Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 26, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Canaveral Harbor Sand Bypass System Phase V Brevard County, Florida

Awarded
W912EP-18-B-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Canaveral Harbor Sand Bypass System Phase V project in Brevard County, Florida, was awarded to Norfolk Dredging Company on September 26, 2018, for a total amount of 18,076,560.00. This unrestricted acquisition, managed by the Department of Defense under the USACE Jacksonville District, covers base work and options A and B. The project scope involves dredging beach compatible sand from the Sand Bypass Dredging Area north of the Canaveral Harbor Inlet and transporting it to a designated beach placement site south of the inlet. This process requires the installation and removal of a pipeline via an excavation trench under the navigation channel, with dredged material from the trench side-casted within the channel. The contract required the use of a Coast Guard certified hopper dredge and included incidental tasks such as beach tilling, vibration control, and monitoring for turbidity, birds, and endangered species. The work falls under NAICS code 237990, with an anticipated period of performance of 211 calendar days from the issuance of the Notice to Proceed. The procurement process was managed by contract specialists William Wallace and Timothy Humphrey, with the final award encompassing line items 0001 through 0030.

General Info

Contract Value

$17,419,935

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Synopsis of Award - W912EP18C0029 (Norfolk Dredging Company)

PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Aug 28, 2018 to Sep 11, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 11, 2018 to Sep 20, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
William WallaceContract Specialist
Timohty G. HumphreyContract Specialist

Full Description

Show more
A Pre-Proposal Conference call will be held on Wednesday, 29 August 2018 FROM 10:00AM - 11:00AM. The call-in number is: +1 (555) 000-0000, the ACCESS CODE is: 6546236, and the SECURITY CODE is: 2873. It is requested that an email be sent to contact@example.gov to confirm attendance by your organization. DESCRIPTION OF WORK: The project consists of base and option work for dredging beach compatible sand from the Sand Bypass Dredging Area (SBDA) north of the Canaveral Harbor Inlet and transporting the dredged material to a designated beach placement site south of the inlet. The sand material will be transferred under the Canaveral Harbor navigation channel via a pipeline excavation trench. The pipeline is to be installed and removed by the Contractor as part of the project work. Material dredged to install the pipeline shall be side-casted downstream and within Canaveral Harbor Channel. Incidental work includes beach tilling, turbidity monitoring, vibration control monitoring, bird monitoring, and endangered species monitoring. The anticipated Period of Performance is 211 calendar days from issuance of Notice to Proceed. PROPOSAL REQUIREMENTS: The Invitation for Bid (IFB) will be issued on or about 8 Aug 2018 and bids will be due on or about 20 September 2018. NAICS Code 237990, size standard $27.5 million. Magnitude of construction is between $15,500,000.00 and $26,000,000.00. THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. NOTE: COAST GUARD CERTIFIED HOPPER DREDGE IS REQUIRED. The IFB will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must register as an interested vendor on the Federal Business Opportunities website at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call +1 (555) 000-0000 or visit the SAM website at https://www.sam.gov/.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS