Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CIDH Piling Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for CIDH Piling Installation involves the installation of Cast-in-Drilled-Hole concrete piles for prime contractors on California Department of Transportation infrastructure projects in West Sacramento. The scope of work includes excavation operations, the placement of assembled reinforcing cages, and concrete placement utilizing specialized drill rigs to deliver completed CIDH concrete piles. Interested parties must submit detailed experience qualifications and test boring logs at least 15 days before the start of work. The solicitation was posted on October 14, 2026, with a response deadline of November 18, 2026. This project falls under NAICS code 238110.

General Info

Subcontract for CIDH piling installation on Caltrans projects in West Sacramento, California.

Place of Performance

West Sacramento, CA, 95605, USA

Set-Aside

NONE

Documents

This scope was carved out of 10-1M4804.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cold plane, HMA, curb ramp, culvert, and modify electrical system.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs Cast-in-Drilled-Hole (CIDH) concrete piles for prime contractors on Caltrans infrastructure projects. Performs excavation operations, placement of assembled reinforcing cages, and concrete placement using specialized drill rigs. Requires submission of detailed experience qualifications and test boring logs 15 days prior to start. Delivers installed CIDH concrete piles.

Similar Contracts

Same NAICS industry code

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
SLED
Construction On State Highway In Alameda County In Berkeley And Albany From Heinz Avenue To 0.1 Mile South Of Contra Costa County Line
Solicitation # 04-2Y3014
Solicitation 04-2Y3014 is a construction project issued by the California Department of Transportation for work on State Highway 123 in Alameda County, specifically within Berkeley and Albany from Heinz Avenue to 0.1 mile south of the Contra Costa County Line. With an estimated value of 22 million dollars, the project scope encompasses comprehensive infrastructure improvements including the construction of sidewalks, curb ramps, asphalt and concrete pavement, and the installation of electrical and drainage systems. Additional requirements include earthwork involving barium contaminated soil, landscape planting, erosion control, and the installation of site furnishings such as bus shelters, bike racks, and trash receptacles. The project also necessitates a robust traffic control system, temporary barrier systems, and the implementation of a Lead Compliance Plan and a Stormwater Pollution Prevention Plan. Bids must be submitted on a unit price basis by December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates compliance with Buy America standards, prevailing wage rates, and specific environmental product declarations for asphalt and concrete. Performance requires a Level 2 Critical Path Method schedule and the designation of a certified on-site safety representative. Contractors must coordinate with various utility owners including PG&E, AT&T, Comcast, and EBMUD, and obtain necessary encroachment permits from the cities of Berkeley and Albany. Job site activities are expected to commence within 55 days of contract approval by the Attorney General.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS