Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CI 5514 Emergency Water Interconnect at Rolling Oaks Drive

Closed
CI 5514State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 19 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators and the installation of new slide gates. Electrical and instrumentation work includes the replacement of motor control center components and general system improvements. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, lead abatement, metals fabrication, painting, coatings, trucking, hauling, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, at 2:00 PM PT, ahead of the final bid date on November 18, 2026. Any exceptions to the standard purchase order and subcontract forms must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The contract pertains to the development of an emergency water interconnection between the City of California's water system and CalAm at Rolling Oaks Drive, as identified in the City’s Water Master Plan. This project aims to enhance the stability and reliability of the water network by establishing a critical interconnection that will facilitate emergency water sharing and improve overall system resilience. The contract is managed by the Public Works - CIP department and is designated for projects with a budget ranging from $500,000 to $1,500,000. The solicitation was posted on June 20, 2025, with a response deadline of July 23, 2025, and is open to qualified contractors. The primary point of contact for this project is Ayda Forouzan, who can be reached via email or phone for further inquiries. Additional project details and updates are accessible through the provided online portal.

Documents

4

CI 5514 Emergency Water Interconnect at Rolling Oaks Drive

PDF, High priority: read this firstrfp
High

CI 5514 Emergency Water Interconnect at Rolling Oaks Drive RFP/Q

PDF, High priority: read this firstrfp
High

City of Thousand Oaks - Professional Services Agreement (CI 5514)

PDF, Low prioritycontract-document
Low

CI_5514_-_Location_Map.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works - CIP
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City’s Water Master Plan has identified essential emergency water interconnections between the City water and other water providers within the city. The purpose of emergency water interconnection is to create improved stability and a higher level of reliability to the water network system. This project will provide for interconnection of the City’s and CalAm’s water systems at Rolling Oaks Drive (Attachment A).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS