Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on March 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Central Bremerton Force Main Replacement

Closed
5890State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Bremerton is soliciting bids for the Central Bremerton Force Main Replacement project, which involves replacing approximately 3,100 feet of damaged 14-inch ductile iron pipe with 18-inch AWWA C905 PVC. The project scope spans Gregory Way, Naval Avenue, and 1st Street, including the installation of a surge chamber near High Avenue and Gregory Way, as well as a bypass pipe and isolation valves at the intersection of Burwell Street and Warren Avenue. Additional requirements include the removal of two large fir trees and the restoration of residential landscaping, concrete structures, and fences along Gregory Way. Surface restoration efforts will involve grinding and repaving 1st Street from Montgomery Avenue to Naval Avenue with hot mix asphalt, alongside the reconstruction of the storm sewer and the installation of ADA compliant access ramps. The estimated project value is between 7 million and 8 million dollars, with a completion timeline of 180 calendar days from the Notice to Proceed. Bids are due by May 7, 2025, and must include a 5 percent bid security and a 100 percent performance bond. Contractors must comply with Washington State and federal Davis-Bacon prevailing wage rates. This solicitation, identified by number 5890, is managed by the City of Bremerton in Washington and falls under NAICS code 237110.

General Info

Bremerton force main replacement project, $7-8 million, 180-day timeline, bids due May 7.

Documents

2
PDF, High priority: read this first3 pages · itb
High
PDF, High priority: read this firstamendment
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 7, 2025 to Apr 28, 2025. NAICS code changed from 561730 to 237110. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bremerton
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The WORK includes but is not limited to the following description. The City of Bremerton will replace a damaged section of the Central Bremerton Force Main along Gregory Way, Naval Avenue, and 1st Street with 18-inch AWWA C905 PVC. The existing pipe is 14-inch ductile iron. The replacement area begins approximately 150 ft east of Gregory Way & High Avenue and extends to 1st Street & Montgomery Avenue, for a total pipe length of approximately 3,100 feet. Key locations include: the high point of the force main near High Avenue and Gregory Way, where an surge chamber will be installed; the intersection of Burwell Street and Warren Avenue, where a bypass pipe and isolation valves will be installed to allow the pipe to be drained; the reach of pipeline in Naval Avenue directly adjacent to the Naval Base Kitsap (NBK) access gate. Two large fir trees (approximately 150 ft tall) will be removed from a residential front yard along Gregory Way. The removal shall be complete, including stumps, trunks, limbs, slash and debris. The homeowner’s landscaping will be removed and protected, then replaced after construction, along with new plants as specified. The removal and reconstruction shall also include concrete stairs, walls, fences walkways, and appurtenance structures. A portion of Gregory way will be impacted and repaired under the contract. As part of surface restoration, 1st Street from Montgomery Avenue to Naval Avenue will be ground and repaved with hot mix asphalt, including the construction of ADA compliant access ramps and reconstruction of the storm sewer.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS