Cisco Firewall Tray Mounts
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract seeks the fabrication and delivery of fifty-four custom metal mounting plates required for the installation of replacement firewall equipment on Littoral Combat Ship Freedom Variant ships. These plates are essential for a fleet modernization effort to enhance cybersecurity capabilities, as the new hardware differs from existing mounting points. The project is managed by the Naval Surface Warfare Center, Port Hueneme Division, with final engineering drawings expected in September 2026. The contractor must manufacture the plates according to government-furnished specifications, ensuring they are defect-free and suitable for shipboard use. Delivery is required in three phases to support an installation schedule starting in October 2026, with quantities of six plates by October 12, eighteen by November 1, and the remaining thirty by December 1. This sources-sought notice, identified by solicitation number N63394SIMACQ0003, requires responses by August 19, 2026.
General Info
Place of Performance
Port Hueneme, CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Statement of Need
Metal Mounting Plates for Firewall Replacement – LCS Freedom Variant Ships
1. Purpose
The purpose of this requirement is to procure fifty-four (54) custom-fabricated metal mounting plates to support the installation of replacement firewall equipment aboard Littoral Combat Ship (LCS) Freedom Variant ships. These mounting plates are required to provide a secure and standardized mounting solution for the new firewall hardware as part of the fleet modernization effort.
2. Background
The existing firewall equipment installed aboard LCS Freedom Variant ships is being replaced to improve cybersecurity capabilities and maintain compliance with current Navy network security requirements. Because the replacement firewall equipment differs from the existing firewall’s mounting points, custom mounting plates are required to facilitate installation while maintaining proper fit, alignment, and structural integrity within the designated equipment spaces.
The Engineering Design Lab (EDL) at Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD), is currently designing the mounting plate. The final engineering drawing is expected to be completed in September 2026.
3. Requirement
The Government requires the fabrication and delivery of fifty-four (54) metal mounting plates manufactured in accordance with the Government-furnished engineering drawing and associated technical specifications.
The contractor shall:
- Fabricate fifty-four (54) metal mounting plates in strict accordance with the final Government-provided engineering drawing.
- Utilize the material, dimensions, tolerances, finishes, and fabrication processes specified in the drawing package.
- Deliver completed mounting plates free of defects and suitable for shipboard installation.
- Package and protect the fabricated parts to prevent damage during shipment.
The Government will furnish the final engineering drawing upon contract award or when the drawing package is released by the Engineering Design Lab.
4. Schedule
- Final engineering drawing available: September 2026
- Fabrication to begin following receipt of the approved drawing package.
- Initial ship installation is planned for October 2026; therefore, fabrication and delivery shall support this installation schedule.
5. Desired Outcome
The fabricated mounting plates will enable timely installation of replacement firewall equipment aboard LCS Freedom Variant ships, minimizing installation delays and supporting fleet cybersecurity modernization efforts.
Also, to support our current ship installation schedule, if we could have the 54 plates delivered by:
- QTY 6 by 12 OCT 2026
- QTY 18 by 01 NOV 2026
- QTY 30 by 01 DEC 2026
Please response to the following questions:
- What tolerances are acceptable?
- What drawing format is acceptable?
- Can you accept Distribution D/CUI drawings?
More opportunities from Department Of Defense → Commanding Officer
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS