Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Chisholm Coastal Development Permit B37551C

Forecast
B37551CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Del Norte County

Place of Performance

Shoreline Drive, Crescent City, CA, 95567

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Del Norte County
Contacts2 people available
OfficeN/A

Full Description

Show more
Brent and Cheryl Chisholm have submitted a coastal development permit application to construct a single-family residence on an undeveloped 0.64 acre parcel located at 425 Shoreline Drive, Smith River (APN 101-170-003). The parcel is located within the California Coastal Zone and within the appeals jurisdiction of the California Coastal Commission. The parcel would be served by public water provided by the Smith River Community Services District and an on-site sewage disposal system. Access to the parcel is from Shoreline Drive, just off U.S. Highway 101. The proposed development is a 4-bedroom, single-story home that is approximately 2,700 sq. ft. in size, with an attached garage of approximately 850 sq. ft. The residence is 17 feet 11 inches in height.The subject parcel is lot 3 of the “The Beach at Smith River” subdivision, formerly known as the Twin Rocks subdivision (MJ8903C), the final map for was filed on June 30, 1994, in Book 12 of Maps, Pages 1 through 4. The parcel has a zoning designation of R-1 One-Family Residence District with a 20,000 square foot minimum lot size and a density combining district overlay (R1-B20-D), and a General Plan Land Use designation of Rural Residential – 1 dwelling unit p

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 14 hours ago

DEADLINE

in 25 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS