The City of Caldwell is inviting qualified contractors to submit sealed bids for the demolition of an existing building located at 7/9 S Main, Caldwell, KS 67022. The project requires the full removal of all structures, foundations, and associated utilities, along with site grading, backfilling, and surface restoration to ensure the area is safe and compliant for future development. An optional alternate bid is available for the salvage and stabilization of the East façade. Bids must be submitted as a stipulated sum and are due by 12:00 p.m. local time on August 10, 2026, at the City Office at 14 W Central, Caldwell. A prebid meeting and site visit are scheduled for July 8, 2026, at 113 S Main, and attendance is strongly encouraged. All bids must be accompanied by a bid bond equal to at least five percent of the bid amount and remain irrevocable for 60 calendar days after submission. The project must reach Substantial Completion within 90 calendar days and full completion within an additional 30 days. Bids will be publicly opened immediately after the deadline, and the City Commission will review and act on the lowest qualified bid during its meeting on August 19, 2026. The City reserves the right to waive irregularities and to accept or reject any bids. Bidding documents are available at no cost by contacting City Administrator Leah Sommerhoff.

General Info

Demolish building at 7/9 S Main, Caldwell, KS; bid due Aug 10, 2026; 90-day completion; bid bond required.

Agency

Kansas → Ranson Financial GroupView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Caldwell, KS, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKansas → Ranson Financial Group
Contacts1 person available
OfficeN/A
Organization / Agency
Kansas → Ranson Financial Group
View Agency Profile
Office AddressN/A

Interested Companies (4)

Show more
ePlan
Columbia, Missouri
Lincoln Builders Bureau
Lincoln, NE
Envirobidnet
PORT CHARLOTTE, FL

See All 4 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Dated: 6/19/2026
1.1 IDENTIFICATION
A. Project: Caldwell 7/9 S Main Demolition.
a. Located: 7/9 S Main, Caldwell, KS 67022.
B. Owner:
City of Caldwell
14 W Central
Cadwell, KS 67022
C. Architect:
BG Consultants, Inc.
4806 Vue Du Lac Place
Manhattan, Kansas 66503
D. Date: June 2026.
1.2 INVITATION
A. Your firm is invited to submit a sealed bid to the Owner for demolition to the existing facilities located at address above.
B. Project Description:
The project includes demolition of an existing building on Main St in Caldwell, KS. This will involve the removal of all structures, foundations and utilities associated with these buildings, as well as site grading, backfilling, and surface restoration to ensure the area is safe and compliant for future plans. In addition, an alternate bid will be provided for the salvage and stabilization of the East façade.
C. Bids will be on a stipulated sum basis.
D. The Owner requires the Project to achieve Substantial Completion within 90 calendar days and Project Completion within a following 30 calendar days.
E. A prebid meeting will be held at 113 S Main beginning at 11:00a.m. local prevailing time on July 8th for 7/9 S Main, Caldwell with a site visit to follow. Bidder attendance is strongly encouraged.
F. The Owner will receive bids until 12:00 p.m. local prevailing time on August 10, 2026 at the City Office located at 14 W Central, Caldwell, KS. Bids received after this time will not be accepted. The owner will make a motion regarding the lowest qualified bid at the City Commission Meeting on August 19, 2026.
G. Bids will be opened publicly and read aloud immediately after bid submittal time. All interested parties are invited to attend.
H. Bidding documents may be obtained at no cost by general contract bidders by contacting the City of Caldwell, Kansas. The City Administrator, Leah Sommerhoff, lsommerhoff@caldwellkansas.com, 620-845-6514.
I. Bidders are required to provide bid security in the form of a bid bond in a sum no less than 5 percent of the bid sum.
J. Bid are required to be submitted under a condition of irrevocability for a period of 60 calendar days after submission.
K. The Owner reserves the right to waive irregularities and to accept or reject any and all bids.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers for the Monterey One Water Regional Treatment Plant Renewable Energy Improvements Project, designated as CP361, located in Marina, California. The project encompasses a wide range of upgrades aimed at enhancing renewable energy production and operational safety at the facility, including replacement of digester gas piping and safety systems, installation of new level measurement devices and five linear generators with associated electrical work, and implementation of biogas conditioning and renewable natural gas upgrading equipment connected to a pipeline for injection into the PG&E network. Additional work involves recoating digester interiors, repairing concrete structures, replacing roof hatches with concrete repair provisions, demolishing the existing Cogen facility, replacing the steam boiler system with a hydronic heating system, and swapping outdated waste gas flares with enclosed alternatives. The scope also includes civil, structural, mechanical, and electrical improvements tied to these core upgrades. Bidders must respond to the solicitation by the deadline of August 20, 2026, and are required to express interest by emailing estimating@gseconstruction.com to receive secure access to all project documentation. The procurement is open to firms certified under non-federal Disadvantaged Business Enterprise, Minority Business Enterprise, and Woman Business Enterprise programs, with certifications through NMSDC and WBENC respectively. While the NAICS code listed in the data is 238910, the solicitation explicitly targets subcontractors and suppliers aligned with codes including 237310, 238110, 238120, 238190, 238320, 238220, and 238210, indicating broad participation expectations across specialized trades. All bids must be prepared in accordance with the detailed project documents provided upon request, and the point of contact for inquiries is Michael Demissie at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor and Construction Manager, encompasses a broad range of construction activities critical to the expansion and modernization of the terminal’s S Concourse. The scope includes demolition and abatement, concrete retrofitting, structural steel and metal stair installation, fire suppression systems, site paving, runway and taxiway marking, site demolition and earthwork, deep foundations, utilities installation, aviation fueling systems, and baggage handling systems. Each subsystem carries a defined budget range, with the total estimated contract value falling between $124.2 million and $143.7 million, reflecting the scale and complexity of the work. The project is designated as a Small Disadvantaged Business (SDB) set-aside under NAICS code 238910, and all bidders must comply with Hensel Phelps’ standardized subcontracting requirements, which mandate the use of pre-approved subcontract forms and the submission of performance bonds for all subcontracts exceeding $100,000. This solicitation operates under a Project Labor Agreement, requiring adherence to specific labor standards and conditions, and necessitates a Workers' Compensation Waiver of Subrogation from all subcontractors. Bids must be submitted via email to sea-scebids@henselphelps.com no later than August 11, 2026, using the official bid form provided in the Instructions to Bidders package, and must include required bonding documentation. The place of performance is clearly defined as the Seattle-Tacoma International Airport, and all contractors are expected to follow Hensel Phelps’ protocols for subcontract management, insurance compliance, and equal opportunity employment practices. Although key administrative details such as payment terms, contract administration contacts, and exact performance duration are unspecified, the clarity of scope, budget ranges, and mandatory compliance requirements positions this as a strategically significant infrastructure opportunity targeted toward qualified SDB contractors with expertise in large-scale aviation construction.
Hensel Phelps

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to support the design-build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, with a solicitation deadline of August 11, 2026. The project, designated as 2026-138, involves building a 0.50 MGD facility to produce approximately 500 acre-feet annually of purified water for groundwater recharge, including key components such as a 200,000-gallon equalization tank, membrane filtration and two-stage reverse osmosis systems, UV/advanced oxidation, post-treatment stabilization, chlorination, chemical storage, purified water storage and pumping, nearly 2,000 linear feet of HDPE conveyance pipelines, and groundwater recharge infrastructure with one injection well and two monitoring wells. Electrical, instrumentation, SCADA, and controls systems are also within scope. Solicitations are open under specific NAICS codes including 237110, 238120, 237310, 238990, 561730, 238110, 238320, 332312, 238220, and 221310, with an emphasis on small business, small disadvantaged business, women-owned small business, disadvantaged business enterprise, and minority business enterprise participation as defined under SBA and non-federal certification programs. Interested parties must request access through estimating@gseconstruction.com to receive secure project documentation prior to submission, with primary points of contact being Michael Demissie and Juan Catano.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details