Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CHP-Mold Remediation and Flooring Replacement-Rancho Cucamonga

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Highway Patrol is preparing to execute a mold remediation and flooring replacement project in Rancho Cucamonga, California, aimed at addressing water damage and mold growth on the concrete slab and adjacent construction areas. The project involves the complete removal and replacement of all carpet tile, vinyl composition tile, and rubber wall base with equivalent materials to ensure a clean, safe environment. In addition to indoor remediation, preventative measures are being implemented outdoors to reduce future flooding risks, including regrading and replanting of planter boxes to redirect water away from the building structure. The existing irrigation system, including the controller, valves, and drip lines, will be replaced to support new landscaping, and planter drainage will be reconfigured to channel water toward existing pathways, minimizing moisture accumulation near the facility. The effort is designed not only to correct current damage but also to proactively mitigate conditions that could lead to recurrent mold issues.

General Info

Mold remediation and flooring replacement with outdoor regrading and irrigation upgrades to prevent future water damage.

Agency

California Highway Patrol

Place of Performance

Rancho Cucamonga, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Highway Patrol
Contacts2 people available
OfficeN/A
Organization / Agency
California Highway Patrol
Office AddressN/A
Contacts
Dana ElliotAssociate Architect

Full Description

Show more
To remediate mold, the proposed project will perform mold and water damage abatement/treatment of the concrete slab and adjacent construction. This includes removal and replacement of all carpet tile and vinyl composition tile and rubber wall base with in-kind materials. As a preventative measure to prevent future occurrence of flooding, the project also includes regrading and replanting of outdoor planter boxes to shed water away from the building. Existing irrigation controller, valves, and drip lines will be replaced to establish new landscaping. Planter drainage will also be modified to direct water towards existing pathways.

Similar Contracts

Same NAICS industry code

NAICS: 238330
New
SLED
DHS IFB AMHC AFC Carpet Removal and Epoxy Flooring Install
Solicitation # B-54827
The Illinois Department of Human Services is soliciting bids for the removal of approximately 16,230 square feet of existing carpet and the installation of a high-performance, two-part epoxy flooring system at the Alton Forensic Center. The scope of work includes off-site disposal of old materials, concrete substrate preparation to a minimum 120-grit profile, and the installation of a 4-to-6 inch integral cove base to ensure infection-control compliance. The resulting surface must be smooth, seamless, non-porous, and meet healthcare standards for hygiene, chemical resistance, and heavy-traffic durability. Work is to be performed Monday through Friday, from 7:00 AM to 4:30 PM, and will proceed in modules with approximately one week between units. The contract will be awarded to the responsive and responsible bidder offering the lowest overall total price. Bidders must submit their quotes electronically via the BidBuy portal by December 1, 2026, including required attachments such as the IPG Active Registered Vendor Disclosure, an Offer to the State of Illinois, and a BEP Utilization Plan. Key requirements include maintaining general commercial liability insurance of $2,000,000 aggregate, auto liability of $1,000,000, and a performance bond for quotes exceeding $150,000. Additionally, the contractor must comply with the State Prompt Payment Act, prevailing wage laws, and HIPAA regulations where applicable. Final acceptance of the project is contingent upon a walkthrough and approval by the Chief Engineer, Safety Team, CEO, and COO.
MENTHLTH444 - Mental Health

POSTED

about 21 hours ago

DEADLINE

in 20 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS