Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Chester Public Utility District Wastewater Collection System Project is a forecast initiative located in Chester, California, designed to modernize the wastewater infrastructure serving approximately 2,187 residents. The primary objective is to replace aging and undersized sewer lines and reduce infiltration and inflow within the collection system. The scope of work includes replacing and upsizing sewer mains and laterals, potentially utilizing cured-in-place liners for rehabilitation. Additionally, the project involves upgrading four existing lift stations by replacing pumps, motors, and electrical components, and installing new emergency backup generators and supervisory control and data acquisition equipment. The District is evaluating two options for managing the siphon under the North Fork of the Feather River. One option involves abandoning the existing siphon in favor of a new lift station and force main attached to the 1st Avenue bridge, which would include a new pump structure, SCADA antenna, and extended electrical conduit from Melissa Avenue to avoid in-water work. Alternatively, the District may choose to install a cured-in-place liner within the existing siphon. This project has been issued a Notice of Exemption under CEQA, as it is determined that the work will not result in significant environmental effects.

General Info

Modernize Chester California wastewater infrastructure by replacing sewer lines and upgrading lift stations.

Agency

California → Chester Public Utility District

Place of Performance

Highway 36/Main St, CA, 96020

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Chester Public Utility District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Chester Public Utility District
Office AddressN/A
Contacts
Bonnie MullaneyGeneral Manager
Kelley CoteAdministrative Assistant

Full Description

Show more
The Chester Public Utility District (CPUD or District) provides drinking water service and wastewater collection, treatment, and disposal services to the unincorporated community of Chester in Plumas County, California. The District currently serves approximately 2,187 residents with 1,255 wastewater connections. The District treats the community’s collected wastewater at the existing Wastewater Treatment Plant, a facultative lagoon facility constructed in 1981. The purpose of the project is to replace aging and undersized sewer lines and reduce infiltration and inflow into the collection system. The project includes replacing and upsizing existing sewer mains and laterals. If possible, the District will install cured-in-place (CIPP) liners to rehabilitate the existing sewer mains. In addition, improvements to each of the four lift stations will be made. Existing pumps, motors, and electrical components would be replaced, and new supervisory control and data acquisition (SCADA) system equipment and a new emergency backup generator would be installed adjacent to each lift station. The District is also considering abandoning the existing siphon that runs under the North Fork of the Feather River and constructing a new lift station and force main to convey the sewage from the siphon; the new force main would be attached to the 1st Avenue bridge over the river and tie into an existing force main on 1st Avenue. Therefore, no in-water work would be required. Improvements associated with the new lift station include construction of a small structure to house pumps, motors, and electrical and SCADA system equipment, and installation of a new emergency backup generator adjacent to the structure. An antenna for the SCADA system would be mounted on the new lift station structure. Additionally, subsurface electrical conduit would be extended to the new lift station from an existing line in Melissa Avenue. Alternatively, a CIPP liner would be installed in the existing siphon in lieu of constructing a new lift station and force main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is designated as a small business set-aside. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Performance is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. The project timeline begins upon a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion dates. Payments are processed monthly via applications for payment submitted to the Engineer, with a 30-day payment term following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additionally, the project encompasses the rehabilitation of reactor mixers and aerators, motor control center component replacement, modifications to sluice and slide gates, and various electrical and instrumentation improvements. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and FRP reinforcing systems. Any exceptions to the standard Garney Purchase Order and Subcontract documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS