Cal Am Inactivation of Well 8 and Chlorination Treatment (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cal Am Inactivation of Well 8 and Chlorination Treatment project, managed by the State Water Resources Control Board Division of Drinking Water, involves the disconnection and inactivation of Well 8 and its associated chlorination treatment system. Located at 6831 Chevy Chase Way in Sacramento, California, the project is classified as a minor modification to an existing public water system. The project is designated as a Class 1 Categorical Exemption under California Code of Regulations section 15301, as it entails no change in use. A domestic water supply permit amendment for this work was issued on July 15, 2026. The effort is categorized under NAICS code 237110 and is coordinated through the State Water Board and associated operational leadership.

General Info

Disconnection and inactivation of Well 8 and chlorination system under regulatory permit amendment.

Agency

California → State Water Resources Control Board

Place of Performance

6831 Chevy Chase Way, CA, 95823

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Austin PetersonDistrict Engineer
AUDIE FOSTERDIRECTOR OPERATIONS

Full Description

Show more
The Applicant proposes to disconnect and inactivate Well 8 and chlorination treatment system from the water system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Water Line Replacement on S Center Street and Crane Avenue
Solicitation # 24-022
The City of Turlock, California, is soliciting bids for Project No. 24-022, which involves the water line replacement on S Center Street and Crane Avenue. The scope of work includes the installation of approximately 1,677 lineal feet of new PVC water main pipe and new water service laterals, the removal of existing water main pipe, and the restoration of trenches. The Engineer's Estimate for the project is $1,100,000. Bidders must hold a General Engineering Contractor (A) or Pipeline Contractor (C-34) license and provide a bid bond equal to 10% of the total bid. The contract will be awarded to the lowest responsive and responsible bidder based on licensing, insurance compliance, and relevant experience. The project timeline requires work to commence within ten working days of the Notice to Proceed, with substantial completion due within 60 working days and final completion within 65 working days. Substantial delay damages are set at $2,800 per substantial working day and $700 per final working day. The contractor must provide performance and payment bonds each equal to 100% of the contract price and adhere to California prevailing wage rates. Payment will be made via monthly progress invoices, subject to a 5% retention released approximately 35 days after the Notice of Completion. Proposals are due by 11:30 am on November 4, 2026, via the OpenGov Procurement Portal.
Municipal Services-Engineering

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS