Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clara Valley Water District is seeking to decommission Well B (State ID# 07S01W27P009) at the Campbell Well Field, a groundwater facility located at 47 Maravilla Court in Campbell, California. The project involves sealing the well with cement in one continuous event, with the finish installed to the level of the top of the well casing and smoothed to match the existing pump pedestal surface. The work is categorized under NAICS code 237110 and has been granted a Categorical Exemption (Class 1, Existing Facilities) under CEQA. The well is situated within a pump house on a paved area of Valley Water owned land, with overhead access provided via a 4-foot by 4-foot skylight. Site logistics require all vehicles and equipment to use a single ingress and egress point off Campbell Avenue. Additionally, the project site contains a storm drain discharging into San Tomas Aquino Creek, located approximately 0.4 miles west of the boundary. Primary administrative contact for the project is Senior Environmental Planner Ernest Chen, with oversight by Gregory Williams, Deputy Operating Officer of the Raw Water Division.

General Info

Santa Clara Valley Water District will decommission and seal Well B in Campbell, California.

Agency

California → Santa Clara Valley Water District

Place of Performance

47 Maravilla Court, Campbell, CA, 95008

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Clara Valley Water District
Office AddressN/A
Contacts
Ernest ChenSenior Environmental Planner

Full Description

Show more
The Campbell Well Field (CWF) is a groundwater facility comprised of three production wells and associated utility infrastructure owned and operated by Valley Water, located at 47 Maravilla Court, Campbell, CA. The Project is to decommission Well B (State ID# 07S01W27P009) of the CWF. Well B is located within a pump house near a residential area (see Figure 1). The pump house is located within an approximately 1,800 square foot level and paved area on Valley Water owned land. Overhead access for well decommissioning activities is through a 4-foot by 4-foot skylight in the roof of the pump house. The well would be sealed with cement poured in one continuous event and will be installed to the level of the top of the well casing and smoothed to match the existing pump pedestal surface. Within the paved area is a storm drain that discharges directly into San Tomas Aquino Creek, which is located approximately 0.4 miles west of the western boundary of the site. All vehicles and equipment will access the site using the sole ingress/egress access point off Campbell Avenue.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. The project estimate is 16,690,000 dollars, and the contract will be awarded to the responsible bidder submitting the lowest responsive bid. The procurement process requires bidders to submit a signed bid form, a bid bond, evidence of authority to sign, and MWBE documentation, including a Good Faith Efforts Form and Table A. The contract is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance from the successful contractor. Performance is measured against strict technical standards, including AWS, SMACNA, NEMA, and ASTM specifications. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as the installation of site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract amount, compliance with Davis-Bacon wage determinations, and adherence to OSHA and ADA standards. Bidders must provide a Quality Management Plan, a Timeliness Tracking Plan, and at least three references for similar projects.
WG Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS