Call 015 T4746
Active
T4746State & LocalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
PhaseSolicitation
Response Deadline
Organization & Contact Information
Show more
AgencyFlorida Department of Transportation
ContactsNo contacts available
OfficeFL, USA
Organization / AgencyFlorida Department of Transportation
Office AddressFL, USA
ContactsNo contact information available
Full Description
Show more
LETTING LOCATION: Contracts Administration Office
POSTING DATES: 01/14/2027 and 01/21/2027
CONTRACT DAYS: 315
CONTRACT EXECUTION DAYS: 10
SPECIAL START DATE: N/A
ACQUIS./FLEXIBLE START TIME: 120 Days
The Improvements under this Contract consist of, but are
not limited to, MOT (standard, traffic control officer,
barrier, ped LCD, arrow board, signalization, traffic
detection, PCMS, business sign), monitor structures
(inspection, settlement, vibration), environmental
protection (sediment barrier, inlet, tree), earthwork
(excavation, embankment, borrow), concrete (removal, curb,
gutter, separator, sidewalk, driveway), asphalt
(stabilization, base, milling, resurfacing), pavement
markings (detectable, RPM, painted, thermo, bike lane),
signing (single-column, internally-illuminated), lighting
(conductors, load center, luminaire, pole complete, cable
distribution), IST (subsurface doc, location doc, CCTV
camera), fiber optic (cable, termination, hardware,
locate), signalization (cable, cable remove, span wire
remove, prestressed pole F&I/remove, aluminum pole
pedestal/remove, steel mast arm, vehicular
signal/detection, vehicular video/AVI, ped
signal/detection, signal preemption system, controller,
field ethernet, UPS), conduit (open trench, directional
bore), pull/splice box, electrical service (power, wire),
and sod at the intersection(s) of State Road 5 (US-1/NW
Federal Highway) and NW Baker Road, and NW North River
Shores Boulevard, and NW Sunset Boulevard, for a total of
0.227 miles in the City of Stuart, and in unincorporated
portions of, Martin County.
More opportunities from Florida Department of Transportation
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
