Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City Hall Gas Service Relocation Project No. 9612.01

Closed
9612.01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 484210
New
International
Relocation of historical and archaeological Collections to Parks Canada
Solicitation # 5P300-26-0063/A
Parks Canada Agency is seeking a qualified contractor for solicitation 5P300-26-0063/A to plan and execute the physical relocation of historical and archaeological collections, documentation, specialized equipment, and office assets. The project involves moving these unique assets from two facilities in Quebec City, specifically the Beauport and Newton reserves, to a new purpose-built Collections and Curatorial Centre in Gatineau, Quebec. The contract period runs from December 1, 2026, to June 30, 2027, with substantial completion required by the end date. The scope includes comprehensive packing, crating, and securing of museum-grade assets under the supervision of Parks Canada specialists, with specific requirements for handling archaeology boxes and historic stoves. Award selection is based on the highest compliant combined rating of technical merit, price, and an Indigenous Participation Plan, which accounts for 10 percent of the total evaluation. Technical evaluation focuses on the bidder's experience with large-volume moves exceeding 2500 cubic meters and the handling of specialized historical artifacts. Mandatory requirements for bidders include attendance at site visits in Quebec City and Gatineau and the submission of bids via a designated email address or fax. All contractor personnel must obtain Reliability Status security clearance and maintain commercial general liability insurance of at least 2 million dollars. Payment is based on firm unit prices for relocation execution and actual cost plus a mark-up for materials, with invoices requiring an accompanying Indigenous Participation Plan progress report.
Parks Canada Agency

POSTED

6 days ago

DEADLINE

in 1 day
NAICS: 484210
Federal
V--SD Ecological Services Office Relocation
Solicitation # 140FF027Q0041
The U.S. Fish and Wildlife Service is soliciting quotes for a firm-fixed price contract to relocate the South Dakota Ecological Services Office in Pierre, South Dakota. This 100 percent Small Business set-aside project involves the packing, disassembly of modular furniture, transportation, and placement of approximately 3,500 square feet of office and garage contents into a designated storage unit. The contractor is responsible for providing all personnel, equipment, and packing materials, while ensuring that property designated for disposal is removed in accordance with federal and state regulations. Hazardous materials are excluded from the scope of work and will be handled separately by the government. The period of performance is scheduled from February 15, 2027, to February 26, 2027. Award decisions will be based on a trade-off between price, technical capability, and past performance, with technical conformance weighted more favorably than price. Offerors must provide two to three examples of prior work and submit quotes by November 30, 2026. Payments will be processed electronically through the Invoice Processing Platform. The contract incorporates various Federal Acquisition Regulation clauses, including requirements for sustainable products, biobased product reporting, and adherence to Department of Labor wage determinations for Hughes County, South Dakota.
Fws Contracting Activity

POSTED

7 days ago

DEADLINE

in 13 days
NAICS: 484210
Federal
V301--539 - Fifth Floor Pharmacy Move Service Contract
Solicitation # 36C25027Q0106
The Cincinnati Veterans Administration Medical Center requires specialized relocation services to move its inpatient pharmacy from the fifth floor to the second floor, with the eighth floor serving as a backup depending on availability. This firm-fixed-price contract, with a projected period of performance from November 2026 to May 2027, involves the disassembly, packing, transport, and reassembly of medical equipment, workstations, and furniture. A critical component of the scope is the provision of controlled environment certification services for non-hazardous pharmacy IV hoods, including laminar flow bench certification, operational particle counts, air sampling, and smoke pattern digital recording. After a temporary period of two to four weeks, the contractor will be required to move all equipment back to its original location on the fifth floor. The contractor must provide all necessary labor, vehicles, and packing materials, including RAM-board for floor protection. Key requirements include the submission of a Certificate of Public Convenience and Necessity from the Ohio PUCO and liability insurance that covers the value of the relocated equipment and facility damages. Performance will be validated through a final walkthrough and functional inspection conducted by the COR and technical personnel within 72 business hours of the move. Security protocols strictly prohibit contractor access to the VA network or any patient and employee PII/PHI. The project requires a dedicated team including a site supervisor, movers, truck drivers, and room certification testers.
250-NETWORK Contract Office 10 (36C250)

POSTED

7 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City Hall Gas Service Relocation project in Salinas, California, involves comprehensive modifications to the existing natural gas infrastructure to facilitate building updates or safety improvements. The scope includes removing and capping the current gas meter and piping, installing new gas meters, earthquake valves, pressure regulators, and risers, as well as connecting these components into existing service lines. The project also encompasses trenching, backfilling, coordination with Pacific Gas & Electric (PG&E) and other utilities, and ensuring all work adheres to construction best practices, traffic control measures, and restoration requirements as detailed in the project plans and special provisions. The contract aims to ensure a seamless transition of gas services with minimal disruption, emphasizing safety, compliance, and coordination with utility providers. The solicitation for this project, titled City Hall Gas Service Relocation Project No. 9612.01, was posted on September 3, 2025, with a response deadline of September 30, 2025. The project is valued between $50,000 and $150,000 and is managed by the City of Salinas, California. Interested contractors are directed to contact Jonathan Esteban via email or phone for further details and can access additional project information through the provided online portal. The contract emphasizes the importance of detailed planning, utility coordination, and adherence to safety standards to successfully complete the gas service relocation, supporting the city's infrastructure resilience and operational safety.

General Info

Documents

1
PDF, High priority: read this firstitb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ITB 2026B089Open now, due in 8 days
  • Corporate Furniture Moving and Reconfiguration ServicesOpen now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Salinas
Contacts1 person available
OfficeN/A

Full Description

Show more
The City Hall Gas Service Relocation includes but is not limited to: the removal of existing gas meter, cap piping and abandon in place; removal and capping of sections of existing gas pipes; installation of new gas meter, earthquake valve, gas pipe, pressure regulator, riser; connection into existing service pipes; coordination with PG&E and other utilities; trenching and backfilling; mobilization; construction best management practices; traffic control; and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions. PG&E drawings are included for further details on project scope and coordination.

More opportunities from California → City of Salinas

Same awarding agency

NAICS: 237310
SLED
2026 Citywide Sidewalk Repair Project
Solicitation # 9720
The 2026 Citywide Sidewalk Repair Project (CIP No. 9720) is a solicitation by the City of Salinas, California, for the comprehensive repair of citywide sidewalks. The scope of work includes the demolition and removal of curbs, gutters, driveway approaches, and cross gutters, as well as the disposal of existing trees and stumps. All construction must adhere to the 2008 City of Salinas Standard Specifications and the 2008 ADA Standards for Accessible Design and Build. The project is divided into two primary deliverables: Base Bid No. 1, which must be completed within 155 working days, and Base Bid No. 2, which must be completed within 25 working days. These timelines exclude a 15-calendar-day period for material submittals and a 180-calendar-day plant establishment and maintenance period. The contract will be awarded to the lowest responsive and responsible bidder based on the total of Base Bid No. 1-2 (Items 1-38). To be considered valid, bidders must submit all required City of Salinas forms, provide proof of active contractor licensing, and submit a bid bond equal to 10% of the bid amount. Post-award requirements include the provision of performance and payment bonds, as well as adherence to prevailing wage rates as determined by the Director of the DIR. Bids must be submitted electronically via the PlanetBids website by 2:00 PM PST on November 23, 2026. Project administration is led by Project Manager Victoria Gutierrez and City Engineer Adriana Robles, P.E., with final acceptance contingent upon a review following the 180-day plant maintenance period.
Highway, Street, and Bridge Construction

POSTED

18 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS