This Solicitation opportunity from Utah was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CDBG 11 King Street Waterline and Infrastructure Improvement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
American Fork City, through its Department of Public Works Engineering Division, is seeking qualified firms to provide engineering design and construction management services for the CDBG 11 King Street Water Line and Infrastructure Improvement Project, RFP WA2025001. The work is centered on King Street from 100 North to 500 East in American Fork, Utah, covering an area of approximately 660 feet. The project is intended to replace aging 80-plus-year-old cast iron and galvanized waterlines, service laterals, isolation valves, and fire hydrants, while also coordinating related corridor improvements to drainage, roadway, streetlights, sidewalks, and ADA deficiencies so the infrastructure is addressed holistically and sustainably. The solicitation was posted on August 6, 2026, and proposals are due August 27, 2026 at 12:00 p.m., with questions due August 20, 2026 at 12:00 p.m. The place of performance is Utah, and the procurement is associated with NAICS code 237110. The selected respondent will be expected to provide full engineering and project support, including geotechnical, survey, and site investigations; preliminary and staged design development at 30%, 60%, 90%, and final levels; construction documents; bidding assistance; and construction management services. Deliverables include utility layouts, profiles, cross-sections, a geotechnical report, bounding and topographic surveys, pavement rehabilitation design, and design for water main, lateral, valve, line stop, and hydrant replacement, along with ADA ramps, sidewalks, curb and gutter, drainage, underground utility conduit, streetlights, and tree removal where needed. The agreement term begins upon execution and continues through completion of design, with the possibility of extending into construction. Compensation is task-order based, with a minimum guarantee of $0 and a maximum of $200,000 in task orders over the term, using a fee schedule and project task orders rather than a detailed line-item pricing table. This is a federally influenced public works procurement funded in part by HUD, federal, and county sources, so compliance requirements are significant. The respondent must meet Section 3, Davis-Bacon and Related Acts, and Build America, Buy America requirements, and must also satisfy Utah E-Verify obligations, including signed certification and verification for subcontractors where applicable. The solicitation treats the response as public records under GRAMA, includes standard terms and conditions, and requires all applicable federal, state, and local licenses to be in place and maintained throughout performance. Professional
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
