Cascade Boulevard over Moody Creek Bridge Replacement Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → City of Shasta Lake
NAICS
N/A
Place of Performance
Shasta Lake, CASet-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → City of Shasta Lake
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Shasta Lake
Office AddressN/A
Contacts
Full Description
Show more
WDID 5A45CR00701
The purpose of the Project is to replace the functionally obsolete concrete bridge on Cascade Boulevard over Moody Creek with a new structure that meets current structural and geometric design standards. The new concrete bridge will provide safe, reliable service and enhance safety for vehicular, pedestrian, and bicycle traffic. The structure will be approximately 52 feet long and 40 feet wide, with a 36-foot-wide roadway that includes two 12-foot travel lanes and two 6-foot shoulders/Class II bike lanes. To maintain traffic during construction, Cascade Boulevard will be detoured just west of the existing bridge using a temporary low water crossing constructed on fill material.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
