Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CHESNUT ASR & MAR SURFACE FACILITIES - ENGINEERING DESIGN, PERMTTING AND CONSTRUCTION OVERSIGHT

Closed
26-0282-RFQ-CCNAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves engineering design, permitting, and construction oversight for the Chesnut Aquifer Storage and Recovery (ASR) and Managed Aquifer Recharge (MAR) surface facilities in Pinellas County, Florida. The project addresses significant water supply challenges in the North Central Regional Water System (NCRWS), where demand periodically exceeds supply by as much as 12 million gallons per day. The county anticipates growing water demands without sufficient increases in supply from the William E. Dunn Water Reclamation Facility (WEDWRF), with excess treated water sometimes discharged to off-site storage systems. To mitigate this, the county has advanced a 30% Basis of Design Report by JonesEdmunds, reviewed by RESPEC as part of a now-terminated funding agreement with the Southwest Florida Water Management District. The final permit to construct and test a Class V Group 2 MAR well at the Chesnut site has been secured, with construction scheduled to start in 2026 and continue into 2027. Procurement for this contract is managed by the Pinellas County Utilities Office, with a solicitation open from February 12, 2026, to March 12, 2026. The procurement process includes a non-competitive procurement justification and a prior Notice of Intent to Sole Source, indicating specialized expertise required for this technical project. The contract’s oversight will ensure compliance with design, permitting, and construction standards to successfully implement surface facilities supporting the MAR well. Key contacts for the project include a hydrogeologist and a lead procurement analyst, highlighting the technical and administrative integration essential for managing this critical regional water infrastructure expansion.

General Info

Engineering design, permitting, and oversight for Chesnut ASR and MAR facilities in Pinellas County, Florida.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

28

26-0282-RFQ-CCNA Chesnut ASR-MAR Surface Facilities Engineering Design Permitting and Construction Oversight

PDF, High priority: read this firstrfq
High

26-0282-RFQ-CCNA Chesnut ASR-MAR Surface Facilities Engineering Design Permitting and Construction Oversight

PDF, High priority: read this first35 pages · rfq
High

Pinellas County RFQ 26-0282- RFQ- CCNA Professional Services Agreement

PDF, High priority: read this first19 pages · contract-document
High

SWFWMD Chesnut Park Surface Facilities Third Party Review Basis of Design Report

PDF, High priority: read this first26 pages · third-party-review
High

Wetland Delineation Inspection Report for John Chestnut Park - Lake Tarpon

PDF, High priority: read this first5 pages · wetland-delineation-report
High

Certificate of Analysis for Lk Tarpon Background Sample 2000537

PDF, Low priority4 pages · certificate-of-analysis
Low

Certificate of Analysis Report ID 956110 for Lake Tarpon Background

PDF, Low priority33 pages · certificate-of-analysis
Low

Chesnut Park Environmental Assessment Technical Memorandum 2023

PDF, Low priority7 pages · technical-memorandum
Low

Lake Tarpon Aquifer Storage and Recovery System Construction Permit 231277-005-UC/5SR

PDF, Low priority22 pages · permit-notice
Low

Lake Tarpon Aquifer Storage and Recovery System Construction Permit 231277-005-UC/5SR

PDF, Low priority22 pages · permit-notice
Low

Lake Tarpon Drainage Basin Management Plan Update 2006

PDF, Low priority27 pages · management-plan
Low

Lake Tarpon Drainage Basin Management Plan Update 2006

PDF, Low priority27 pages · report
Low

Lk_Tarpon_Background_31720_AEL.pdf

PDF, Low priority33 pages · other
Low

Lk Tarpon Background Water Analysis Certificate 31720 PCU

PDF, Low priority4 pages · certificate-of-analysis
Low

Lk Tarpon Background Water Analysis Certificate 31720 PCU

PDF, Low priority4 pages · certificate-of-analysis
Low

Non-Competitive Oversight Committee Justification Form

DOCX, Low priority1 page · justification-and-authorization
Low

Notice of Intent to Sole Source - Pinellas County

PDF, Low priority1 page · sources-sought
Low

Permit Notice and Construction Permit for Lake Tarpon MAR-1 Injection Well System

PDF, Low priority28 pages · permit-notice
Low

Permit Notice and Construction Permit for Lake Tarpon MAR Injection Well System

PDF, Low priority28 pages · permit-notice
Low

SWFWMD Chesnut Park TPR Final Report 2024-11-26

PDF, Low priority26 pages · other
Low

Technical Memorandum Chesnut Park Wetland and Wildlife Assessment

PDF, Low priority7 pages · technical-memorandum
Low

Topographic Survey

PDF, Low priority5 pages · other
Low

Topo_survey_2022

PDF, Low priority5 pages · other
Low

Wetland Delineation Inspection Report - John Chestnut Park Lake Tarpon

PDF, Low priority5 pages · wetland-delineation-report
Low

Workorder T2005449 Lake Tarpon Background Analytical Report

PDF, Low priority33 pages · contract-document
Low

Lk_Tarpon_Background_31720_KNL_-_Copy.pdf

PDF

Lk_Tarpon_Background_31720_KNL.pdf

PDF

Lk_Tarpon_Background_31720_KNL.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → UTILITIES
Contacts2 people available
OfficeClearwater, FL, 33765, USA
Organization / AgencyFlorida → UTILITIES
Office AddressClearwater, FL, 33765, USA
Contacts
Dan UmbergerHydrogeologist
Pamela UlrichLead Procurement Analyst

Interested Companies (15)

StantecAtlanta, GA
Southeastern Surveying and MappingOrlando, FL

See All 15 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Demands in the NCRWS periodically exceed the available supply by as much as 12 million gallons per day (MGD) and at times the supply from the William E. Dunn Water Reclamation Facility (WEDWRF) exceeds the demands in the system, resulting in discharges to off-site lake storage systems. Demands are expected to increase over the next several years without a significant increase in supply from the WEDWRF. The COUNTY has a 30% Basis of Design Report which was completed by JonesEdmunds, and it has undergone a third-party review by RESPEC as a requirement of a SWFWMD Co-Funding Agreement, which the COUNTY has recently exited based on several considerations. The COUNTY has also received the final permit to construct and test a Class V Group 2 Managed Aquifer Recharge (MAR-1) well at the Chesnut site. An Invitation to Bid was published and the COUNTY has selected a water well driller to begin construction in 2026 . Of note, construction of the MAR well will be ongoing during the beginning stages of this project and should completed in 2027.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS