Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Cedar Lake Rec Area Septic System

Active
127A8619R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the construction of a new septic system at the Cedar Lake Recreational Area near Heavener, Oklahoma, under the oversight of the Ouachita National Forest. The contractor is required to supply all labor, equipment, tools, and materials to install septic systems, as well as to modify and rework existing collection and pumping systems to meet specified engineering drawings, relevant specifications, and Oklahoma DEQ regulations. Additionally, the contractor must decommission and remove the current wastewater treatment plant once the new septic system is operational and authorized by the DEQ. The project supports inclusivity by encouraging participation from small, disadvantaged, service-disabled veteran, and women-owned business enterprises. This solicitation is a total small business set-aside under NAICS code 237110, with a small business size standard of $36.5 million. The estimated contract value is between $250,000 and $500,000. Payment and performance bonds are mandatory, although a bid bond is not required. Prospective offerors must be registered in the System for Award Management (SAM) to be eligible. The solicitation was posted in early June 2019, with a pre-bid site visit scheduled for May 21, 2019. All communications are to be submitted in writing to the designated contracting officer. The opportunity is available exclusively through the Federal Business Opportunities portal, and the government emphasizes fair consideration of all qualified small business proposals.

General Info

Construct new septic system, remove old plant, support small disadvantaged businesses, $250K-$500K value.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Cedar Lake Recreation Area, HEAVENER, OK, USA

Set-Aside

SBA

Documents

6

Cedar_Lake_SS_Plans.pdf

PDF

Cedar_Lake_SS_Specs.pdf

PDF

DBWD_OK24.pdf

PDF

Financial_Information.pdf

PDF

PERFORMANCE_RELEVANCY_QUESTIONNAIRE.pdf

PDF

Solicitation_127A8619R0004.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → National Forests In Mississippi
Contacts1 person available
OfficeJACKSON, MS, 39213, USA
Office AddressJACKSON, MS, 39213, USA
Contacts
Jay TobinContracting Officer

Full Description

Show more
The Ouachita National Forest has a requirement to construct a new septic system at the Cedar Lake Recreational Area located southwest of Heavener, Oklahoma. The contractor shall provide all labor, tools, equipment, and materials necessary to install septic systems, and modify / rework collection and pumping systems, in accordance with the drawings, specifications, and Oklahoma Department of Environmental Quality (DEQ) Title 252 Chapter 641. The work also includes the decommissioning and removal of an existing waste water treatment plant after the new septic systems are in service with DEQ approval to operate. The USDA Forest Service encourages the participation of small, disadvantaged, service disabled veteran, and women owned business enterprises. The primary North American Industry Classification System (NAICS) code is 237110 and the small business size standard is $36.5 million. The proposed contract is 100% set-aside for small business concerns. All responsible, qualified small businesses may submit an offer which will be considered by the Forest Service. All Offerors shall be registered at the System for Award Management (www.sam.gov) to be eligible for award. The statement of magnitude for this project is between $250,000 and $500,000. Payment and performance bonds are required. A bid bond is NOT required. The solicitation for this project will be available only through the Federal Business Opportunities website www.fbo.gov. All questions pertaining to this solicitation shall be submitted in writing to Jay Tobin at jay.g.tobin@usda.gov. Responses will not be provided to telephone messages. The anticipated date for issuance of the solicitation is May 13, 2019. The actual due date for proposals will be identified on the solicitation. The Government is planning a pre-bid/pre-proposal site visit, which is tentatively scheduled for May 21, 2019. Time and date will be confirmed in the solicitation. THE SOLICITATION PACKAGE HAS BEEN POSTED The pre-bid site visit will be held at 10:00AM on May 21, 2019; directions are noted at the bottom of page 37 in the solicitation.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Agriculture → National Forests In Mississippi

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS