Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Call 353 LOR102655

Active
LOR102655State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves rehabilitation work on two twin 161-inch by 101-inch corrugated arch culverts in the City of Lorain, Lorain County, Ohio, using a spray-applied structural liner to improve their structural integrity. Additionally, the project requires the complete replacement of the deck, parapets, bearings, portions of crossframes, and abutments for the structure carrying westbound SR 611 traffic as it connects to westbound US Route 6, along with necessary patching and associated repairs. The scope also includes a limited amount of earthwork and asphalt work to support the overall rehabilitation efforts, all performed in strict accordance with approved plans and specifications. All work is to be executed in compliance with Ohio Department of Transportation standards and under the oversight of the state’s transportation agency.

General Info

Rehabilitate twin corrugated culverts and replace deck, parapets, bearings, abutments for SR 611 connecting to US 6.

Agency

Ohio Department of TransportationView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Lorain, OH, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio Department of Transportation
ContactsNo contacts available
OfficeOH, US
Organization / Agency
Ohio Department of Transportation
View Agency Profile
Office AddressOH, US
ContactsNo contact information available

Full Description

Show more
FOR IMPROVING VARIOUS SECTIONS IN THE CITY OF LORAIN, OF LORAIN COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY APPLYING A SPARY APPLIED STRUCTURAL LINER TO THE TWIN 161" X 101" CORRUGATED ARCH CULVERTS, AND TO REHABILITATE THE STRUCTURE CARRYING WESTBOUND SR 611 TRAFFIC TO WESTBOUND US ROUTE 6 BY REPLACING THE EXISTING DECK AND PARAPETS, BEARINGS, PORTIONS OF THE CROSSFRAMES AND ABUTMENTS, AND SOME PATCHING, INCLUDING ALL RELATED ITEMS OF WORK. PROJECT INCLUDES A SMALL AMOUNT OF EARTHWORK AND ASPHALT.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization, safety, and operational reliability. Key efforts include replacing aging airfield lighting circuits with low megger readings with new LED fixtures and signs to enhance visibility and energy efficiency. Concurrently, failing pavement sections and critical underground utilities will be removed and replaced to ensure structural integrity and prevent service disruptions. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter birds, and the regrading of low-lying areas coupled with new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. The work is part of the larger AIRFIELD 2030 initiative and falls under NAICS code 237990, with all performance obligations tied to the Port of Seattle’s aviation facilities. The contract is forecasted under the Aviation Project Management Group and will be managed by Yanet Maldonado, the primary point of contact, who can be reached via phone or email for inquiries. There is no formal solicitation number yet, and the contract is currently in the pre-solicitation phase with a posted date of July 23, 2026. No set-aside provisions are specified, and the location of performance is centered on the Port of Seattle’s airfield assets. All components of this project are designed to enhance safety, regulatory compliance, and long-term operational resilience of the airfield infrastructure.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract, titled 2027 Airfield Project - Contract 2, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a wide range of airfield infrastructure improvements aimed at enhancing safety, efficiency, and compliance. Key tasks include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utility systems will be replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation measures are also included, such as the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage, and the regrading of areas with ponding issues alongside the installation of new storm drainage infrastructure to reduce bird attraction and improve water runoff. Additionally, the project involves replacing deteriorated flush fire hydrant access hatches to ensure rapid and unimpeded access for emergency response. The work is classified under NAICS code 237990 and is forecasted for future award, with the solicitation posted on July 23, 2026. Primary point of contact is Moraa Omwega, reachable via email and phone, with David Neds serving as the Project Manager for technical oversight. The contract is intended for performance at the Port of Seattle’s airfield facilities, though exact location details are not specified in the metadata, and interested parties are directed to the official portal for further details.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details