The City of Burbank is seeking a contractor for the construction of new Chloramine Boosting Systems at Reservoirs 1, 4, and 5. This project involves the demolition and removal of existing trees, piping, and equipment to make way for site grading and the construction of a new retaining wall and CMU building. The facility will house an on-site hypochlorite generation system, chemical storage tanks, metering pump skids, total chlorine residual analyzers, and a sample water recovery system. The scope of work further includes the installation of double-contained chemical feed piping and tubing, new sample pumps and mixers within the reservoirs, electrical equipment, a safety shower, and water service piping, concluding with programming, startup testing, and commissioning. Managed by Burbank Water and Power, the project is located in Burbank, California, and is categorized as a forecast. According to the CEQA Notice of Exemption, the project is considered categorically exempt as it consists of minor improvements to existing facilities without expanding capacity or the service area. Primary coordination for the project is handled through the Assistant Community Development Director for the City of Burbank.

General Info

Burbank seeks a contractor to build Chloramine Boosting Systems at three city reservoirs.

Agency

California → City of Burbank

Place of Performance

Sunset Canyon Drive and Magnolia Boulevard, Burbank, CA, 91502

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Burbank
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Burbank
Office AddressN/A
Contacts
Fred RamirezAssistant Community Development Director

Full Description

Show more
Construction of the new Chloramine Boosting System at Reservoirs 1, 4, and 5 includes the demolition and removal of portions of existing trees, piping, and equipment at each reservoir site; site grading and construction of a new retaining wall and CMU building to house the chloramine boosting system, including the on-site hypochlorite generation system (OSHG), chemical storage tanks, chemical metering pump skids, total chlorine residual analyzers, and the sample water recovery system; installation of double-contained chemical feed piping and tubing, both underground and aboveground, connecting to new sample pumps and mixers installed within the reservoirs; installation of electrical equipment and associated appurtenances; programming, startup testing, and commissioning of the facility; and installation of a safety shower and water service piping.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is designated as a small business set-aside. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Performance is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. The project timeline begins upon a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion dates. Payments are processed monthly via applications for payment submitted to the Engineer, with a 30-day payment term following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additionally, the project encompasses the rehabilitation of reactor mixers and aerators, motor control center component replacement, modifications to sluice and slide gates, and various electrical and instrumentation improvements. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and FRP reinforcing systems. Any exceptions to the standard Garney Purchase Order and Subcontract documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS