Robins AFB UP Wastewater Treatment Service

Active
FA3002-10-R-0039Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the wastewater collection and treatment system at Robins Air Force Base (AFB) in Warner Robins, Georgia, focusing specifically on the domestic (sanitary) wastewater system while excluding the industrial wastewater treatment plants and the groundwater treatment plant (GWTP). The domestic system includes an extensive network of collection piping, manholes, lift stations, and a primary treatment facility known as Domestic Wastewater Treatment Plant No. 1 (SWTP 1). This facility, originally constructed in 1942 and upgraded in 1971 with subsequent expansions, performs multi-stage treatment processes including primary, secondary, and tertiary treatment before discharging treated effluent into the Ocmulgee River under an NPDES permit. Several lift stations, which have been modernized with upgraded pumps and SCADA monitoring (though SCADA is not part of the privatization), distribute the wastewater to SWTP 1 for final processing. Additionally, the system includes infrastructure to handle treated effluent blending from industrial plants and the GWTP prior to discharge. The wastewater collection system primarily consists of vitrified clay and concrete pipes, with many sections having undergone cleaning, inspection, and repair under a five-year improvement program that addressed approximately 50 miles of pipeline. The site has certain areas with excavation restrictions due to historical contamination in the industrial zone, requiring adherence to a remediation plan to limit exposure risks during maintenance or construction activities. Challenges such as occasional discharges of Aqueous Film Forming Foam (AFFF) necessitate special treatment adjustments like de-foaming agents. Though treatment equipment at an additional domestic treatment plant (SWTP 2) has been removed and repurposed as a lift station to transfer wastewater to SWTP 1, the overall system has evolved to ensure effective management and compliance, with a well-defined network supporting the base's wastewater needs. The contract had been initially publicized under solicitation FA3002-09-R-0008, with the location of performance at Robins AFB, but later associated solicitations, such as FA3002-10-R-0039, were canceled.

General Info

Contract manages domestic wastewater system at Robins AFB, excluding industrial and groundwater plants.

Agency

N/A

NAICS

221320 - Sewage Treatment Facilities

Place of Performance

Robins AFB, GA, WARNER ROBINS, GA, 31098, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhasePresolicitation
Posted

Presolicitation

Notice updated

The response deadline was removed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Robert C. GableContracting Officer
Mariann WeberContracting Officer

Full Description

Show more
Note: This requirement was initially publicized under Solicitation No. FA3002-09-R-0008. The wastewater collection and treatment system at Robins AFB includes the domestic (sanitary) system. The industrial wastewater collection system and associated treatment plants are not included with the system to be privatized. Each system has its own set of collection piping and treatment facilities. The industrial system is made of up two treatment plants ? IWTPs 1 and 2. IWTP 1 discharges directly into the domestic treatment plant for final polishing. The POD from IWTP 1 is a buried valve at the north end of the Biological Treatment plant aeration basins. The treated effluent from IWTP 2 is combined with the treated effluent from the Domestic Wastewater Treatment Plant in the effluent pump station. The point of demarcation is where the effluent from IWTP 2 enters the wet well at Building 8369. There is also an on-Base GWTP, whose treated effluent is also combined in the effluent pump station. In addition, the backwash from the carbon columns at the GWTP is discharged into the line from IWTP 1 to SWTP 1, upstream of the Biological Treatment plant aeration basins. The GWTP, and its associated infrastructure, is not included with the wastewater system being privatized. The POD for GWTP discharge is where effluent from the GWTP enters the pipe between the chlorine contact chamber and Parshall flume. The POD for the backwash is the buried valve at the north end of the Biological Treatment plant aeration basins. Treated wastewater from the Domestic Wastewater Treatment Plant, IWTP 2, and the GWTP are combined in the effluent pump station prior to discharge offsite into the Ocmulgee River. Robins AFB?s treated wastewater is discharged into the Ocmulgee River under national pollutant discharge elimination system (NPDES) Permit No. GA 0002852. There are three compliance points (outfalls) with permit limits for wastewater discharge, one each, from the Domestic Wastewater Treatment Plant, GWTP, and IWTP 2. Outfall No. 008 is the monitoring point for the IWTP 2. Outfall, No. 009 is the monitoring point for the Domestic Wastewater Treatment Plant, Outfall No. 010 is the monitoring point for the GWTP. The original construction of the domestic system infrastructure began in 1942. The domestic system consists of collection piping, manholes, lift stations, and a treatment plant. The original domestic wastewater treatment plant is not currently operational. In 1971, the original 1942 treatment plant was replaced with a more modern facility, which was designated as Domestic Wastewater Treatment Plant No. 1 (SWTP 1). SWTP 1 was originally designed to provide preliminary, primary, secondary, and tertiary treatment prior to discharge into the Ocmulgee River. The POD is where the discharge pipeline terminates at the Ocmulgee River. The original treatment facility consisted of a plant headworks, grit chamber, grinder, influent Parshall flume, primary sedimentation tanks, trickling filters, secondary clarifiers, centrifuge, and disinfection with chlorine. Solids handling consisted of anaerobic digestion. The treatment facility was expanded in 1978 to include additional primary sedimentation tanks, aeration tanks (nitrification tanks), new secondary clarifiers, tertiary filters, and chlorination and dechlorination facilities. Aerobic digesters and drying beds were added to the solids-handling facilities to replace the anaerobic digesters. Except for the former digesters of the original biological treatment facilities, these facilities are currently not in use. One of the former aeration basins has been converted to an aerobic digester to increase the capacity of SWTP 1. The second aeration basin has been converted into a holding tank for temporary storage of IWTP 1 discharge. Temporary storage of IWTP 1 discharge is required periodically to prevent SWTP 1 plant upsets. Occasionally discharge from IWTP 1 contains constituents harmful to the biological treatment processes of SWTP 1 and requires reduced blending rates through SWTP 1. The holding tank is used to achieve the required blending rates to prevent upsets at SWTP 1. Further modifications made to SWTP 1 treatment facilities include the addition of an ultraviolet disinfection facility and the installation a plant-effluent pumping station. Chlorine disinfection is currently the primary treatment as the ultraviolet disinfection facility is inefficient for final polishing due to the iron content in the wastewater. Sludge generated from the aerobic and anaerobic (following stabilization) digesters is transferred for de-watering Base Notice: Air Force Utilities Privatization Effort for Robins AFB Wastewater Distribu... Page 2 of 4 https://www.fbo.gov/index?print_preview=1&s=procurement&mode=form&id=24bdf37b... 2/13/2009 to a centrifuge at SWTP 1. The de-watered solids are then disposed of offsite at an approved facility. In the 1960s, a treatment plant was constructed in the Building 800 area, near housing, to handle the increased load from the housing areas. This facility was referred to as Domestic Wastewater Treatment Plant No. 2 (SWTP 2). Currently, treatment equipment has been removed from SWTP 2 and replaced with a lift station located at the former headworks, which is used to transfer wastewater to SWTP 1. This lift station and the drying beds, which are still in service, are referred to as SWTP 2. There are 50 domestic wastewater lift stations located throughout the Base that are used to transfer wastewater to other lift stations or manholes. All the sanitary wastewater is transferred to SWTP 1 for processing. Most of the lift stations are equipped with two submersible-type pumps. Pumps and controls at the lift stations have been upgraded or replaced since 1991. SCADA monitoring equipment has been added, or is in the process of being added, to the lift stations. The SCADA system is not included with the system to be privatized. Original materials of construction for the collection system consisted primarily of vitrified clay and concrete pipe with brick manholes. New construction is generally polyvinyl chloride (PVC) pipe, and concrete manholes. Standard installation practices are to install tracer wire or tape with plastic piping; however, it is not known if all plastic piping was installed with tracer wire or tape. The Contractor should not include any projects to install tracer wire on piping in their proposal. Any requirements for tracer wire will be addressed after contract award. Most of the pipe is 4 to 15 inches in diameter. The domestic collection system is comprised of several different piping materials, including cast iron, asbestos cement, reinforced concrete, vitrified clay, ductile iron, and PVC. Approximately 70 percent of the collection piping material is vitrified clay or concrete, of which approximately 90 percent has been slip-lined. The average burial depth of the piping is approximately 8 feet below ground surface. Approximately 25 percent of the collection system is installed beneath paved surfaces. Robins AFB has completed a five-year collection pipe improvement program to clean, inspect, and repair the sanitary sewer lines. Approximately 50 miles of pipe were cleaned and inspected through this program. Approximately 180 point repairs have been completed along these sections of pipe. The repairs were noted as point repairs and also include some repairs made for pipe breaks, which were independent of the program. In some cases, the point repairs were instead full segment repairs. Generally, lines are being repaired by slip lining with high-density polyethylene (HDPE) pipe or with an in-situ liner. Air Force operations include occasional, unscheduled, discharges of Aqueous Film Forming Foam (AFFF) to the wastewater treatment system. Current treatment plant operations include the addition of de-foaming agents. Robins AFB has excavation restrictions in portions of the Industrial Area due to contamination of subsurface soils and groundwater from spills, leaks, and other releases that predate regulatory restrictions. This restricted excavation area houses machine shops, metal finishing, industrial waste treatments plant and associated underground piping, industrial materials storage, and drummed waste storage facilities. Implementation of the remedy selected in the Excavation Plan for the Industrial Area is required in order to ensure the protection of personnel coming into contact with the site and to eliminate or minimize risk associated with the contamination. This area of the Base is 84 percent paved, behind security fencing, under building foundations, or beneath streets. There is very limited potential for exposure to workers or visitors in the area. The most likely scenario in which exposure to contaminated soils might occur is in the event of maintenance or construction activities requiring excavation of affected soil. Maps of the area and a copy of the Excavation Plan for the Industrial Area will be supplied in the technical library. This synopsis shall not be construed as a commitment or authorization to incur costs in anticipation of an award. The Government is not bound to make any awards under this notice. Place of Contract Performance: Robins AFB, GA, 31098

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Sioux City Wastewater Treatment Plant Facility Plan - Phase 1 Improvements Project
Solicitation # sioux-city-wastewater-treatment-plant-facility-plan-phase-1-improvements-project
The Sioux City Wastewater Treatment Plant Facility Plan Phase 1 Improvements Project, managed by Rice Lake Construction Group, involves extensive infrastructure upgrades and modernization in Iowa. Key mechanical and process improvements include the replacement of preliminary treatment equipment, primary clarifiers, and the RAS pump station, alongside the rehabilitation of aeration tanks and the conversion of an anaerobic digester for sludge storage. The project also features the construction of a new secondary control building, plant-wide odor control systems, new standby emergency power generators, and comprehensive SCADA system upgrades to ensure operational efficiency and safety compliance with NFPA 820 standards. The scope of work encompasses significant demolition of unused structures and buildings, paired with wide-ranging civil and structural improvements. Required materials and services span hazardous material abatement, concrete and masonry work, HVAC, electrical systems, and specialized water and wastewater equipment. This solicitation, categorized under NAICS code 221320, requires responses by October 28, 2026, and includes various site-wide utilities and process interconnection tasks to modernize the facility's overall functionality.
Rice Lake Construction Group

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating technical experience, technical approach, key personnel experience, and price. Key requirements include the provision of performance and payment bonds, adherence to union prevailing wage rates, and a 12-month operational support period following construction. Technical specifications emphasize strict cybersecurity hygiene for SCADA/MES equipment, full government rights to supplied software and source code, and compliance with ADA standards. Proposals must be submitted electronically in separate volumes, with specific evaluations focusing on the contractor's ability to manage complex wastewater plant commissioning and regulatory approvals.
Dsc Contracting Services Division

POSTED

4 days ago

DEADLINE

in 29 days
View Details
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221320
Federal
DCDO Septic Tank and Sewage Treatment Maintenance
Solicitation # FA527027QB006
The United States Air Force 18th Contracting Squadron is soliciting quotations for a single-award, firm-fixed-price requirements contract to provide septic tank and sewage treatment plant maintenance services for the Defense Communications Detachment Okinawa (DCDO) in Okinawa, Japan. The contract encompasses a base period from December 1, 2026, to November 30, 2027, with four subsequent option periods extending the total performance through November 30, 2031. The scope of work includes implementing a Preventive Maintenance Inspection Service program, performing general maintenance and repairs, and responding to routine service calls within 24 hours. All maintenance personnel must be certified plant operators approved by the Government of Japan Ministry of Public Health and Welfare. Award will be granted to the responsible offeror whose proposal is determined to be the most advantageous to the government, with price serving as the primary evaluation factor. To be considered responsible, quoters must submit current Industrial Waste Disposal or Collection and Transportation Business licenses. Deliverables include quarterly work reports and personnel access lists submitted one week prior to starting work. The contractor must also adhere to strict marking and labeling standards for any delivered items per MIL-STD-130 and MIL-STD-129. Quotations must be submitted electronically by October 26, 2026, and must include a detailed pricing breakdown via the provided Price Exhibit.
FA5270 18 Cons Pk

POSTED

12 days ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS