Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Carpentry & Architectural Woodwork

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Carpentry and Architectural Woodwork involves providing comprehensive carpentry services for prime contractors on Town of Greenwich facility projects. The scope of work includes rough carpentry and blocking, finish carpentry, and the installation of architectural woodwork, specifically wood casework featuring laminate cladding or transparent finishes. Deliverables consist of installed cabinetry, trim, and structural wood blocking. The contract is managed by the Connecticut DAS Procurement agency under NAICS code 238130. It was posted on September 23, 2026, with a response deadline of October 21, 2026, at 3:00 PM. Interested parties can find further details through the CTSource Bid Board portal.

General Info

Carpentry and architectural woodwork subcontract for Town of Greenwich facility projects via Connecticut DAS.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

238130 - Framing ContractorsView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

This scope was carved out of 7971.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wallace Center Renovations

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs rough and finish carpentry and installs architectural woodwork for prime contractors on Town of Greenwich facility projects. Executes rough carpentry/blocking (06 10 00), finish carpentry (06 20 00), and installs wood casework with transparent finish or laminate cladding and shop finishing (06 40 00). Delivers installed cabinetry, trim, and structural wood blocking.

Similar Contracts

Same NAICS industry code

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 238990
New
SLED
GCC Baseball & T-Ball Backstop Replacement
Solicitation # 27-09
The Town of Groton is soliciting bids under solicitation number 27-09 for a qualified fencing contractor to replace backstop and fencing systems at the Groton Community Center baseball and T-ball fields located at 61 Fort Hill Road, Groton, Connecticut. The scope of work involves the removal and disposal of existing components and the installation of new commercial-grade galvanized chain-link systems. Specific deliverables include a 12-foot high backstop of approximately 60 linear feet for the T-ball field and a combination of a backstop, canopy, and approximately 60 linear feet of 8-foot high protective side and bench fencing for the baseball field. Technical requirements specify minimum #6 gauge galvanized wire and 4-inch SS40 posts for the baseball backstop, and #9 gauge wire with 2-inch mesh and 2.5-inch SS40 pipe for the T-ball and side fencing. Bidders must provide lump-sum pricing for the T-ball field and baseball field components, totaling a combined project price. Submissions must be delivered in a sealed envelope to the Town of Groton Purchasing Department by 2:00 PM on October 21, 2026. Required documentation includes estimated material lead times, the projected number of working days for installation, manufacturer product information, warranty details, and a list of any required permits. The contractor is responsible for all labor, materials, equipment, and site restoration, including utility mark-outs and ensuring no sharp edges are exposed in public areas. Project coordination will be managed through Steve Moffitt and Joe Ciriello.
All Other Specialty Trade Contractors

POSTED

about 24 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS