This Solicitation opportunity from Florida was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Catalina Boulevard Roadway Elevation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves roadway elevation improvements along Catalina Boulevard from Yorkshire Drive to Jollett Court, requiring the roadway to be raised at least 3 feet above the 100-year flood elevation of 27 feet NAVD to enhance flood resilience. The project includes installing guardrails, curb and gutter, curb inlets, and storm pipes to manage stormwater runoff effectively. Due to limited right-of-way, water quality treatment will be achieved through a combined storm sewer and exfiltration system, with storm pipes directing runoff to an upgraded RCP equalizer culvert that replaces the existing 24-inch cross-culvert. To mitigate any potential impacts caused by the construction, the project will create a compensating storage area within city-owned property adjacent to the water body. The solicitation, posted by the City of Deltona in Florida, has a project budget ranging from five to fifteen million dollars, with a response deadline of October 16, 2025.
General Info
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- THERMOMETER, SELF-INDICOpen now, due in 3 days
- TRANSMITTER, LIQUID QUAOpen now, due in 1 day
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The proposed improvements will also include guardrails, curb and gutter, curb inlets, and storm pipes. Given the limited right-of-way, it is envisioned that water quality treatment will be accomplished by a combined proposed storm sewer / exfiltration system. The storm pipes will capture and convey runoff to the existing 24-inch RCP cross-culvert, which will be removed and replaced with an upgraded RCP equalizer culvert. Lastly, any proposed encroachments caused by this project will be offset by creating a compensating storage area within city-owned property adjacent to the impacted water body.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
