Carquinez Effluent Pump Station Electrical Mitigation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Carquinez Effluent Pump Station Electrical Mitigation Project (PEE010) is a solicitation issued by the Vallejo Flood and Wastewater District in California for electrical system improvements at the District's main treatment plant site. The scope of work primarily involves providing new 5kV and 480V power feeders for four existing effluent pumps and the existing motor control center MCC-EP. The project requires the contractor to furnish all necessary labor, materials, and equipment, including consumables for commissioning and the first 12 months of operation. Performance is measured from the Notice to Proceed, with a timeline of 200 calendar days for substantial completion and 235 calendar days for final completion. The contract will be awarded to the lowest responsive and responsible bidder. All bidders must submit a Part A package including a bid form, schedule, bidder's bond of at least 10 percent of the total bid price, and certifications for non-collusion and workers' compensation. The three lowest bidders are then required to submit a Part B package within five working days of the bid opening, which includes certifications of experience, safety compliance, and drug-free workplace requirements. Awardees must be licensed under the Contractor's License Law of California and comply with California prevailing wage laws. Project administration is managed through a designated Construction Manager, and payments are processed within 30 days via the District's web-based construction management system. Quality assurance is strictly enforced through random weekly inspections and a rigorous acceptance process involving NETA motor testing, thermographic surveys, and final certification by the District General Manager. All electrical work must adhere to ANSI, ASTM, IEEE, and ICEA standards. Contractors are also required to provide faithful performance and labor and materials payment bonds executed by sureties admitted in the State of California.
General Info
Place of Performance
Set-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
28 mandatory28 requirements in 8 areas
- Compliance10 · 10 must003
Insurer Acceptability Standards
- Cost & Pricing4 · 4 must018
Additive Bid Alternate Item A1 Pricing
- Quality Assurance4 · 4 must022
Inspector Authority to Reject Work
- 25 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 28 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- FRSMP277009/JLM-Lighting Phase 2Open now, due in 4 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 6 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS