This Solicitation opportunity from South Carolina was posted on May 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cannon Circle Drainage Improvement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Cannon Circle Drainage Improvement Project in Greenville, South Carolina, involves significant upgrades to the existing storm drainage system located on Cannon Circle off Griffin Road within the Pine Brook Forest Subdivision. The scope of work includes demolishing and removing the current drainage infrastructure, followed by installing new storm drainage lines and catch basins. After pipe installation, the contractor will be responsible for removing existing asphalt and curbs, then repaving with new asphalt and extruded curbs. Site stabilization measures such as rip rap placement at pipe inlets and outlets, fine grading, and grassing of disturbed areas are also required. The County will handle the staking of the new system, including alignments and elevations, and therefore, construction staking is not included in the contractor’s bid. The project solicitation, titled "Cannon Circle Drainage Improvement Project," was posted on May 9, 2025, with a response deadline of May 30, 2025. It is managed by the Greenville County Engineering & Maintenance Division under the NAICS code 238910, which pertains to site preparation contractors. The contract size is estimated between $500,000 and $1,500,000. The primary point of contact for inquiries is Anthony Dawson, reachable via email at adawson@greenvillecounty.org or by phone at 864-467-4954. The project aims to improve drainage efficiency and site stability, ensuring proper stormwater management within the subdivision.
General Info
Agency
NAICS
Place of Performance
SC, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
