CAWP Transmission Main Improvements and Tank D Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The CAWP Transmission Main Improvements and Tank D Replacement Project involves constructing a new 275,000 gallon welded steel tank, installing site electrical systems with a small CMU building, and laying approximately two miles of pipelines in sizes ranging from six to twelve inches, along with two pressure reducing vault stations. The project also requires the demolition of an existing tank and associated roadway reconstruction. Work is funded through the WIFIA program and must comply with American Iron and Steel and Build America, Buy America provisions, ensuring all iron and steel products are domestically produced. The place of performance is in Pioneer, California, with all contract administration, bid submissions, and final acceptance managed by the Amador Water Agency based in Sutter Creek. The solicitation was posted on July 21, 2026, with proposals due by 2:00 p.m. local time on August 18, 2026, and must be submitted either physically to the agency’s office or electronically via their designated portal. The contract is scoped as a construction effort under NAICS code 237110, with no indication of a formal contract type such as Firm Fixed Price or IDIQ, though labor costs are governed by prevailing wage determinations under the Davis-Bacon Act and require weekly certified payroll submissions via WH-347 forms. Compliance with federal labor standards is strictly enforced, including adherence to Equal Employment Opportunity regulations, subcontractor flow-down requirements, and affirmative action recordkeeping for three years post-project. Inspection and acceptance occur onsite, with strict specifications for backfill material, compaction levels of at least 95% per ASTM D-1557, moisture content testing, and prohibitions against jetting for compaction. All materials must be approved by the Agency’s Geotechnical Engineer, and the contractor is responsible for providing access to inspection trenches and maintaining quality records. While no detailed financial breakdown or contract value is provided, payment processing and accounting identifiers such as TAS or ACRN lines are not specified in the documentation. Key points of contact include Lucas Carthew, Ken Hunt, and others from the agency and engineering firms involved, though formal roles like COR or COTR are not explicitly assigned. No packaging, marking, barcoding, or military standards apply, and there are no clauses regarding key personnel, security clearances, or contract options. The solicitation does not indicate any small business set-asides or socioeconomic certifications, and while offerors must certify compliance with AIS,
General Info
Agency
NAICS
Place of Performance
Pioneer, CA, 95666, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → Amador Water Agency
Same awarding agency
