Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CDBG Funded Grind and Overlay Project

Closed
9375873State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This project involves a comprehensive street improvement effort funded by the CDBG program in Glendora, California. The scope includes cold-milling the existing pavement to a depth of 2 inches, followed by a 2-inch overlay using asphalt rubber hot mix (ARHM). The work also requires removing and replacing existing curbs, gutters, and sidewalks to ensure proper infrastructure and accessibility. A significant component of the project is constructing ADA-compliant curb ramps and installing truncated domes on specific existing ramps to meet accessibility standards. Additionally, the project involves re-establishing any survey monuments that may be disturbed during construction activities. The contract is estimated to be between $500,000 and $1,500,000, with a solicitation posted on October 24, 2024, and a response deadline set for November 21, 2024. The project is managed by the City of Glendora, California, and is overseen by Desiree Hernandez, who can be contacted via email or phone for further details. The work is to be performed within California, and the project aims to improve roadway conditions and accessibility in accordance with federal and state standards. Interested contractors can find additional information and submit their responses through the designated online portal.

General Info

Agency

California → City of Glendora

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendora
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Glendora
Office AddressN/A
Contacts

Full Description

Show more
This project entails cold-milling 2” grind & overlay with 2” ARHM, removing & replacing curbs, gutters, sidewalks, and constructing ADA-compliant curb ramps per SPPWC. The project also includes installing ADA-compliant curb ramp truncated domes on specific, existing curb ramps. The project also includes re-establishment of disturbed survey monuments.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS