Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 15, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Carpet and Vinyl Flooring Bld 160

Closed
F1Y4AA8231A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

326192 - Resilient Floor Covering Manufacturing

Place of Performance

Building 160 F.E. Warren AFB, Cheyenne, WY 82005, CHEYENNE, WY, 82005, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4613 90 Cons Pk
Contacts2 people available
OfficeFE WARREN AFB, WY, 82005-2860, USA
Office AddressFE WARREN AFB, WY, 82005-2860, USA
Contacts
Kate I SchaumannContract Specialist
John C HoffmeisterContract Specialist

Full Description

Show more
This is a combined Synopsis solicitation for commercial items prepared in accordance with the format in FAR 12 Sub Part 12.6 as supplemented with additional information included in this notice. The solicitation is set aside 100% for Small Business. The NAICS code is 326192. The Small Business Size Standard is 750 employees. Description of Services. The contractor shall be fully responsible for compliance with all base, local, state, and Federal environmental/occupational safety laws, rules and regulations. The contractor shall follow life and safety codes, and take necessary actions to avoid conditions, which may be hazardous to the health and safety of base personnel. If there is a change any of the products used, another sample must be provided to the Contracting Officer prior to any installation of the substituted products. Required services to be completed within 180 days from award. Security Passes: The contractor will be required to apply for vehicle passes through Pass and Registration (Bldg 232) and individual identification badges through the 90th Contracting Squadron (Bldg 208). Upon completion or termination of the contract, or an individual's employment on the project, the Contractor will retrieve the identification badges and surrender it to the Security Police, Pass and ID Section. All quotes will be inclusive of all costs. The following clauses will apply to this solicitation and will be incorporated into the award. The Government reserves the right to enter clauses into the award which are not in the solicitation with notice to the selected contractor. This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this address: www.arnet.gov/far. Clauses include: 52.204-7 -- Central Contractor Registration. (July 2006), 52.212-1 -- Instructions to Offerors -- Commercial Items. (Sep 2006), 52.212-3 -- Offeror Representations and Certifications -- Commercial Items (Nov 2006), 52.212-4 -- Contract Terms and Conditions -- Commercial Items, (Feb 2007), 52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Jun 2007), 252.204-7004 Alternate A Central Contractor Registration (NOV 2003), 252.212-7000 Offeror Representations and Certifications--Commercial Items (JUN 2005), 252.212-7001 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items (Apr 2007). FAR Clause 52.252-2 Clauses Incorporated by Reference (Feb 1998). Clauses to be Incorporated by Full Text include 52.237-1 -- Site Visit (Apr 1984), 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (MAR 2007); 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS). (APR 2003). You are encouraged to submit quotes electronically to kate.schaumann@warren.af.mil. Quotes may also be submitted on letterhead and faxed to the attention of Kate Schaumann Contract Administrator @ 307-773-4636. All offerors must complete on-line registration at the following sites: The requirement calls for Contractors to be registered with the Central Contractor Registration (CCR) http://www.ccr.gov. Purchase orders cannot be awarded to companies that are not registered in CCR. Contractors must validate this information by registering at http://orca.bpn.gov. Quotes should be good for 30 days from the date of submittal. Award will be made within 2 days of close of this announcement. Statement of Work Installation of Flooring 1. Scope of Work 1.02 The Contractor shall furnish all labor, new materials, tools, and equipment to complete the work. Daily disposal of scrap material shall be the responsibility of the contractor. 1.03 The 90 MDG staff, patients, and visitors will occupy the facility during this project. The work shall, be completed with minimal disturbance to the daily operations of the clinic. 1.04 The contractor shall take appropriate step to ensure surrounding areas are maintained free of dust and debris resulting from the construction effort. Compliance with infectious control measures is mandatory. Preliminary assessment: High Risk, Class III, project. 2. Materials and Description of Work 2.01 The purpose of this section is to provide guidelines for the requirements necessary for project as provided under this solicitation. The work shall consist of furnishing labor, services, equipment and all other incidental items. 2.02 Cut vinyl-flooring cove at floor/wall interface. Remove vinyl from wall. 2.03 MSDS sheets for all adhesives shall be provided to the 90 MDG Facility Manager for review and acceptance. 2.04 The contractor shall be responsible for the repair of wall damage. This shall include texturing and paint to match. 2.05 The contractor shall provide recommendation and color samples for review by the 90 MDG. 2.06 Carpet squares shall be used for this project. Carpet pile Antron Legacy Nylon, 70 percent solution dyed, 30 percent yarn dyed. Suggested material: Style: 01343 - Waterstone, Color: 69503 - Reich or equivalent. Any change to this selection shall be approved by the 90th Medical Group Facility Manager. Suggested source: Tandus Brands. 2.07 Replacement sheet vinyl shall be Armstrong Medintech, Color: Campannula Buff, Stock #88486 or suitable substitute. Any change to this selection shall be approved by the 90th Medical Group Facility Manager. 3.0 Installation Specifications 3.01 FLOOR COVERING. The floor covering shall be installed with an adhesive as called out by the carpet and/or tile manufacture. As required, hot melt adhesive tape or similar product recommended by the carpet and/or vinyl floor manufacture for taping seams and butting cut edges at backing to form secure seams and prevent pile loss at seams. Prepare floor as recommended by floor covering manufacture. Sub-floor shall be level within - inch in all directions. Sand or grind protrusions, bumps or ridges. Patch and repair cracks and rough surfaces. Fill depressions. Comply with floor covering manufacturers recommendations for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under door in closed position. Do not bridge building expansion joints with continuous carpet. Cut and fit covering to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edging, thresholds, and nosing. Bind or seal cut edges as recommended by floor covering manufacture. Extend floor covering into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves and similar openings. Remove visible adhesive, seam sealer, and other surface blemishes using cleaner recommended by floor covering manufacture. Remove protruding yarns from carpet surface. Vacuum carpet and clean vinyl floor covering. 3.02 VINYL COVE BASE: Vinyl cove molding shall be installed using 4 feet sections, or rolled base molding in carpeted areas. For end-of-runs and joints, butt base molding and cut to avoid gaps. At inside corners, run molding into adjacent wall and cut. Second piece of molding will be carved and butted to form a seamless connection at the corner. For outside corners, wrap base molding around the corner. Seams shall be no less than 12 inches away from corner wraps. Adhesive shall be applied to the back of the base molding using a notched trowel and spread to cover the entire area that will contact the wall. All seams shall be cut square to form a seamless interface. 3.03 The Contractor shall supervise and be responsible for the proper locations and installation of all items. 3.04 The contractor shall be limited to work hours of 7:30 am until 5:00 pm Monday through Friday, excluding Federal and military holidays. Any request by the contractor for other work hours/days must be made in writing to the SABER Office and coordinated through the 90 MDG Facility Manager and/or their representative. The 90 MDG has sole discretion as to whether such requests for other work hours/days will be granted. 3.05 The contractor shall provide advance notice to the 90 MDG Facility Manager of its intention to begin work in a patient treatment area, or Pharmacy. This advance notice shall be provided no less than 24-hours prior to initiating any work in these areas. 3.06 The Contractor shall conduct his operations under the contract in such a manner as to allow, at all times during the performance of the work, ingress and egress for the building occupants. The Contractor shall notify and cooperate with the 90 MDG Facility Manager to coordinate this condition. 3.07 The Contractor shall protect and be responsible for the existing building, facilities, and improvements within the areas of his operations under this contract. Should any portion of the existing buildings or areas be damaged, disturbed, or otherwise affected due to the work of the Contract, the Contractor shall report the conditions and circumstances to the Facility Manager. The contractor shall be responsible to make all necessary repairs and replacements to such damaged work at his own expense and with new materials to match the existing work in every respect, as approved by the Contracting Officer and the 90 MDG. 3.08 All work shall be completed by an experienced and capable worker. Work shall be accomplished in a neat, clean, and professional manner. 3.09 All workers shall receive a HIPPA/Safety Briefing prior to starting work within the clinic. The HIPAA Office and/or the Facility Manager will provide the briefings. 4. Performance of work and clean-up 4.01 The work shall be conducted efficiently at the least inconvenience to the occupants of the 90 MDG clinic. 4.02 All materials removed by the Contractor shall become the property and or responsibility of Contractor to dispose of legally and daily. 4.03 Any damage caused by the Contractor in the performance of this contract shall be the Contractor's exclusive responsibility to repair or replace. 4.04 The Contractor shall develop a completion schedule to follow for the specified work, contingent upon acceptance and approval by the SABER Office and the 90 MDG. 5. Guarantee 5.01 The Contractor guarantees that all installed materials and equipment are new free of defects and were installed in a professional manner. 5.02 In the case of labor, installation, or workmanship defects the Contractor will provide a one-year warranty at no cost to the 90 MDG. 5.03 In the event of a claim of a warranted defect, the 90 MDG shall notify the SABER Office in writing. The 90 MDG shall receive notice from the SABER Office within ten working days of receipt of claim the proposed remedy and time frame work will be completed, and how the proposed completion will be accomplished. 6.0 Time of Completion All work shall be completed within 180 days. 7.0 Pay Requests The contractor shall submit pay requests under the terms and conditions of their contract with the United States Air Force. 8.0 Other Conditions 8.01 The 90 MDG reserves the rights to accept, reject, or amend all bids for materials purchased for this project. 8.02 The 90 MDG reserves the right to periodically inspect the work throughout the course of the contract. All clarifications, questions, etc., shall be presented to the SABER Office in writing. All written directives from the contracting officer will be binding upon the contractor and 90 MDG. Please contact Kate Schaumann at: kate.schaumann@warren.af.mil or 307-773-2454 to receive a floor plan and estimated measurements for the project. A site visit is highly suggested since the contractor will be held to his quotation as measurements provided by the government are only estimates.

More opportunities from Department Of Defense → FA4613 90 Cons Pk

Same awarding agency

NAICS: 488190
New
Federal
Notice of Intent to Single Source MH-139A Battery Maintenance Service
Solicitation # FA461327Q1002
The 90th Contracting Squadron at F. E. Warren AFB, Wyoming, intends to award a single-source, firm-fixed-price contract to Carter's Avionics & Aviation Maintenance, LLC for comprehensive maintenance of up to ten sets of Government-owned MH-139 Nickel-Cadmium batteries. This acquisition is conducted under the statutory authority of 41 USC 1901 and is designated as a total small business set-aside under NAICS code 488190. The anticipated award date is approximately October 30, 2026. However, funds are not currently available, and the government's obligation is contingent upon the appropriation of funds. The government reserves the right to cancel this notice without reimbursing offerors for any costs. The scope of work requires the contractor to provide all necessary personnel, equipment, and facilities in or near Cheyenne, Wyoming, to perform storing, servicing, inspecting, fluid leveling, discharging, charging, and testing of batteries in accordance with OEM specifications and USAF Technical Order 00-20-1. Key performance requirements include maintaining at least two batteries in warm status, ready for pickup within 30 minutes 24/7, while others remain in standby mode. The contractor must ensure 100% accuracy in Government Property Transfer Records and provide documented certification for all personnel. Strict adherence to AFOSH safety standards, environmental laws, and operational security protocols regarding controlled unclassified information is mandatory. This effort is identified as an essential service under R-DFARS 237.7602(a).
Other Support Activities for Air Transportation

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 238220
Federal
Post Indicator Valve (PIV) Installation – Building 324The contract requires the installation of a vertical Post Indicator Valve on the north side of Building 324, located in an area with ZIP code 82005. The scope includes excavating and preparing the ground for the valve, connecting it to an underground water line, and ensuring proper backfilling and compaction of the soil. The installation must interface seamlessly with the building’s existing interior fire suppression system to maintain operational integrity and compliance with fire safety standards. All work must be performed in accordance with applicable codes and specifications to ensure long-term reliability and accessibility for maintenance and inspections. The contract is classified as a subcontract under NAICS code 238220, indicating it falls under the plumbing and HVAC contracting sector. It is associated with the Department of Defense through the agency designation FA4613 90 Cons Pk, pointing to a military or federal facility context. The posting date is listed as August 6, 2026, suggesting this is a forward-looking procurement likely tied to infrastructure upgrades or new construction projects. The place of performance is confirmed as 82005, though specific city and state details are not provided, and no point of contact or set-aside details are listed, indicating a standard open bidding process under federal contracting guidelines.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS