Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 8, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Carpet Replacement

Closed
FA9401-14-R-0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

about 23 hours ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
USMC Stair Runner Replacement for Home of the Commandant
Solicitation # M0026427RFI002
The Department of Defense, through the Marine Corps, has issued a sources sought announcement under solicitation M0026427RFI002 to conduct market research for the replacement of the stair runner at the Home of the Commandant in Washington D.C. This project requires a custom, like-for-like replacement for three flights of stairs and associated landings, designed to replicate the existing runner's appearance, color, pattern, and texture to maintain the residence's historic architectural character. The scope of work includes field measurements, the provision of material samples for government approval, fabrication of a professional-quality runner with finished edges, and full installation. The project must be completed by April 16, 2027, with work typically performed Monday through Friday from 7:00 AM to 4:00 PM. This opportunity is designated as a total small business set-aside under NAICS code 238330. Interested vendors must demonstrate experience in custom carpet fabrication and professional installation. Key requirements include the use of protective coverings to safeguard historic woodwork and architectural features, the removal of all contractor-generated debris, and compliance with security and access-control protocols at Marine Barracks Washington. Responses must be submitted to Sergeant Jacob Espinosa by 10:00 AM EST on October 22, 2026, and should include the company name, address, phone number, point of contact, CAGE code, company size status, and ownership nationality.
Commander

POSTED

1 day ago

DEADLINE

in 2 days

General Info

Contract Value

$1,104,662.52

NAICS

238330 - Flooring Contractors

Place of Performance

Kirtland AFB, KIRTLAND AFB, NM, 87117, USA

Set-Aside

HZC

Award Issued Date

Documents

34

B2035L West Day Room SK-A-02

PDF, High priority: read this firstspecifications
High

10._AF_3065_Progress_Report.pdf

PDF

11._DD_FORM_1354.pdf

PDF

12._Waste_Diversion_Report.doc

DOC

13._Waste_Summary_-_01_74_19_Appendix_A.xls

XLS

14.__etl_07_4_AF_Carpet_Standards.pdf

PDF

15._Past_Performance_Information_Form.docx

DOCX

16._CE_Building_from_Truman_Gate.jpg

JPG

17._Truman_Gate.pdf

PDF

18._Wage_Determindation_NM40.pdf

PDF

19._Liquidated_Damages_MHMV021088_and_021089.pdf

PDF

1._SOW-Dorm_Carpet_Rev_2.pdf

PDF

20351-1-GIS.dwg

DWG

20351-2-GIS.dwg

DWG

20351-3-GIS.dwg

DWG

20351_complete.dwg

DWG

20352-1-GIS.dwg

DWG

20352-2-GIS.dwg

DWG

20352-3-GIS.dwg

DWG

20352_complete.dwg

DWG

2._Bldg_20351_Floorplans.pdf

PDF

3._Bldg_20352_Floorplans.pdf

PDF

4._Specifications_Dorm_Carpet.pdf

PDF

5._Asbestos_sample_results_05-23-2014.pdf

PDF

6._Construction_AF_66_Dorm_Carpet.xls

XLS

7._AF3052_Dorm_Carpet_B20351_Bid_Form.xlsx

XLSX

8._AF3052_Dorm_Carpet_B20352_Bid_Form.xlsx

XLSX

9._AF_3064_-_Progress_Schedule.xls

XLS

Addendum_No._1_.pdf

PDF

Aerial_site_plan.pdf

PDF

Bldg_20351_east_day_room.pdf

PDF

FA9401-14-R-0022_Solicitation.pdf

PDF

Site_Visit_Answers.docx

DOCX

Site_Visit_Attendees.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline added: Aug 19, 2014. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9401 377 Msg Pk
Contacts1 person available
OfficeKIRTLAND AFB, NM, 87117-0001, USA
Office AddressKIRTLAND AFB, NM, 87117-0001, USA
Contacts

Full Description

Show more
THE INFORMATION BELOW IS FOR THE PRESOLICITATION ONLY! FOR SOLICITATION SEE ATTACHED REQUEST FOR PROPOSAL FA9401-14-R-0022. General Information Document Type: Pre-Solicitation Notice Solicitation Number: FA9401-14-R-0022 Classification Code: S214 - Carpet Laying and Cleaning Set Aside: Competitive HUBZone Set-Aside NAICS Code: 238330 - Flooring Contractors Contracting Office Address AFNWC/PZIC 8500 GIBSON Blvd SE, Bldg. 20202 Rm. 107 Kirtland AFB, NM 87117 Description The AFNWC/PZIC will be soliciting a HUBZone Set-Aside, Firm Fixed Price Contract to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. This will be limited to HUB-Zone businesses with a bona-fide place of business within the state of New Mexico. Funds are not presently available for this requirement. The Government's obligation under this Pre-Solicitation and follow on Request for Proposals (RFP) is contingent upon the availability of appropriated funds from end of fiscal year funding. No legal liability on the part of the Government for payment of any money shall arise unless, and until, funds are made available to the Contracting Officer for this procurement and award has been made by the Contracting Officer. Work under this project is comprised of replacing carpet and asbestos removal for Dormitories 20351 and 20352 on Kirtland Air Force Base. The Contractor will be responsible for visiting the site and conducting all field investigation that will allow the execution of a complete design. The Contractor shall furnish all services, materials, supplies, equipment, investigation, studies, specifications, drawings, and supervision as required in connection with the Statement of Work (SOW), and all furnished and referenced design instructions. Estimated Period of Performance (POP) for requirement is 143 days. IAW FAR 36.204 (e) the estimated price range for this requirement is between $500,000 and $1,000,000. A Request for Proposal (RFP) is contemplated utilizing lowest price technically acceptable (LPTA) evaluations described in Federal Acquisition Regulation (FAR) 15.1 targeted toward a HUBZone set-a-side with a 30-day response time (offers due 30 days after issuing). The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors: 1) Cost/Price 2) Technical Acceptability 3) Past Performance Within the Past Performance Factor the following sub-factor will be used: a) Filled out Past Performance Information Forms (maximum of 3) Within the Technical Acceptability Factor the following sub-factors will be used: a) Technical Approach Narrative b) Proposed Progress Schedule The Cost/Price factor will be afforded primary emphasis in the evaluation. All other evaluation factors other than Cost/Price, when combined, are approximately equal to cost/price. The solicitation will be available in electronic format only. The RFP will be posted on the website at http://www.fbo.gov/ on or about 18 July 2014 and close on or about 30 calendar days thereafter. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the System for Award Management (SAM) database before award of a government contract; failure to register in the SAM database may cause your firm to be ineligible for award. All inquiries regarding this acquisition shall be submitted in a written format via email to Contract Manager 1Lt Phil Ofili at phillip.ofili.2@us.af.mil (primary point of contact), or Contracting Officer Ms. Debora Scott at debora.scott@us.af.mil. THE INFORMATION ABOVE IS FOR THE PRESOLICITATION ONLY! FOR SOLICITATION SEE ATTACHED REQUEST FOR PROPOSAL FA9401-14-R-0022

More opportunities from Department Of Defense → FA9401 377 Msg Pk

Same awarding agency

NAICS: 541511
Federal
Requesting information for MISHAP ANALYSIS & ANIMATION FACILITY (MAAF) FLIGHT RECORDER DOWNLOAD SOLUTIONS ACQUISITION AND SUSTAINMENT
Solicitation # FA940126Mishap
The Department of the Air Force, specifically the Mishap Analysis and Animation Facility (MAAF), is seeking sources for engineering, acquisition, and sustainment services to develop and maintain hardware and software solutions for aircraft flight recorder download and data decompression. The scope includes creating download capabilities for both undamaged flight recorders and bench-level extracted Circuit Card Assemblies across various solid-state architectures. These solutions must run natively on Red Hat Enterprise Linux or Microsoft Windows and ensure raw data extractions map to OEM-native binary formats for bit-exact transcriptions. The contractor will be responsible for designing and testing standardized interfaces, including chassis, cabling, and drivers, while supporting a wide range of OEMs such as General Electric, Honeywell, and Curtiss-Wright. The contract structure consists of a 12-month base period with four 12-month option periods, with performance occurring at contractor facilities and Kirtland AFB, New Mexico. Key performance standards include maintaining 99 percent operational availability for download stations and providing hardware repairs or driver updates within three business days of notification. Security requirements mandate that all systems operate as stand-alone, air-gapped units with data transferred via physical USB media, and personnel must be cleared to process Controlled Unclassified Information. Under DFARS 252.227-7013/7014, the Government retains unlimited data rights to all software, source code, and technical documentation developed at Government expense. The contractor is also required to independently negotiate Non-Disclosure Agreements with OEMs to obtain proprietary technical data.
Custom Computer Programming Services

POSTED

22 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS