Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CARPENTER ROAD AND PRESCOTT ROAD SIGNAL COORDINATION

Closed
2026-19 (101317)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

1 day ago

DEADLINE

in 18 days
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for tank metals. All work is subject to oversight by a third-party paint inspector, and the project must be completed within 150 days from the Notice to Proceed. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with the Build America, Buy America Act and American Iron and Steel requirements, meaning all iron, steel, and construction materials must be produced in the United States unless a waiver is granted. Additionally, the contract is subject to Davis-Bacon Wage Rates and requires various certifications, including Equal Employment Opportunity and Non-Segregated Facilities. Awarding will be based on the most advantageous bid. Once awarded, the contractor must provide performance and payment bonds within 15 days and submit a list of key personnel before starting construction. Payment is processed monthly via an Application for Payment reviewed by the Engineer.
Berks County

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

1 day ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

2 days ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Modesto, California, is soliciting bids for the Carpenter Road and Prescott Road Signal Coordination project, identified as solicitation number 2026-19. This public works project involves the installation of signal coordination software and hardware, including the deployment of underground and overhead fiber optic cables, conduits, pullboxes, and wireless communication transmitters and receivers. The estimated base bid value is 859,667 dollars, with a project duration of 70 working days starting approximately in December 2026. Bids must be submitted electronically via the OpenGov Procurement portal by September 29, 2026, at 11:00 am. Qualified bidders must hold a Class A California State Contractor License and provide a bid security of at least 10 percent of the bid amount. The contract requires adherence to prevailing wage laws, Buy America provisions, and Title VI non-discrimination assurances. Key technical requirements include compliance with 2023 Caltrans Standard Specifications and ADA accessibility guidelines. The project also involves specific Caltrans encroachment permits for work within state highway right-of-ways and requires the submission of Local Hire and Skilled and Trained Workforce certifications. Award selection will be based on the apparent low bidder.

General Info

Modesto seeks bids for signal coordination project, estimated $859,667, due September 29, 2026.

Documents

9

Attachment A - Plans for Carpenter Road and Prescott Road Signal Coordination Project CML 5059 (262)

PDF, High priority: read this firstspecifications
High

Attachment D - VITAL Package - Modesto Project Construction Notes

PDF, High priority: read this firstspecifications
High

Attachment F - Project Poles Loading

PDF, High priority: read this firstspecifications
High

AT&T Pole Occupancy Request - CITY OF MODESTO - MODESTO PROJECT

PDF, High priority: read this firstpole-occupancy-request
High

IFB No. 2026-19 Carpenter Road and Prescott Road Signal Coordination

PDF, High priority: read this firstifb
High

IFB No. 2026-19: Carpenter Road and Prescott Road Signal Coordination

PDF, High priority: read this firstifb
High

Make Ready Job Detail Worksheet - Modesto Project

PDF, High priority: read this firstsow
High

Specifications for Carpenter Road and Prescott Road Signal Coordination Project 2026-19

PDF, High priority: read this firstspecifications
High

Caltrans Encroachment Permit 10-23-N-UF-0411

PDF, Medium prioritypermit
Medium

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Services
Contacts2 people available
OfficeModesto, CA, 95353, USA
Office AddressModesto, CA, 95353, USA
Contacts

Interested Companies (21)

Road SafetyRancho Cordova, CA
MP Nexlevel Of CaliforniaMERCED, CA

See All 21 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
NOTICE IS HEREBY GIVEN that the City of Modesto, County of Stanislaus, State of California, will receive electronic sealed Bids for the following work: Project Title . The City Clerk of the City of Modesto, California, will accept all required bid forms electronically through the OpenGov Procurement portal prior to Response Submission Date and before Response Submission Time , in accordance with the Contract Documents for the Project Title project. The bid security, if being sent by mail, shall be enclosed in a sealed envelope and filled with the City Clerk, Tenth Street Place,1010 Tenth Street, Suite 6600, Modesto, California 95354, (Mailing Address: P.O. Box 642,Modesto, CA 95353) prior to the Response Submission Date and before Response Submission Time with the outside of the bid envelope indicating: NAME AND ADDRESS OF BIDDER NAME OF PROJECT FOR WHICH BID IS SUBMITTED DATE AND TIME OF BID OPENING

More opportunities from California → Engineering Services

Same awarding agency

NAICS: 541330
SLED
Construction Management, Inspections, and Materials Testing for Tuolumne Boulevard Pavement Rehabilitation
Solicitation # RFP/RFQ 2026-01
The City of Modesto is soliciting proposals for construction management, inspections, and materials testing services for the Tuolumne Boulevard Pavement Rehabilitation project. This federal-aid project involves a grind and overlay of existing pavement, the construction of a new roundabout at the intersection of Paradise Road and Tuolumne Boulevard, the installation of ADA-compliant curb ramps and sidewalk extensions, and upgrades to roadway striping and bicycle facilities. The estimated construction cost is 5,000,000 dollars with a project duration of 180 working days. The selected firm will be responsible for project oversight, contract administration, quality control, materials testing, and the maintenance of a minimum 16 MP time-lapse construction camera system. The procurement process follows a qualifications-based selection where a committee ranks firms based on their project understanding and proposed approach. Proposals must be submitted via the OpenGov Procurement portal by 11:00 am on October 20, 2026, with cost proposals submitted as a separate file. Award requirements include a 10 percent bid security, 100 percent performance and payment bonds, and compliance with prevailing wage laws and Buy America provisions. Technical standards are governed by 2024 Caltrans Standard Specifications and City of Modesto standards, with specific inspection protocols for curb ramps, concrete pavers, and curb and gutter flow-line proof tests.
Engineering Services

POSTED

12 days ago

DEADLINE

in 16 days
View Details
NAICS: 238320
SLED
MURAL ALLEY DOWNTOWN REVITALIZATION PROJECT
Solicitation # 2027-01 (101584)
The Mural Alley Downtown Revitalization Project is a Clean Cal-funded construction initiative managed by the City of Modesto, California, aimed at refurbishing a downtown alleyway. The scope of work includes the installation of concrete, permeable pavers, an archway structure, a roofed trash enclosure, seating, electrical infrastructure, lighting, signage, and the renovation of planter walls on 10th Street. The project has an engineer's estimate of $1,500,000 and a performance period of 98 working days, with an estimated start date in February 2027. Bids are due by October 20, 2026, at 11:00 a.m. via the OpenGov Procurement portal. The contract will be awarded to the lowest responsible and responsive bidder holding a Class A or B California State Contractor License. Requirements for bidders include a 10 percent bid security, Local Hire and Skilled and Trained Workforce certifications, and compliance with prevailing wage laws and Buy America provisions. Once awarded, the contractor must provide performance and payment bonds for 100 percent of the contract cost within five business days. The project emphasizes regulatory compliance, including ADA standards and Disadvantaged Business Enterprise (DBE) goals, with specific reporting requirements for DBE payments. Technical execution must adhere to City of Modesto and State Standard Specifications, with a one-year guarantee for defective work following final acceptance. All materials must be delivered in original manufacturer packaging, and electrical equipment must be U.L. labeled.
Painting and Wall Covering Contractors

POSTED

12 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS