Centerville Brook AOP Obstructions Design Planning Hyde Park

Active
75140State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.

General Info

Design for Centerville Brook dam removal and culvert improvements to restore aquatic passage.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, USA

Full Description

Show more
Site 1: Centerville Brook Dam Removal In March of 2023, a small parcel located by Centerville Brook Dam was sold to the Town of Hyde Park. In spring of 2023 the Town of Hyde Park met with state and regional partners from the Vermont Department of Environmental Conservation, the Vermont Natural Resources Council, and the Lamoille County Planning Commission to evaluate this site for a potential dam removal and wetland restoration project. In September 2023, the Town of Hyde Park secured funding through the Lamoille Clean Water Service Provider to explore options for Dam Removal and to complete a 30% design. In fall of 2023 the Town of Hyde Park transferred project sponsorship and the awarded grant to the LCPC to manage and provide project coordination support. In spring of 2024, the LCPC, through a competitive bid process, hired Fitzgerald Environmental Associates (FEA) to complete 30% design plans for the Centerville Brook Dam Removal Project. Throughout 2024-2025 LCPC, FEA and the Town of Hyde Park met with state, federal partners, and adjacent landowners to provide input during the preliminary design process. In 2025, Fitzgerald Environmental Associates (FEA) completed a 30% Preliminary Design Report. In winter 2025 the LCPC collaborated with the Town of Hyde Park to apply for an Aquatic Organism Passage Grant through the Lake Champlain Basin Program to complete final design plans for the Centerville Brook Dam Removal Project. This grant scope was expanded to include preliminary design planning for two culverts that are an immediate downstream barrier to aquatic organism passage. In spring of 2026 the LCPC was awarded the AOG Grant through the Lake Champlain Basin Program. In August 2026, the LCPC received an executed agreement with the New England Interstate Water Pollution Control Commission. For Site 1, the project will bring the dam removal from the completed 30% preliminary design to a 100% shovel-ready final design, covering full structural removal, stream channel restoration, sediment management, and relocation of the existing dry hydrant. FEA concluded that full dam removal is the only viable option to restore stream connectivity and eliminate flood risk. Removal will restore the stream channel’s equilibrium, reduce streambank erosion, and restore the stream channel to a natural state. The Dam Removal project will involve removal of approximately 200 cubic yards of impounded sediment and utilize timber grade controls and Beaver Dam Analogs (BDAs) to enhance habitat complexity. The stream reach assessment also documents significant bank erosion (697 feet, 31.6% of reach length) and ice/debris jam potential. These conditions will be addressed through improved sediment transport following dam removal. As dam removal at Site 1 will lower water levels and render the existing dry hydrant unusable, the final design will integrate the hydrant’s relocation from the north side of Centerville Road to a viable downstream location at Brook Road (Site 3). The viability of this location was verified during the preliminary design phase and confirmed by the Hyde Park Fire Chief and Troy Dare with the Rural Fire Protection Program. Sites 2 & 3 Centerville Rd and Brook Rd Culverts To improve aquatic organism passage and consider downstream impacts of the dam removal, the project has been expanded to address three sites along Centerville Brook; Site 1 (Centerville Brook Dam), Site 2 (Centerville Road culvert), and Site 3 (Brook Road culvert). These immediate downstream culverts are perched and act as a barrier to aquatic organism passage. Re-establishing a natural stream channel will enhance flood water capacity and improve water quality. For Sites 2 and 3, the project will complete 30% preliminary designs for two perched town culverts that currently block passage for native brook trout and other aquatic species. The Centerville Road culvert (Site 2) is a steel squash pipe that is in good condition (#1-1-17). The 2010 Centerville Brook Corridor Plan (Bear Creek Environmental) classified this crossing as “No aquatic organism passage (AOP) for all aquatic organisms”. The Brook Road culvert (Site 3) is a concrete box culvert with a perched outlet that blocks aquatic organism passage. (#45-1-2). This preliminary design planning effort will take into consideration the current condition of these culverts and explore AOP retrofits vs. a full culvert replacement.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and land surveying. Additionally, the project requires support for environmental assessments, permitting, hazardous materials surveys, and CPM scheduling. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid through the Building Connected system, with a bid date of September 11, 2026. Eligible bidders include certified Disadvantaged, Minority, Women, and Other Business Enterprises, with certifications required from agencies such as the SBA, MBDA, or the California Unified Certification Program. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the bond premiums. Kiewit, which is signatory to several collective bargaining agreements, requires all bidders to demonstrate an ability to maintain labor harmony on the project. Plans and specifications are available for review at Kiewit's office in Costa Mesa, California.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 19 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer mainline, installing service laterals for properties currently using septic systems, and decommissioning existing residential pump stations. The scope of work includes preliminary engineering data optimization, franchise utility conflict support, full depth and width roadway reconstruction design, and ADA curb ramp and curb design. The project is funded by the Clean Water State Revolving Fund via the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The project is located in southwest Bend, specifically extending from the Cinder Lane and McMullin Drive intersection through Alpine Drive and Lodgepole Drive, terminating at Poplar Street. The City of Bend intends to advertise for construction services in Fall/Winter 2027. Parametrix is actively soliciting firms with federal, tribal, state, local, or independent DBE certifications as part of a good faith effort. The response deadline for this subcontracting opportunity is September 29, 2026. Selection will be based on technical and administrative capabilities, with the City of Bend evaluating proposals and potentially conducting interviews to determine the highest scoring proposer.
Parametrix

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS