Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Cal Am Inactivation of North Loop Well and Chlorination Treatment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the complete disconnection and inactivation of the North Loop Well and its associated chlorination treatment system from the public water supply network operated by California American Water Company at 4001 N Loop Blvd, Antelope, CA 95843. This action is classified as a minor modification to an existing facility under CEQA Class 1 exemption, which exempts it from further environmental review as it entails no change in use or expansion of existing infrastructure. The State Water Resources Control Board is the approving regulatory authority, overseeing compliance with state water quality standards and permitting requirements, though no formal solicitation, contract number, or competitive procurement process is active. There is no specified contract value, delivery schedule, or funding data available, indicating this is a regulatory approval action rather than a traditional acquisition. Responsibility for implementation rests with California American Water Company, while oversight is conducted by the State Water Board’s Division of Drinking Water, with Austin Peterson identified as the primary point of contact for technical and administrative matters. No detailed performance metrics, inspection criteria, packaging requirements, payment terms, or contracting officer information are provided, reflecting the streamlined, non-competitive nature of the activity as an environmental compliance action under state law.

General Info

Disconnect and inactivate North Loop Well and chlorination system under CEQA Class 1 exemption, regulated by State Water Board.

Agency

California → State Water Resources Control Board

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

4001 N Loop Blvd., CA, 95843

Set-Aside

NONE

Documents

(1)

NOE North Loop Well Inactivation Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Austin PetersonDistrict Engineer
AUDIE FOSTERDIRECTOR OPERATIONS

Full Description

Show more
The Applicant proposes to disconnect and inactivate the North Loop Well and chlorination treatment system from the water system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins with diameters of 54 and 145.5 inches. Additional structural requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The technical execution of the project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 27 days
View Details