses on enhancing the agency's operational resilience framework through the development and review of a Business Impact Analysis (BIA), Disaster Recovery Plan (DRP), and Business Continuity Plan (BCP), as well as the creation of recovery playbooks. The scope of work includes conducting assessments, participating in client workshops, and facilitating in-person tabletop exercises to identify response gaps. Preference is given to firms with expertise in IT/OT resilience and experience within the water, wastewater, or critical infrastructure sectors. The overall project is estimated at approximately 1 million dollars per year with an initial contract term of three years and options for extension. Award selection is based on a single-award basis, evaluating the offeror's past performance in the utility sector, personnel qualifications such as CBCP certifications, and the proposed staffing methodology. Compliance requirements are extensive, including adherence to California Labor Code prevailing wage laws, Department of Industrial Relations registration, and federal mandates such as Build America, Buy America (BABA) and EPA general terms and conditions. Proposals must be submitted electronically via PlanetBids by November 17, 2026.
Hagerty Consulting, Inc.

POSTED

about 5 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Burke County Board of Commissioners is seeking qualified vendors to replace and install a new HVAC system at the Burke County Detention Center Cafeteria, located at 225 GA HWY 24 S., Waynesboro, GA. The project involves removing the existing rooftop package unit, which is nearing the end of its service life, and replacing it with a more energy-efficient DX unit featuring variable speed capabilities, humidity control, and fan modulation to enhance occupant comfort and reduce energy consumption. Additionally, the project includes upgrading the existing Building Control Unit (BCU) to improve control system functionality, along with project management, control system design, installation, and programming services. Vendors are responsible for all costs associated with proposal preparation, and all submitted proposals will become property of the County. Proposals must be submitted by April 3rd, 2024, either via mail or hand delivery, and should include detailed specifications and plans based on the provided requirements. The project emphasizes environmentally conscious and energy-efficient HVAC solutions, with a focus on refrigerant recovery, proper removal of the old rooftop unit, and comprehensive control system upgrades. For questions or further information, vendors can contact Austin Miettunen at the provided phone number or email. The solicitation is part of the County’s efforts to modernize its facilities and improve operational efficiency at the detention center.

Documents

1
DOCX, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 61700 BURKE PE-61700-NONST-2024-000000027 to PE-61700-NONST-2024-000000027.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Jeff Davis County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Burke County Board of Commissioners is currently soliciting proposals from qualified Vendors who specialize in HVAC System Replacement and Installation, for the Burke County Detention Center Cafeteria Roof Unit. The facility is located at 225 GA HWY 24 S. Waynesboro, GA 30830. All proposals submitted become the property of the County and will not be returned. The County is not responsible for any costs incurred by the vendor in the preparation of proposals or presentations given. All expenses incurred by the vendor's pursuit of this award shall be borne by the vendor. All proposals should be based on but not limited to the following specifications for the Burke County Detention Center concerning HVAC System Replacement and Installation. See attached RFP.
Detention Center Cafeteria Roof Unit Replacement
1. There is 1 rooftop package unit that is MERV 13-rated serving the Detention Center Cafeteria that is approaching the end of its expected service life. 2. Replace the unit with a DX unit with variable speed units that provide humidity control, part load compressor, and fan modulation to use less energy and provide better occupant comfort. 3. Shut down the existing unit and recover the refrigerant. 4. Disconnect and remove the rooftop unit.
Control Systems and Equipment
Upgrade existing BCU Building Control Unit
Control systems services included Project Management Engineered Control Submittals and As-Built Drawings Control Panel(s) and Low Voltage Wiring Installation Control System Programming. Submission Deadline:
Please submit proposals via one of the following methods by Wednesday, April 3rd at 12:00PM EST:
Mail: The Burke County Board of Commissioners Attn. RFP Cafeteria HVAC System Replacement and Installation P.O. Box 89, Waynesboro, GA 30830 Hand Deliver: 602 N. Liberty Street, Waynesboro, GA 30830.
Any questions should be directed to Austin Miettunen at +1 (555) 000-0000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS