Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CIRCUIT BREAKER

Closed
SPE7M1-26-U-4762Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335313
New
SLED
JD Cope / DC UPS System
Solicitation # PE-75553-NONST-2027-000000066
Dalton Utilities is soliciting bids for the engineering, manufacture, testing, documentation, delivery, and field services of a complete DC/UPS system for the J.D. Cope Energy Facility in Georgia. The scope of work includes the design and fabrication of a 125 VDC station battery with racks and spill containment, a NERC PRC-005-06 compliant battery monitoring system, redundant paralleling battery chargers, an inverter with a static transfer switch, a manual bypass switch, and an isolation transformer/voltage regulator. Additionally, the project requires a 125 VDC nominal switchboard and various 120VAC and 125 VDC panelboards. The system must adhere to IEEE 450, OSHA, and International Building Code standards. The contract is a Delivered Duty Paid (DDP) agreement with the point of delivery located at 1232 V.D. Parrot Jr Pkwy, Dalton, GA. Bids must be submitted to David Keaton by the deadline of November 11, 2026. Selected suppliers will be responsible for providing a detailed manufacturing and delivery schedule, as well as comprehensive equipment data books and submittals via the Hexagon SDx system. Quality assurance involves a mandatory Inspection and Test Plan, with the possibility of source inspection shop visits by the Engineer. Final acceptance is contingent upon successful post-installation acceptance testing. All submittals must be provided in native Adobe PDF format, and scanned documents are not acceptable.
Dalton Utilities

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 335313
New
SLED
JD Cope / 480V Low Voltage Motor Control Centers
Solicitation # 5.5330
Dalton Utilities is soliciting firm bids for the engineering, manufacture, testing, documentation, delivery, and field services for seven indoor 480V motor control centers to be installed at the J.D. Cope Energy Facility in Georgia. The project is part of a new electrical power generation plant utilizing three 18.522MW reciprocating engines. The selected supplier must design, fabricate, and deliver the equipment DDP to the point of delivery in Chatsworth, Georgia. All equipment must comply with UL 845, NEMA ICS 1, ICS 2, and NEMA 1 standards, as well as the National Electric Code, OSHA, and International Building Code. Additionally, materials cannot be procured from China or India, and designs must have a proven domestic service history of at least three years. The contract requires comprehensive documentation, including submittals via the Hexagon SDx project website and the provision of spare parts, tools, and consumables for the first two years of operation. Quality assurance involves potential source inspections at the supplier's facility, with a five-day notice required for hold or witness points. Delivery schedules must be agreed upon within 30 days of the effective date, with specific notification timelines for shipping plans and material lists. Bids must be submitted electronically to David Keaton by the deadline of November 11, 2026.
Dalton Utilities

POSTED

about 13 hours ago

DEADLINE

in 14 days
NAICS: 335313
New
DIBBS
FUSE BOX
Solicitation # SPE7M2-27-T-0421
Solicitation SPE7M2-27-T-0421 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of fuse boxes, identified as critical application items. The requirement consists of multiple line items, including 6 units of NSN 5920001781606 and 22 units of the same material, with a total quantity of 28 units. The items must be manufactured in accordance with TDP Rev A Gen 1 and specifications MIL-DTL-24646/1C(1) and MIL-DTL-24646C(1) SUP 1. A First Article Test (FAT) requirement is mandatory for one unit, and the contractor must provide written notice to the Contracting Officer and Quality Assurance Representative at least 14 calendar days prior to shipment for this testing. Delivery is set for 272 days after award, with required ship dates in April 2027 and final delivery dates in July 2027. Shipments are directed to DLA Distribution centers in Bremerton, Washington, and Tracy, California, with FOB and inspection/acceptance points set at the origin. Packaging and marking must strictly adhere to MIL-STD-2073-1E, MIL-STD-129, and RP001, with a strict prohibition on the use of mercury or mercury compounds in preservation and packaging. The contract incorporates various FAR and DFARS clauses, including the Buy American Act, NIST SP 800-171 assessment requirements, and a price evaluation preference for HUBZone small business concerns.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 17 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract under solicitation SPE7M1-26-U-4762 is a Simplified Indefinite-Delivery Contract (IDC) for the procurement of 58 circuit breakers, identified by NSN 5925-20-000-9867 and part number 841-01B-PPL, issued by the Defense Logistics Agency under a Total Small Business Set-Aside. The item is priced at $58.00 per unit, with an estimated total value of $3,364, though this is non-binding and subject to fulfillment via delivery orders, with a guaranteed minimum of eight units and a contract ceiling of $350,000. Delivery is required within 113 days from the solicitation issue date, FOB Origin, with no variance allowed in quantity. Packaging and marking must strictly comply with MIL-STD-2073-1E and MIL-STD-129, including 2D Data Matrix barcoding, and palletization must meet DLA’s RP001 standards. The item is classified as a critical application, and mercury or mercury-containing compounds are prohibited unless functionally necessary in batteries, fluorescent lamps, sensors, controls, weapon systems, or NAVSEA-specified reagents; when present, such items must be shock-proof with a secondary containment system per NAVSEA 5100-003D. Inspection and acceptance occur at destination, with government personnel responsible for evaluation. Cybersecurity requirements mandate compliance with NIST SP 800-171 and reporting of cyber incidents under FAR 252.204-7012, while the acquisition of covered telecommunications equipment is prohibited under FAR 252.204-7018. Hazardous materials handling follows IP025 and DFARS 252.223-7006, including proper labeling per OSHA HazCom standards, and ocean transport must use U.S.-flag vessels unless waived. Offerors must be certified small businesses with active SAM registration, UEI, and CAGE codes, and must affirm compliance with whistleblower protections, ethics rules, and prohibitions on internal confidentiality agreements. Invoicing must be submitted electronically via WAWF using the Invoice2in1 format, and all contractual obligations are governed by a comprehensive suite of FAR and DFARS clauses including those related to intellectual property, contract type, and

General Info

58 circuit breakers, NSN 5925200009867, $58 each, FOB origin, DLA Direct, small business set-aside, no mercury except exceptions.

NAICS

335313 - Switchgear and Switchboard Apparatus Manufacturing

Place of Performance

OH, USA

Set-Aside

SBA

Documents

1

RFQ SPE7M1-26-U-4762 for Indefinite Delivery Contract

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → MARITIME SUPPLY CHAIN
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
CIRCUIT BREAKER
CIRCUIT BREAKER
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
CRITICAL APPLICATION ITEM
PIVOTAL POWER INC 38370 P/N 841-01B-PPL ITEM NO 8
LINE ITEM 0000000001 TYPE OF COVERAGE: DLA DIRECT, CONUS
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 1000238077 0001 EA 58.000
This is an estimated quantity and may not be purchased by the IDC.
NSN/MATERIAL:5925200009867
DELIVERY (IN DAYS):0113
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
SPE7M1-26-U-4762
SECTION B
PR: 1000238077 PRLI: 0001 CONT’D
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:ZZ CLNG/DRY:1 PRESV MAT:ZZ
WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:C
UNIT CONT:ZZ OPI:O
INTRMDTE CONT:ZZ INTRMDTE CONT QTY:XXX
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
IP025: PACKAGING, MARKING, AND SHIPPING OF HAZARDOUS MATERIALS

SPE7M1-26-U-4762 NSN/Part Number: 5925-20-000-9867 Quantity: 58 EA Purchase Request: 1000238077QTY: 58 Delivery: 113 days ADO

More opportunities from Department Of Defense → MARITIME SUPPLY CHAIN

Same awarding agency

NAICS: 331318
New
DIBBS
WIRE, ELECTRICAL
Solicitation # SPE7M1-26-T-351R
Solicitation SPE7M1-26-T-351R is a request for quotations from the DLA Land and Maritime Maritime Supply Chain for the procurement of electrical wire, identified as a critical application item. The requirement consists of 51 feet of wire, specifically part number M81822/1-A26-0, which must be provided in one continuous length of 500 feet per spool. The material must adhere to basic specification MIL-W-81822/1A(1) and reference specification MIL-W-81822A(2) SUP 1, both dated June 25, 2009. Delivery is required within 20 days after order, with an original required delivery date of September 15, 2026, shipped FOB Origin to Ellsworth AFB, South Dakota. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E, MIL-DTL-12000 for cable and wire preservation, and MIL-STD-129 for marking. Packaging must also comply with DLA requirement RP001. Key restrictions include a prohibition on the intentional addition of mercury and compliance with the Berry Amendment and Buy American Act, requiring disclosure of any non-domestic materials. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment. Evaluation may include a price preference for SBA-certified HUBZone small businesses, and the submission of a Safety Data Sheet is required to be considered responsible for award.
Other Aluminum Rolling, Drawing, and Extruding

POSTED

about 17 hours ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS