This Solicitation opportunity from Department Of Defense was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CES - MAU Coil
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation W50S8W26RA003 is a 100% small business set-aside under NAICS 236220 for structural modifications and HVAC upgrades at the Building 16 Hangar for the WY Air National Guard in Cheyenne, Wyoming. The project, with an estimated construction magnitude between $100,000 and $250,000, involves demolishing and replacing two structural bracing members, rerouting interfering electrical conduit and mechanical piping, and replacing a degraded hydronic coil for the Makeup Air Unit (MAU). All work must adhere to AWS welding standards and SMACNA casing seal standards, with requirements for independent Non-Destructive Testing (NDT) and Testing and Balancing (TAB) reports. The contract is 100% federally funded and subject to Davis-Bacon prevailing wage rates. Award will be based on the most advantageous offer, considering price, technical acceptability on a pass/fail basis for the five lowest-priced proposals, and a performance confidence assessment of past performance from the last five years. Deliverables include a one-year warranty on workmanship and materials, a safety plan, and a quality control plan. Proposals must be submitted in three parts—Price, Technical, and Past Performance—by September 19, 2026, with invoicing processed through the Wide Area WorkFlow system.
General Info
Place of Performance
Cheyenne, WY, 82009, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project modifies existing structural cross members within the Building 16 hangar to improve clearance and operational support. This modification requires the rerouting of adjacent electrical conduit and mechanical piping. Concurrently, the facility’s MAU hydronic coil, which has reached the end of its service life, will be replaced to ensure continued environmental control and energy efficiency.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
