Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on December 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Church Road Elevated Water Storage Tank Rehabilitation

Closed
25-221State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Aurora, Illinois, is seeking a qualified contractor for the rehabilitation of the Church Road Elevated Water Storage Tank, a 1.5 million gallon fluted column structure. The project requires providing all necessary labor, machinery, tools, materials, equipment, bonds, and insurance to complete the work. Key tasks include cleaning, sandblasting, and power tool cleaning with appropriate handling and disposal of blast residues, repairing and modifying steel components, and coordinating with Corrpro to install any needed cathodic protection system components. Additionally, the contractor must paint both the interior and exterior of the tank, conduct disinfection and water sampling to ensure safe return to service, and ensure proper containment and cleanup of blast and paint residues. The solicitation, issued by the Water Production agency under the Illinois government, was posted on December 19, 2025, and has a response deadline of January 21, 2026. The project location is Aurora, IL, and the contract is managed by the Manager of Water Systems Engineering, Richard Munson, with the Purchasing Division also serving as a point of contact. The scope includes stringent environmental and safety measures, ensuring that all phases of the tank rehabilitation meet regulatory standards and safeguard the water supply.

General Info

Rehabilitate Aurora’s 1.5 million gallon Church Road water tank with cleaning, repairs, painting, and testing.

Documents

6
PDF, High priority: read this first24 pages · rfb
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this first80 pages · contract-document
High
PDF, High priority: read this first257 pages · project-manual
High
PDF, High priority: read this first4 pages · proposal-form
High
PDF, High priority: read this first17 pages · supplementary-conditions
High

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Water Production
Contacts2 people available
OfficeAurora, IL, 60502, USA

Interested Companies (15)

ConstructConnectCincinnati, OH
Data BidNewtown, PA
Direct SuretyFoster City, California

See All 15 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The City of Aurora, IL is seeking a qualified contractor to rehabilitate the Church Road Elevated Water Storage Tank. The work consists of furnishing all labor, machinery, tools, rigging, brushes, material, equipment, bonds and insurance necessary to improve and rehabilitate the Church Road Elevated Water Storage Tank. The work includes cleaning, sandblasting, power tool cleaning, including proper handling and disposal of spent blast residue and other material, performing repairs and modifications to steel components, coordinating with Corrpro and installing any required cathodic protection system components, and painting the interior and exterior of a 1,500,000 gallon fluted column elevated water storage tank. The work also includes disinfection and sampling as required to place the elevated tank back in service, as well as proper containment of blast and paint residue and clean-up of the site.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS