Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

CIPP Liner Furnish and Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 27-0039-ITB-C.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 13 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → PUBLIC WORKS
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → PUBLIC WORKS
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs rehabilitation of stormwater culverts (12" to 84" diameter) for prime contractors on Pinellas County Public Works projects. Conducts pre-installation CCTV inspections, performs liner insertion and curing per ASTM F-1216, manages wet-out procedures, and installs hydrophilic end seals. Requires manufacturer-approved installer certification. Delivers a cured, seamless pipe liner with a minimum 50-year design life.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Florida → PUBLIC WORKS

Same awarding agency

NAICS: 237110
New
SLED
FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract
Solicitation # 27-0039-ITB-C
The FY27-FY29 Stormwater Cured-In-Place Pipelining (CIPP) Rehabilitation Work Order Contract is a construction solicitation issued by the Pinellas County Public Works agency. The project focuses on the cost-effective rehabilitation of the county's extensive stormwater network, which includes approximately 43 miles of corrugated metal pipes and 550 miles of reinforced concrete pipes. The scope of work involves CIPP rehabilitation to avoid open-cut methods, with a requirement that the CIPP liners have a minimum design life of 50 years and conform to ASTM standards. The contract is awarded to the lowest responsive and responsible bidder, with mandatory requirements for E-Verify compliance and registration with the Florida Division of Corporations. The contract has a primary duration of 12 months from the date of award, with the possibility of two additional 12-month extensions. Work must commence within 15 calendar days of the notice to proceed and be fully completed within 1,095 calendar days. Performance and payment bonds of 100% of the contract amount are required, along with a bid bond of at least 10% above the bid price. The project includes a 5% SBE participation goal for subcontractors. Administrative requirements include the submission of three notarized original copies of monthly payment applications and a pre-approved Schedule of Values. All submittals must be uploaded via the OpenGov procurement portal in PDF format.
Water and Sewer Line and Related Structures Construction

POSTED

about 18 hours ago

DEADLINE

in 12 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS