Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on August 19, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cape Henry Light Station Stairway Replacement

Closed
21-14-2745CVA16Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6-meter wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached, while also performing structural repairs to anchor bolts and roof materials. All work must comply with the National Parks Act, the Fisheries Act, and the 2025 National Building Code of Canada. The project is scheduled to be performed during the off-season when the tower is closed, with a final completion deadline of March 31, 2027. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan. Bidders must follow a strict two-submission process, providing the Indigenous Participation Plan as Submission 1 and the Bid and Acceptance Form as Submission 2. Official bids must be submitted via email to soumissionsami-bidsrpc@pc.gc.ca or by fax to 1-855-983-1808 by the closing date of October 29, 2026, at 2:00 PM NDT. Submissions via SAP Ariba, courier, or in-person will not be accepted. Contractors are required to implement comprehensive site-specific health, safety, and environmental plans, including spill control and resource protection, and must provide security personnel to guard the site after working hours.
Parks Canada Agency

POSTED

about 24 hours ago

DEADLINE

in 9 days

General Info

Agency

N/A

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

CAPE HENRY LIGHT STATION W/HOUSING Chesapeake Bay Pilot tower 583 Atlantic Ave, Fort Story, VA, 23459, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Pascal JosephPurchasing Agent

Full Description

Show more
1. GENERAL REQUIREMENTS: The work consist of providing all labor, materials and equipment as required to provide egress staircase and awning at Chesapeake Bay Pilot tower 583 Atlantic Ave, Fort Story, VA 23459. Contractor will ensure that they comply with attached access request procedures to access the work site. 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after approval and shall complete work 45 days after contract is awarded. 3. SCOPE OF WORK: To include but not limited to: .1 Remove existing egress stairway, and awning as directed by the QAE Representative. Remove any old anchors in concrete block and fill iwth concrete patch, paint to match existing paint. .2 Fabricate stairway and awning as close to existing dimensions as possible. The finished product must closely resemble existing stairway in order to preserve historical nature of the building. Stairway must be 23 rungs made of diamond plate steel. angle iron framing for awning must be replaced and awning must cover 2 sides and top angle down for water drainage. Platform at top of stairs must be 4 foot 8 inches by 4 foot 8 inches. the top edge of the new stairway handrail must not be more than 37 inches nor less than 36 inches from the upper surface of the stair rail to the surface of the tread. Stairway must meet current OSHA Standards. .3 Install Stairway and awning using appropriate concrete anchors. Steel square tubing posts must be set in concrete. Sidewalk concrete must be patched after posts are set. .4 Stairway must be hot dip glavanized and then painted white. Awning sheeting must be galvanized and also painted white. .5 Contractor shall restore and portions of the building effected by work to existing conditions.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS