Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Rhode Island was posted on May 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Chemical Feed and Metering Pump System Integration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333912
New
DIBBS
GUIDE, COMPRESSOR BE
Solicitation # SPE4A7-27-Q-0230
Solicitation SPE4A7-27-Q-0230 is a firm fixed price, small business set-aside procurement issued by the Defense Logistics Agency for 122 units of the Guide, Compressor BE (NSN 2840-00-906-4751). This item is designated as an Air Force Critical Safety Item and must be manufactured in accordance with reference drawings 77445 PWA355 (Revision AC) and 77445 471490 (Revision B). Delivery is required within 365 days after receipt of order, with a specific material need ship date of November 4, 2026, and terms set as FOB Destination. The contract mandates strict adherence to technical and quality standards, including SAE AS9100 and higher-level contract quality requirements. Inspection and acceptance are performed at origin using zero-based sampling plans. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, while marking follows MIL-STD-130. Due to the nature of the technical data, the contract is subject to ITAR and EAR export controls, requiring contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contractor must maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 and utilize the Wide Area WorkFlow (WAWF) system for invoicing and payment. Award will be based on a best-value determination, weighing cost, past performance (via SPRS assessments), and quoted delivery.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 20 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The City of Pawtucket in Rhode Island is seeking a subcontractor for the supply and integration of 16 chemical metering pumps and their associated feed systems. This project is specifically designed to support dosing operations within a potable water treatment facility to ensure water quality and safety standards are met. The solicitation was posted on May 29, 2024, with a response deadline of June 13, 2024. Classified under NAICS code 333912, the contract focuses on the technical integration of specialized pumping equipment necessary for precise chemical distribution in a municipal water environment.

General Info

Pawtucket seeks a subcontractor for 16 chemical metering pumps for water treatment facility.

Documents

This scope was carved out of 24-025.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

24-025A4 Addendum No. 4 to 24-025

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vaneaxial Fan Manufacturer/SupplierOpen now, due in 11 days
  • GUIDE, COMPRESSOR BEOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyRhode Island → City of Pawtucket
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and integration of 16 chemical metering pumps and associated feed systems for potable water treatment dosing.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS