Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

City College of San Francisco Parking Structure Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City College of San Francisco Parking Structure Project is planned for a 68,000-square-foot site at 95 Frida Kahlo Way on the Ocean Campus, featuring a five-level parking garage with a footprint of approximately 200,000 square feet and a maximum height of 52.5 feet to the parapet, with provisions to later install photovoltaic panels extending the structure to approximately 58 feet above grade. The facility will offer around 641 vehicle parking spaces, including dedicated areas on the ground floor for the Campus Police Department and Custodial Services, totaling about 7,500 square feet. The design incorporates future-ready infrastructure to support solar energy integration without requiring major structural modifications. The project’s environmental review is guided by a Draft Supplemental Environmental Impact Report that updates the original 2021 Facilities Master Plan EIR, addressing new conditions and modifications as required under CEQA guidelines. The draft ensures compliance with state regulations by evaluating the cumulative and project-specific environmental impacts of constructing the parking structure, including traffic, noise, air quality, and land use effects. This effort supports the college’s broader goals to improve campus accessibility and sustainability while meeting growing parking demand. The project is managed by the San Francisco Community College District, with primary contact information available through Associate Vice Chancellor Alberto Vasquez, and all official documentation can be referenced via the state’s CEQA database.

General Info

Six-level parking garage with 641 spaces, solar-ready, at CCSF Ocean Campus, per CEQA guidelines.

Agency

California → San Francisco Community College District

Place of Performance

Frida Kahlo Way and North Road, San Francisco, CA, 94112

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Francisco Community College District
Office AddressN/A
Contacts
Alberto VasquezAssociate Vice Chancellor

Full Description

Show more
The proposed CCSF Parking Structure Project would be located on a 68,000-square-foot (1.55-acre) site located at 95 Frida Kahlo Way within the CCSF Ocean Campus. The Ocean Campus Parking Structure Project would have a footprint of approximately 200,000 square feet and would consist of five above-ground levels. The parking garage would have a height of up to approximately 52.5 feet to the top of the building parapet. The parking garage would be designed to accommodate the future installation of photovoltaic panels and their associated structures above the building's uppermost deck. The top level of the photovoltaic structure installation would be approximately 58 feet above grade. The parking garage would provide approximately 641 vehicle parking spaces with designated space on the ground floor for the Campus’ Police Department (about 4,000 square feet) and Custodial Services (3,500 square feet). The Draft SEIR serves as a supplement to update the analysis presented in the CCSF’s Updated Facilities Master Plan EIR, which was certified by the College on June 24, 2021 (State Clearinghouse No. 2020090261). The Draft SEIR specifically addresses the development of a parking garage at the Ocean Campus and contains additions or changes to the 2021 EIR necessary to evaluate the proposed changes to the Project and changed circumstances under State CEQA Guidelines section 15163 and Public Resources Code section 21166.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 25, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is designated as Riverside or Los Angeles. A critical component of this contract is strict adherence to six Disadvantaged Business Enterprise Good Faith Efforts (GFE) required to secure project financing. These efforts include outreach and recruitment, specific publicity requirements involving a 30-day online posting and a one-day print newspaper advertisement, subcontracting considerations for large firms, encouraging DBE grouping, and the utilization of the Small Business Administration and Minority Business Development Agency. Bidders must submit proof of compliance for GFE #2 and GFE #5 within their bid package; failure to do so, or failure to complete these efforts before the bid opening date, will result in the proposal being deemed non-responsive. Documentation for outreach efforts may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. Responses are due by November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted dormitory rooms, offices, and medical areas across three floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, and rubber wall base installation, as well as necessary plumbing and electrical work to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, a 90-day bid guarantee, and compliance with the Davis-Bacon Act, OSHA, EPA, and NFPA-101 life safety codes. Contractors must also provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured and adhere to specific federal minimum wage and paid sick leave mandates.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This solicitation is set aside for various small business categories, and interested parties must contact Rahul Maheshwari by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Request for Proposal for a single firm fixed price contract to perform comprehensive interior renovations of Building 262, and potentially Buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes modernizing interior finishes by replacing corridor and classroom flooring with composite modular materials and LVP, renovating restrooms with new vanities and lavatories, and updating electrical systems with dimming controls and new ceiling fans. Additionally, the project requires the installation of raised flooring, replacement of variable air volume HVAC systems, and the correction of plumbing deficiencies. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, where price, past performance, and corporate relevant experience are weighted with equal importance. Offerors must provide performance and payment bonds totaling 100 percent of the contract price and adhere to Davis-Bacon prevailing wage determinations for the Georgia region. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must be organized into specific tabs including the SF 1442, a detailed bid schedule in Excel, and financial information. Technical requirements mandate compliance with ADA accessibility guidelines and strict adherence to material storage and labeling standards for wood and electrical components.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project includes electrical distribution and lighting upgrades, building automation controls, hazardous materials abatement, and site improvements such as paving, drainage, and utility repairs. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Award will be based on the lowest price. Bidders must adhere to strict quality control standards using a three-phase control system and comply with the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Administrative requirements include monthly invoicing via Wide Area Work Flow and the submission of detailed performance reports and certifications. All work must comply with ADA accessibility guidelines and specific technical standards for piping, lighting, and cybersecurity for facility control systems.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS