Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Call 015 T4746

Active
T4746State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Martin, FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida Department of Transportation
ContactsNo contacts available
OfficeFL, USA
Office AddressFL, USA
ContactsNo contact information available

Full Description

Show more
LETTING LOCATION: Contracts Administration Office POSTING DATES: 01/14/2027 and 01/21/2027 CONTRACT DAYS: 315 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 120 Days The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, barrier, ped LCD, arrow board, signalization, traffic detection, PCMS, business sign), monitor structures (inspection, settlement, vibration), environmental protection (sediment barrier, inlet, tree), earthwork (excavation, embankment, borrow), concrete (removal, curb, gutter, separator, sidewalk, driveway), asphalt (stabilization, base, milling, resurfacing), pavement markings (detectable, RPM, painted, thermo, bike lane), signing (single-column, internally-illuminated), lighting (conductors, load center, luminaire, pole complete, cable distribution), IST (subsurface doc, location doc, CCTV camera), fiber optic (cable, termination, hardware, locate), signalization (cable, cable remove, span wire remove, prestressed pole F&I/remove, aluminum pole pedestal/remove, steel mast arm, vehicular signal/detection, vehicular video/AVI, ped signal/detection, signal preemption system, controller, field ethernet, UPS), conduit (open trench, directional bore), pull/splice box, electrical service (power, wire), and sod at the intersection(s) of State Road 5 (US-1/NW Federal Highway) and NW Baker Road, and NW North River Shores Boulevard, and NW Sunset Boulevard, for a total of 0.227 miles in the City of Stuart, and in unincorporated portions of, Martin County.

More opportunities from Florida Department of Transportation

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS