Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cherry Avenue Sewer Improvement Project

Closed
WD-06-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Cherry Avenue Sewer Improvement Project (WD-06-26) is a solicitation by the Long Beach Public Utilities Department for the installation of approximately 3,100 linear feet of new vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line. The project aims to increase sewer pipeline capacity across three alignments located along Cherry Avenue, Anaheim Street, and Gardenia Avenue in Long Beach, California. Key deliverables include the installation of 12 new 48-inch sewer maintenance holes and one 60-inch drop sewer maintenance hole, connection to existing LBUD manholes, and the removal or abandonment of existing lines. The scope of work further encompasses dewatering, sewer flow bypassing, trenching, backfilling, compacting, pavement removal and replacement, and post-construction video inspection. Bids for the project are due by 2:00 PM on October 14, 2026, via the Long Beach Buys portal. The contract requires the selected contractor to perform at least 50 percent of the work with its own forces and mandates registration with the Department of Industrial Relations per Labor Code section 1725.5. Financial requirements include a Bond for Faithful Performance and a Labor and Material Bond, each totaling 100 percent of the contract price. The project includes a 300,000 dollar field order allowance and requires the contractor to name DRP Engineering, Inc., the Design Engineer, as an additional insured. Performance begins within 10 days of a written Notice to Proceed, with monthly payment requests submitted in AIA format.

General Info

Long Beach sewer pipeline installation project; bids due October 14, 2026 via portal.

Documents

3
PDF, High priority: read this first22 pages · specifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first11 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach Public Utilities Department
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Bid #WD-06-26: The Work consists of the installation of around 3,100 linear feet of new vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line along with 12 new 48-inch sewer maintenance holes and 1 new 60-inch drop sewer maintenance hole. The new sewer line will be connected to existing LBUD manholes. The Work also consists of remove and replace or abandoning of existing sewer lines along with several existing manholes. Also included are dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling and compacting.

More opportunities from California → Long Beach Public Utilities Department

Same awarding agency

NAICS: 423840
SLED
Request For Quotation For Hoses And Fittings
Solicitation # UD-27-368
The Long Beach Public Utilities Department (LBPUD) is soliciting quotations under solicitation number UD-27-368 for the provision of high-pressure hydraulic hoses and fittings on an as-needed basis. The scope of supply includes valves, air and water hoses, clamps, couplings, plugs, and various pressure gauges. The contract features an initial twelve-month term with options for two one-year extensions. Award decisions will be based on unit prices, percentage discounts, and compliance with specifications, with the potential for a 10 percent bid price reduction for qualified local Long Beach businesses. Bidders must provide firm pricing for the initial term, and any quotes specifying minimum order requirements will be rejected. Deliveries must be completed within five business days of a purchase order and delivered FOB Destination to the Gas or Water Warehouses in Long Beach. The contractor may be required to provide 24-hour emergency service and submit product samples within five business days upon request. Compliance with CAL/OSHA, federal hazardous materials laws, and environmentally preferable product guidelines is mandatory. Awarded contractors must maintain comprehensive general liability insurance of 1 million dollars per occurrence, automobile liability of 500,000 dollars, and workers compensation as required by the California Labor Code. All bids must be submitted electronically via the Long Beach Buys portal by November 23, 2026.
Industrial Supplies Merchant Wholesalers

POSTED

7 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS