This Solicitation opportunity from Maryland was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Call 100 BB-3004-0000R
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract, identified as Call 100 BB-3004-0000R, is a solicitation issued by the Maryland Department of Transportation for Phase 1 of a new construction project involving a project office, maintenance storage building, and associated infrastructure improvements located in Anne Arundel County, Maryland. The work encompasses design, installation, and integration of mechanical, electrical, and technology systems across Divisions 2 through 33 of the contract documents, including equipment setup, labeling, commissioning, and adherence to rigorous technical specifications such as NFPA 70, BICSI guidelines, and ASME A13.1 for pipe identification. All work must meet Maryland DOT-specific standards, and deliverables include shop drawings, as-built documentation, operation and maintenance manuals, and commissioning records certified by qualified personnel, including BICSI-certified technicians and RCDDs. The contract is structured as a competitive, fixed-price bid with evaluation based on the Lowest Price Technically Acceptable method, where technical acceptability—particularly compliance with mandatory minority business enterprise (MBE) and veteran-owned small business enterprise (VSBE) participation requirements—is a non-negotiable threshold for award consideration. The solicitation imposes strict compliance obligations related to socioeconomic goals, requiring bidders to submit Form A and Form B to demonstrate commitment to achieving a 25% overall MBE goal with sub-goals of 14.3% African American-owned, 5.4% Hispanic-owned, 3.7% Asian-American-owned, and 1.6% other MBEs, along with a 1% VSBE goal. Failure to submit these forms results in automatic disqualification. Bidders must also document good faith efforts to engage certified MBEs, provide assistance with bonding and credit, and submit Form C and Form D within ten days of potential award. Equipment and materials must comply with packaging and labeling requirements including UV-stable, fade-resistant markers with metallic components for underground utilities, ASME A13.1-compliant pipe labels, and standardized equipment tags with specific dimensions and color schemes. Safety protocols demand submission of lead work and respiratory protection plans, daily logs, and medical approvals prior to commencement. The contractor is responsible for all testing and inspection, using third-party vendors to confirm compliance with NETA, UL, and ASTM standards, and must provide a two-year warranty from substantial completion. Proposals must be submitted electronically via ProjectSolve2© in Adobe PDF format compliant with Acrobat 6.
General Info
Agency
NAICS
Place of Performance
Anne Arundel, MD, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
